Loading...
ST0301C- LR1606504G1 • GEOTECHNICAL ENGINEERING • ENVIRONMENTAL CONSULTING GEE Consultants, Inc. L�J • CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive 0 Dallas, Texas 75229 (214) 352-5433 • Fax (214) 352-6972 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 43 (215-140) Method: ASTM D2922 D3017 D698 Page 1 of 3 Client: City of Coppell Project: Bethel & Coppell Rd. Test Date: May 4, 2016. Report Date: May 5, 2016 Required Density (%): Min. 95% Required Moisture (%): General Fill - Opt. (I Moisture Content -2% to +4% Material Description Maximum Optimum Dry Density Moisture (Lbs./cu.ft.) Content (Percent) 1. Light Brown Clayey Sand 106.3 13.8 with Gravel 2. Dark Brown Clayey Sand with Organics 104.8 15.2 3. Brown and Yellowish Brown Clayey Sand 108.1 16.1 with Occasionally Lime Stone Fragments and Sand Pkts. 4. Brown and Reddish Brown Clayey Sand 115.3 11.8 with Lime Stone Gravel & Sandy Shale Fragments 5. Brown Sandy Clay (Lime Treated) (North 96.7 22.4 Side) 6. Brown Sandy Clay (Lime Treated) (South 103.0 19.0 Side) 7. Reddish Brown Clayey Sand and Reddish 112.2 14.0 Brown, Yellow Brown and light Gray Sandy Shaley Clay (Bethel Rd.) 8. Dark Gray and Gray Sandy Clay (Bethel 102.4 19.8 Rd.) 9. Dark Gray and Gray Sandy Clay ( Bethel 100.2 21.0 Rd., Lime Treated) 10. Reddish Brown Clayey Sand and Light 106.2 18.2 Gray Sandy Shaley Clay (Lime Treated) 11. Light Gray and Tan Clay with 95.3 23.0 Occasionally Gravel (Lime Treated, Station 26+00 to 27+00) City of Coppell May 5, 2016 cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell@coppelltx.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunas@coppelltx.gov Mr. George Marshall - City of Coppell via Email: gmarshall@coppelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill@tiseopaving.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products GEE Consultants, Inc. Project No. 215-140 In -Place Density Report No. 43 Page 2 of 2 Plaee 1n -Place 'Pereent ey Moisture Compaction 379 11 6 Bethel Rd., W. Bound, Station 27+50, 3' S. 103.0 21.0 108.1 of N. Edge 311 11i; te$tlbfTest#378' 96.9 22.6 cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell@coppelltx.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunas@coppelltx.gov Mr. George Marshall - City of Coppell via Email: gmarshall@coppelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill@tiseopaving.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products GEE Consultants, Inc. Project No. 215-140 In -Place Density Report No. 43 Page 2 of 2 iGI • GEOTECHNICAL ENGINEERING • ENVIRONMENTAL CONSULTING GEE Consultants, Inc. J1• CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972 REPORT OF IN-PLACE DENSITY AND MOISTURE OF SOIL Density Report No. 42 (215-140) Method: ASTM D2922 D3017 D698 Page I of 3 Client: City of Coppell Project: Bethel & Coppell Rd. Test Date: April 28, 2016 Report Date: May 4, 2016 Required Density (%): Min. 95% Required Moisture (%): General Fill - Opt. II Moisture Content -2% to +4% Material Description Maximum Optimum L tatxn7 � evathiu (abdlni) Llft, , : Dry Density Moisture Percent (Lbs./cu.ft.) Content Depth-; (Percent) 1. Light Brown Clayey Sand 106.3 13.8 W/ Gravel (1rtc11 ) 2. Dark Brown Clayey Sand W/ Organics 104.8 15.2 3. Brown and Yellowish Brown Clayey Sand 108.1 16.1 W/ OCC. LS