Loading...
Duke Freeport- LR160613 (3)June 13, 2016 Duke Realty South/West Region 14241 North Dallas Parkway, Suite 1000 ATTN:Mr. Sean Jeanes, P.E. LEED AP Tohatsu Location: Permits: Dallas, TX 75254 19:6710-A NEC Bethel Road and Freeport Parkway Coppell, TX RE: ECS Job # 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] ECS Texas, LLP LETTER OF TRANSMITTAL Texas Registered Engineering Firm # F-8461 CC:Duke Realty - Todd Henry Duke Realty - Glen Stevenson Pacheco Koch Consulting Engineers - Clayton J. Strolle, LEED AP City of Coppell - Matt Mabry Weir Bros., Inc. - Mike Weir Meinhardt & Associates - David Meinhardt LJB inc - Jim Lintz ENCL: We are enclosing: Materials Engineering Division Reports For your use As requested X X X Field Report # 59 06/09/2016 Footings, Compact Timothy TarbuttonMark R. Zortman, P.E. Principal Engineer Project ManagerJUN 13 2016 1000.1 This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS. ECS Texas, LLP 19:6710-A 59 Tohatsu Thursday 06/09/2016 Project No. Report No. Day & DateProject 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] FIELD REPORT 8.25 The undersigned arrived on site, as requested, to observe: 1. The compaction of soils for Pavement East Side of the Building Pad and Storm Line Backfill. Utilizing the nuclear test method to check the compaction of soils; test results indicated that the compacted material, at the areas and elevations tested, met or exceeded the project requirements of 95% of the maximum dry density as obtained in our laboratory using the ASTM D 698-12 Method A Standard. Locations and elevations of all tests are based on stakeout provided by others. We cannot be responsible for structures located off of the observed engineered pad, misaligned utilities or stakeout errors causing uncontrolled fill to be placed in structural areas. 2. The bearing capacity of soil of Continuous Footings at grid lines H-J.5/1. Utilizing a Dynamic Cone Penetrometer (ASTM STP-399) to check the bearing capacity of soil at the aforementioned locations, test results indicated that soils, at the areas and elevations tested, should be capable of supporting a foundation designed for a net allowable bearing capacity 3000 psf. 90°/ Sunny 55.00 6.50 0.75 0.00 09:30A 04:00P Footings, Compact Location Contractor On-Site Time Lab Time Client Coppell, TX Arrival Departure Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Duke Realty - Sean Jeanes, P.E. LEED AP Duke Realty - Sean Jeanes, P.E. LEED AP Trip Charges* Remarks Chargeable Items Weather Mileage* 1.00Travel Time* Total Time of Re Obs.Time * Travel time and mileage will be billed in accordance with the contract. Tolls/Parking* Milton E. Perez, — Field TechnicianBy 1705 1083177 Report of Spread Footing - Foundation Observations Project: Location: Contractor: Project No. Day/Date: LocationFooting Number Size (W x H x L) Design Actual Footing Bottom Elevation Depth of Undercut (in) Description of Steel Placed Description of Subgrade Material # of Blows / increment Design Bearing Pressure Design Required Blow Counts Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell - Dallas County - TX - 75019- Duke Realty 06/09/16 2.5 x 2.5 x 25H,1 2.5 x 3.5 x 25 97.5 2.5 .1 3 #5 Top & 5 #5 Bottom CLAYEY Sand 8 11.9 3000 2.5 x 2.5 x 25H5,1 2.5 x 3.5 x 25 97.5 2.5 .2 3 #5 Top & 5 #5 Bottom CLAYEY Sand 8 15.4 3000 2.5 x 2.5 x 25J,1 2.5 x 3.5 x 25 97.5 2.5 .3 3 #5 Top & 5 #5 Bottom CLAYEY Sand 8 14.4 3000 2.5 x 2.5 x 25J5,1 2.5 x 3.5 x 25 97.5 2.5 .4 3 #5 Top & 5 #5 Bottom CLAYEY Sand 8 10.1 3000 ECS Texas, LLP By:Milton E. Perez WO:62670 ECS TEXAS, LLP Test Method ASTM Nuclear Project No: Contractor: Project Name:Date: Client: Page 1 Technician: Nuclear Gauge No. Make Model Ser. No. Density Std Moisture Std 6710-A Tohatsu 06/09/16 Duke Realty Duke Realty Milton E. Perez 8899 Humbolt 5001-EZ 5001EZ 2505 348 Field Compaction Summary, ASTM Nuclear Description Proctor Method Uncorrected Max. Density Uncorrected Opt. MCSample No. D4S-5 Clayey SAND, Light Brown ASTM D 698-12 Method A Standard 116.70 11.40 Test Data