Loading...
Duke Freeport- LR160613 (4)June 13, 2016 Duke Realty South/West Region 14241 North Dallas Parkway, Suite 1000 ATTN:Mr. Sean Jeanes, P.E. LEED AP Tohatsu Location: Permits: Dallas, TX 75254 19:6710-A NEC Bethel Road and Freeport Parkway Coppell, TX RE: ECS Job # 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] ECS Texas, LLP LETTER OF TRANSMITTAL Texas Registered Engineering Firm # F-8461 CC:Duke Realty - Todd Henry Duke Realty - Glen Stevenson Pacheco Koch Consulting Engineers - Clayton J. Strolle, LEED AP City of Coppell - Matt Mabry Weir Bros., Inc. - Mike Weir Meinhardt & Associates - David Meinhardt LJB inc - Jim Lintz ENCL: We are enclosing: Materials Engineering Division Reports For your use As requested X X X Field Report # 58 06/08/2016 Footings Timothy TarbuttonMark R. Zortman, P.E. Principal Engineer Project ManagerJUN 13 2016 1000.1 This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS. ECS Texas, LLP 19:6710-A 58 Tohatsu Wednesday 06/08/2016 Project No. Report No. Day & DateProject 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] FIELD REPORT 10.00 The undersigned arrived on site, as requested, to observe: 1. The bearing capacity of soil of Continuous Footings at grid lines E-L/1. Utilizing a Dynamic Cone Penetrometer (ASTM STP-399) to check the bearing capacity of soil at the aforementioned locations, test results indicated that soils, at the areas and elevations tested, should be capable of supporting a foundation designed for a net allowable bearing capacity 3000 psf. Continuous Footing from H-L/1 require approximately 12 inch undercut to achieve the required bearing capacity. 2. The placement of 19 cubic yards of 3000 psi concrete for Continuous Footings at Grind lines E-G.5/1. The required test limits were determined to be a slump of 3-5 inches, air content of 0-3 %, batch to placement time of 90 minutes, and concrete temperature range of 50-95 degrees Fahrenheit. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, air content, and batch to placement time. One set of five laboratory cured concrete cylinders were cast for compressive strength testing in our laboratory. 92°/ Sunny 55.00 8.00 1.00 0.00 09:30A 05:30P Footings Location Contractor On-Site Time Lab Time Client Coppell, TX Arrival Departure Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Duke Realty - Sean Jeanes, P.E. LEED AP Duke Realty - Sean Jeanes, P.E. LEED AP Trip Charges* Remarks Chargeable Items Weather Mileage* 1.00Travel Time* Total Time of Re Obs.Time * Travel time and mileage will be billed in accordance with the contract. Tolls/Parking* Milton E. Perez, — Field TechnicianBy 1705 1083143 Report of Spread Footing - Foundation Observations Project: Location: Contractor: Project No. Day/Date: LocationFooting Number Size (W x H x L) Design Actual Footing Bottom Elevation Depth of Undercut (in) Description of Steel Placed Description of Subgrade Material # of Blows / increment Design Bearing Pressure Design Required Blow Counts Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell - Dallas County - TX - 75019- Duke Realty 06/08/16 2.5 x 2.5 x 25E,1 2.5 x 2.5 x 25 97.5 2.5 .1 3 #5 Top & 5 #5 Bottom CLAYEY Sand 8 8.2 3000 2.5 x 2.5 x 25E5,1 2.5 x 2.5 x 25 97.5 2.5 .2 3 #5 Top & 5 #5 Bottom CLAYEY Sand 8 9.1 3000 2.5 x 2.5 x 25F,1 2.5 x 2.5 x 25 97.5 2.5 .3 3 #5 Top & 5 #5 Bottom CLAYEY Sand 8 8 3000 2.5 x 2.5 x 25F5,1 2.5 x 2.5 x 25 97.5 2.5 .4 3 #5 Top & 5 #5 Bottom CLAYEY Sand 8 8.6 3000 2.5 x 2.5 x 25G,1 2.5 x 2.5 x 25 97.5 2.5 .5 3 #5 Top & 5 #5 Bottom CLAYEY Sand 8 8.3 3000 2.5 x 2.5 x 25G5,1 2.5 x 2.5 x 25 97.5 2.5 .6 3 #5 Top & 5 #5 Bottom CLAYEY Sand 8 8.3 3000 2.5 x 2.5 x 25H,1 2.5 x 2.5 x 25 97.5 2.5 .7 3 #5 Top & 5 #5 Bottom CLAYEY Sand 8 7.4 3000 2.5 x 2.5 x 25H5,1 2.5 x 2.5 x 25 97.5 2.5 .8 3 #5 Top & 5 #5 Bottom CLAYEY Sand 8 7.1 3000 ECS Texas, LLP By:Milton E. Perez WO:62628 Report of Spread Footing - Foundation Observations Project: Location: Contractor: Project No. Day/Date: LocationFooting Number Size (W x H x L) Design Actual Footing Bottom Elevation Depth of Undercut (in) Description of Steel Placed Description of Subgrade Material # of Blows / increment Design Bearing Pressure Design Required Blow Counts Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell - Dallas County - TX - 75019- Duke Realty 06/08/16 2.5 x 2.5 x 25J,1 2.5 x 2.5 x 25 97.5 2.5 .9 3 #5 Top & 5 #5 Bottom CLAYEY Sand 8 7.8 3000 2.5 x 2.5 x 25J5,1 2.5 x 2.5 x 25 97.5 2.5 .10 3 #5 Top & 5 #5 Bottom CLAYEY Sand 8 7.6 3000 2.5 x 2.5 x 25K,1 2.5 x 2.5 x 25 97.5 2.5 .11 3 #5 Top & 5 #5 Bottom CLAYEY Sand 8 8.1 3000 6 x 2.5 x 6K5,1 6 x 2.5 x 6 97.5 2.5 .12 2 #4 Cont W / 4 #5 Top & Bottom CLAYEY Sand 8 8.1 3000 6 x 2.5 x 8L,1 6 x 2.5 x 8 97.5 2.5 .13 2 #4 Cont W . 4 #5 Top & Bottom CLAYEY Sand 8 6.9 3000 ECS Texas, LLP By:Milton E. Perez WO:62628 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 1 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 06/08/2016 Duke Realty Sunny / 92 Duke Realty LMC Mix Designation:5150 Mix Strength:3000 psi Design Strength:3000 psi B to P min. 1 5007 64408260 9.0 9.0 03:27 04:08 04:28 *4.00 2.10(P)9061 2 9107 64408261 9.0 18.0 03:32 04:13 04:45 73 * Location:By:Milton E. PerezContinuous Footing at Grid Lines E-G.5/1 ECS Texas, LLP WO:62628 * B to P - Batch to Placement time in minutes 2000.1.1.0