Frags and Sand Pkts. 103.7 22.0 4. Brown and Reddish Brown Clayey Sand 115.3 11.8 W/ LS Gravel & Sandy Shale Frags 1+35, 3' Below Final Grade 5. Brown Sandy Clay (Lime Treated) (North 96.7 22.4 Side) I (1 bF t) , ( Wer 1 �e 3tt4 ulti1 6. Brown Sandy Clay (Lime Treated) (South 103.0 19.0 Side) 7. Reddish Brown Clayey Sand and Reddish 112.2 1.4.0 Brown, Yellow Brown and Light Gray Sandy 347 8 Shaley Clay (Bethel Rd.) Bethel Rd., 16" Water Line Main, Station 103.8 8. Dark Gray and Gray Sandy Clay (Bethel 102.4 19.8 Rd.) 1+35, 1' Below Final Grade 9. Dark Gray and Gray Sandy Clay ( Bethel 100.2 21.0 Rd., Lime Treated) 10. Reddish Brown Clayey Sand and Light 106.2 18.2 Gray Sandy Shaley Clay (Lime Treated) of `robn; L tatxn7 � evathiu (abdlni) Llft, , : Tn-Puce = to -Place Percent Tet lo„ i�lt►, Depth-; Dry;Deusity Moisture Compaction (1rtc11 ) (Lbs/Cu.Ft') Content (%) (%) 345 8 10 Bethel Rd., 16" Water Line Main, Station 103.7 22.0 101.3 1+35, 3' Below Final Grade 341 I (1 bF t) , ( Wer 1 �e 3tt4 ulti1 104 2 20.0 101.8 347 8 10 Bethel Rd., 16" Water Line Main, Station 103.8 19.9 101.4 1+35, 1' Below Final Grade 348 B t e Rd.;16", W4er L e (kla �, station 102.6 20.3 10x.2 349 8 10 Bethel Rd., 16 Water Line Main, Station 106.6 22.7 104.1 2+95, 3' Below Final Grade 35tt " 10 BethelAd.,16'!"Water Line Main, Station 100.8 22.6 2+95,2 ,Below Final Grade n City of Coppell May 4, 2016 351 8 10 1 Bethel Rd.,16" Water Line Main, Station 104.2 20.8 101.8 2+95, I'Below Final Grade I 353 8 10 1 Bethel Rd.,16" Water Line Main, Station 104.2 19.9 101.8 4+45, 3' Below Final Grade I 355 8 10 1 Bethel Rd.,16" Water Line Main, Station 104.1 21.3 101.7 4+45, I' Below Final Grade I 357 8 10 1 Bethel Rd.,16" Water Line Main, Station 100.6 20,0 98.2 6+00, 3' Below Final Grade I 359 8 10 1 Bethel Rd.,16"' Water Line Main, Station 106.6 20.6 104.1 6+00, I'Below Final Grade I ---------- 361 8 10 Bethel Rd.,16" Water Line Main, Station 103.8 19.8 101.4 1 7+60, 3' Below Final Grade II 363 I 7 10 1 Bethel Rd.,16" Water Line Main, StationI 111.0 I 16.9 I 98.9 (I 7+60, I' Below Final Grade 365 7 10 1 Bethel Rd., 24" Storm Drain, Line B, Station 4+90, 2' Below Final Grade 367 7 10 1 Bethel Rd., 24" Storm Drain, Line B, Station 4+90, on Final Grade 110.1 16.0 98.1 I I'l. 8 110.9 15.9 15.4 99.6 98.8 GEE Consultants, Inc. Project No. 215-140 In -Place Density Report No. 42 Page 2 of 3 City of Coppell 368 7 10 1 Bethel Rd., 16" Water Line Main, Station 10+00, 3' Below Final Grade May 4, 2016 110.2 1 15.9 1 98.2 11 370 7 10 1 Bethel Rd., 16" Water Line Main, Station 114.4 15.3 102.0 10+00, 1' Below Final Grade I II 372 I 8 6 I Bethel Rd., 30" Storm Drain, Line B, Station 2+30, 2' Below Final Grade II 374 I 7 10 1 Bethel Rd., 30" Storm Drain, Line B, Station 2+30, on Final Grade 104.4 1 20.4 1 102.0 11 110.1 1 15.5 1 98.1 cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell@coppelltx.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunas@coppelltx.gov Mr. George Marshall - City of Coppell via Email: gmarshall@coppelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill@tiseopaving.com I ) GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: k All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products GEE Consultants, Inc. Project No. 215-140 In -Place Density Report No. 42 Page 3 of 3