Loading...
Fountain Park 1-CS 930622June 22, 1993 Mr. Tim House Matthews Southwest 5220 Spring Valley//513 Dallas, TX 75240 RE: Fountain Park Development Fe Dear Mr. House: Enclosed is a copy of ti the development fee ca3 Please provide a check: of the construction cos Department, along witl Council approval of the or contract for this prq Please provide a copy verify payment of the We look forward to a hesitate to contact me. Sincerely, Kenneth M. Griffin, P City Engineer CC: Steve Goram, D Alan Johnson, ,t Greg Jones, Bui Doug Stevens, With A Beautiful Future P.O. Box 478 Coppell, Texas 75019 214-462-0022 ,ddition Assessment City of Coppell Development Fee Assessment list, along with a copy of culations for Fountain Park Addition. nade payable to the City of Coppell in the amount of $132,574.20, plus 2 % and forward it to Mr. Alan Johnson, Acting Finance Director, Finance a copy of the fee assessment list. This should be provided prior to City final plat. Also, please provide our office a copy of the Engineer's Estimate ect so the construction inspection fee can be verified. of your paid receipt to our offices, lgopies of your receipts will help us equired fees and assure a successful beginning of this project. )rking with you on this project. If you have any questions, please do not mo irector of Public Works ,cting Finance Director Lding Official ;,ngineering Technician Date: June 22, 1 Project: Fountain 993 ~ark Addition Park Fee (50% due prior tc Council Approval) (50% due at Issum~ee of Building Permit) Water Impact Fee (100% due prior t_9 Council Approval) Water Tap Inspection l~ee (100% due at Issu0nee of Building Permit) Wastewater Impact Fee. (100% due p.rior t~) Council Approval) Sewer Tap Inspection 1~ ee (100% due at Issu, Utility Final Inspection (100% due at Issu Water Meter Fee (Lotsl (100% due at Issu Water Meter Deposit (100% due at Issu Street Sign Fee (100% due prior Street Light Fee (100 % due prior Street Escrow(628.30/fl Construction Inspectio~ (2% of Project Cz Preconstruction 1~ Total TOTAL AMOUNT DU TO COUNCIL APPRC The water impact Cannot be assesse TOTAL $ 10,500.00 $ 19,500.00' $ 3,000.00 $ 6,750.00 $ 3,000.00 mee of Building Permit) Fee $ 1,500.00 nee of Building Permit) $ 667.50 nee of Building Permit) $ 900.00 ance of Building Permit) $ 546.20 ~ Council Approval) $ ** to Council Approval) x $160/ft) $ 100,528.00 ~Fee ~st due prior to eeting) $146.891.70 E PRIOR ,VAL fees do not include the fees for the irrigation meters. d until after TU Electric submits lighting plan. AMOUNT DUE PRIOR TO COUNCII, APPRQVAL $ 5,250.00 $ 19,500.00' $ -0- $ 6,750.00 $ -0- $ -0- $ -0- $ -o- $ 546.20 $ 100,528.00 $ 132,574.20 +2~ inspection fee DATE: June 17 TO: Ken Gri FROM: Public RE: Developz The following fee~ referenced projecl Water Impact Fee: 30 - 5/8" x 3~ Total 30 100% due prior to Wastewater Impact 30 - 5/8" x Total 30 100% due prior to Water Tap Inspect 30 Connections COPPELL PUBLIC WORKS MEMORANDUM 1993 'orks Staf ent Fees for Fountain Park should be assessed and collected on the above '4" Domestic Meter/s = 30 ESU's ESU's @ $650.00 ea = $ 19,500.00 Council approval of the final plat. (MUD) ~/4" Residential Meters = 30 ESU's ESU's @ $225.00 ea = $ 6,750.00 Council approval of the final plat. ion Fee ~ $i00.00 each = $ 3,000.00 100% due prior t~ issuance of building permit. (Or in the case of the irrigation m~ter-prior to issuance of meter). Sewer Tap Inspect 30 Connection~ 100% due prior tc ion Fee ~ $100.00 each = $ 3,000.00 issuance of building permit. Development Fees Page 2 Utility Final Ins 30 lots @ $5 100% due prior to Water Meter Fee (] 30 - 5/8" x 3/ 100% due prior to Water Meter Depos~ Residential - 30 100% due prior to Street Lighting ~ Shall be assessed Note: This fE submits plan is Street Signs Fee See attached Stre 100% due prior to Park Fee N/A Resident N/A Units (~ For those develo~ June 23, 1992 the 50% of the amount prior to Council 50% remaining sh building permit i ~ction Fee ~.O0/lot = $ 1.500.00 issuance of building permit. mts) ~. Residential Meters ~ $22.25 ea issuance of building permit. = $ 667.50 it meters @ $30.00 ea = $ 900.00 issuance of building permit. and paid prior to final acceptance of project. ~e cannot be assessed until after TU Electric the lighting plan for the proposed project. Once submitted $292.60 per light will be assessed. et Sign Assessment sheet. final acceptance of project. ial Lots at $150.00 each = $ N/A ulti family) at $75.00: each = $ N/A ~ents having preliminary plat approval prior to following assessment is determined: specified above shall be paid by the Developer; approval of final plat. all be paid by the Builder at such time as a s issued. Development Fees Page 3 For those developm~ 23, 1992 the follo 30 Residenti Units (Mu 50% of the amount prior to Council a 50% remaining sha building permit is Please advise the If you have any advise. HLP/dm Steven G. Got Director of · DEVFEES.HLP ~nts having preliminary plat approval after June ~ing assessment is determined: al Lots at $350.00 each = $ 10,500.00 lti-Family) at $350.00 each = $ specified above shall be paid by the Developer pproval of final plat. Zl be paid by the Builder at such time as a issued. Developer of these fees and due dates. questions regarding these assessments please am ublic Works Development Fees Page 4 for Fountain P~ The following asse of Coppell Subdiv~ following cost ol current pricing w~ SIGN No Parking Speed Limit Yield Stop Street Name Stop & Street Comk OTHER DEVFEES.HLP Cost breakdo~ request. STREET SIGN ASSESSMENT rk Addition ssment is being made in accordance with the City ision Ordinance Appendix A Chapter VIII A. The ~ those sign materials required are based on ich is reviewed on a regular basis. o UNIT PRICE QUANTITY EXTENDED PRICE $53.10 .... $63.54 5 317.70 SSa. 56 .... $65.12 .... $11.60 3 34. ao $96.85 2 193.70 TOTAL 546.20 Revised 12/15/92 ns may be obtained from Public Works by written