Test No. Test Mode Station / Location Probe Depth (in.) Lift / Elev Corrected Maximum Dry Density (pcf) Corrected Optimum Moisture Content (%) % Oversize Wet Density (pcf) Dry Density (pcf) Moisture Content (%) Percent Comp. (%)CommentsP / F Sample No. 1 DT 6 Pavement East Side of Building Pad SG 0.00 116.70 11.40 133.2 115.6 15.2 99.1 P Re-test of test 1 taken 06/06/16 D4S-5 2 DT 6 Pavement East Side of Building Pad SG 0.00 116.70 11.40 125.9 112.6 11.8 96.5 PD4S-5 3 DT 6 Pavement East Side of Building Pad SG 0.00 116.70 11.40 127.5 113.6 12.2 97.3 P Re-test of test 4 taken on 06/06/16 D4S-5 4 DT 6 Pavement East Side of Building Pad SG 0.00 116.70 11.40 126.2 111.2 13.5 95.3 PD4S-5 5 DT 6 Storm Sewer Line ST-3 STA 0+00 SG-7'0.00 116.70 11.40 128.0 111.6 14.7 95.6 PD4S-5 6 DT 6 Storm Sewer Line ST-3 STA 0+00 SG-6'6 " 0.00 116.70 11.40 128.4 112.7 13.9 96.6 PD4S-5 7 DT 6 Storm Sewer Line ST-3 STA 0+00 SG-6'0.00 116.70 11.40 131.6 111.0 18.6 95.1 PD4S-5 8 DT 6 Storm Sewer Line ST-3 STA 0+00 SG-5'6 " 0.00 116.70 11.40 130.8 112.6 16.1 96.5 PD4S-5 9 DT 6 Storm Sewer Line ST-3 STA 0+00 SG-5'0.00 116.70 11.40 130.3 112.1 16.2 96.1 PD4S-5 10 DT 6 Storm Sewer Line ST-3 STA 0+00 SG-4'6 " 0.00 116.70 11.40 128.4 111.0 15.6 95.1 PD4S-5 11 DT 6 Storm Sewer Line ST-3 STA 0+00 SG-4'0.00 116.70 11.40 126.6 111.7 13.3 95.7 PD4S-5 Test Mode: DT = Direct Transmission BS = Back Scatter WO:62670 ECS TEXAS, LLP Test Method ASTM Nuclear Project No: Contractor: Project Name:Date: Client: Page 2 Technician: Nuclear Gauge No. Make Model Ser. No. Density Std Moisture Std 6710-A Tohatsu 06/09/16 Duke Realty Duke Realty Milton E. Perez 8899 Humbolt 5001-EZ 5001EZ 2505 348 Field Compaction Summary, ASTM Nuclear Test Data Test No. Test Mode Station / Location Probe Depth (in.) Lift / Elev Corrected Maximum Dry Density (pcf) Corrected Optimum Moisture Content (%) % Oversize Wet Density (pcf) Dry Density (pcf) Moisture Content (%) Percent Comp. (%) P / F Sample No. Comments 12 DT 6 Storm Sewer Line ST-3 STA 0+00 SG-3'6 " 0.00 116.70 11.40 127.9 114.0 12.2 97.7 PD4S-5 13 DT 6 Storm Sewer Line ST-3 STA 0+00 SG-3'0.00 116.70 11.40 128.2 112.8 13.6 96.7 PD4S-5 14 DT 6 Storm Sewer Line ST-3 STA 0+00 SG-2'6 " 0.00 116.70 11.40 126.2 112.8 11.9 96.7 PD4S-5 15 DT 6 Storm Sewer Line ST-3 STA 0+00 SG-2'0.00 116.70 11.40 128.3 112.3 14.2 96.2 PD4S-5 16 DT 6 Storm Sewer Line ST-3 STA 0+00 SG-1'6 " 0.00 116.70 11.40 127.1 111.5 14.0 95.5 PD4S-5 17 DT 6 Storm Sewer Line ST-3 STA 0+00 SG-1'0.00 116.70 11.40 128.3 111.1 15.5 95.2 PD4S-5 18 DT 6 Storm Sewer Line ST-3 STA 0+00 SG-6"0.00 116.70 11.40 127.7 112.5 13.5 96.4 PD4S-5 19 DT 6 Storm Sewer Line ST-3 STA 0+10 SG-4'0.00 116.70 11.40 129.0 113.1 14.0 96.9 PD4S-5 20 DT 6 Storm Sewer Line ST-3 STA 0+10 SG-3'6 " 0.00 116.70 11.40 128.5 114.5 12.2 98.1 PD4S-5 21 DT 6 Storm Sewer Line ST-3 STA 0+10 SG-3'0.00 116.70 11.40 127.4 112.2 13.5 96.1 PD4S-5 22 DT 6 Storm Sewer Line ST-3 STA 0+10 SG-2'6 " 0.00 116.70 11.40 129.0 114.7 12.5 98.3 PD4S-5 23 DT 6 Storm Sewer Line ST-3 STA 0+10 SG-2'0.00 116.70 11.40 128.0 112.6 13.6 96.5 PD4S-5 24 DT 6 Storm Sewer Line ST-3 STA 0+10 SG-1'6 " 0.00 116.70 11.40 127.2 113.2 12.4 97.0 PD4S-5 Test Mode: DT = Direct Transmission BS = Back Scatter WO:62670 ECS TEXAS, LLP Test Method ASTM Nuclear Project No: Contractor: Project Name:Date: Client: Page 3 Technician: Nuclear Gauge No. Make Model Ser. No. Density Std Moisture Std 6710-A Tohatsu 06/09/16 Duke Realty Duke Realty Milton E. Perez 8899 Humbolt 5001-EZ 5001EZ 2505 348 Field Compaction Summary, ASTM Nuclear Test Data Test No. Test Mode Station / Location Probe Depth (in.) Lift / Elev Corrected Maximum Dry Density (pcf) Corrected Optimum Moisture Content (%) % Oversize Wet Density (pcf) Dry Density (pcf) Moisture Content (%) Percent Comp. (%) P / F Sample No. Comments 25 DT 6 Storm Sewer Line ST-3 STA 0+10 SG-1'0.00 116.70 11.40 128.7 113.9 13.0 97.6 PD4S-5 26 DT 6 Storm Sewer Line ST-3 STA 0+10 SG-6"0.00 116.70 11.40 128.5 111.4 15.3 95.5 PD4S-5 Test Mode: DT = Direct Transmission BS = Back Scatter WO:62670