Loading...
Duke Freeport- LR160613 (2)June 13, 2016 Duke Realty South/West Region 14241 North Dallas Parkway, Suite 1000 ATTN:Mr. Sean Jeanes, P.E. LEED AP Tohatsu Location: Permits: Dallas, TX 75254 19:6710-A NEC Bethel Road and Freeport Parkway Coppell, TX RE: ECS Job # 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] ECS Texas, LLP LETTER OF TRANSMITTAL Texas Registered Engineering Firm # F-8461 CC:Duke Realty - Todd Henry Duke Realty - Glen Stevenson Pacheco Koch Consulting Engineers - Clayton J. Strolle, LEED AP City of Coppell - Matt Mabry Weir Bros., Inc. - Mike Weir Meinhardt & Associates - David Meinhardt LJB inc - Jim Lintz ENCL: We are enclosing: Materials Engineering Division Reports For your use As requested X X X Field Report # 60 06/10/2016 Footings Timothy TarbuttonMark R. Zortman, P.E. Principal Engineer Project ManagerJUN 13 2016 1000.1 This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS. ECS Texas, LLP 19:6710-A 60 Tohatsu Friday 06/10/2016 Project No. Report No. Day & DateProject 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] FIELD REPORT 3.75 The undersigned arrived on site, as requested, to observe the placement of 27 cubic yards of 3000 psi concrete for Continuous Footings at H-L/1. The required test limits were determined to be a slump of 3-5 inches, air content of 0-3 %, batch to placement time of 90 minutes, and concrete temperature range of 50-95 degrees Fahrenheit. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, air content, and batch to placement time. One set of five laboratory cured concrete cylinders were cast for compressive strength testing in our laboratory. 89°/ Sunny 55.00 2.50 0.50 0.00 07:30A 10:00A Footings Location Contractor On-Site Time Lab Time Client Coppell, TX Arrival Departure Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Duke Realty - Sean Jeanes, P.E. LEED AP Duke Realty - Sean Jeanes, P.E. LEED AP Trip Charges* Remarks Chargeable Items Weather 1 - Nuclear Gauge Rental Mileage* 0.75Travel Time* Total Time of Re Obs.Time * Travel time and mileage will be billed in accordance with the contract. Tolls/Parking* Milton E. Perez, — Field TechnicianBy 1705 1083337 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 1 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 06/10/2016 Duke Realty Sunny / 89 Duke Realty LMC Mix Designation:5150 Mix Strength:3000 psi Design Strength:3000 psi B to P min. 1 0001 62997857 9.0 9.0 07:57 08:35 08:58 *5.00 1.50(P)8561 2 3035 62997859 9.0 18.0 08:07 08:36 09:02 5.0055 3 7017 64408453 9.0 27.0 08:29 09:05 09:48 5.0079 * Location:By:Milton E. PerezContinuous Footing at H-L/1 ECS Texas, LLP WO:62729 * B to P - Batch to Placement time in minutes 2000.1.1.0