Loading...
Fountain Park 1-CS 930609 (2)The City With A Be ' June 9, 1993 Mr. Lynn Kadleck Kadleck & Associates 5336 Alpha Road, Sui Dallas, TX 75240 te5 Fountain Park Addition Construction Plans Dear Mr. Kadleck: I The City of Coppell has comments to offer: P.O. Box 478 Coppell, Texas 75019 214-462-0022 received and reviewed the referenced plans and has the following 1) The open ~pace area shown on the final plat sheet should be labeled as a common area and there should be a note stating that it will be maintained by the Homeowners Association. 2) On the drz4nage area map and detail sheet, make the correction to the drainage area number. 1 3) Provide b~ck pavers for the street return on Fountain View Place as called for in the City of Cqppell Streetscape Plan. Also, provide brick pavers for the wheelchair ramps. 4) Referring within the line be con the 24" cle 5) On the gr following: 6) In the ero~ around the Sheet 5, the proposed 8" sanitary sewer agq:w, ars to cross the storm inlet ninimum 24" clearance. Therefore, it is necessary that the sanitary sewer xete encased. Check all other areas where two utilities may cross within Lrance and concrete encase as required. ~ding plan and note sheet (Sheet //7), add a general note stating the "Shall submit a traffic control plan consistent with the T.M.U.T.C.D". ion and sedimentation control plan sheet (sheet//8), provide a silt fence edge of the entire project. Also, show all the street names. 10) Provide the p attached shee! 7) Make the chmages to the general notes and layout on the water and sanitary sewer plans as indic4ted on the plans. 8) Construction 41ans need to be signed and sealed by a registered professional engineer. 9) The City wou~d prefer to have a storm sewer system on Fountain Drive instead of the no crown section to convey storm water runoff. tan approval paragraph for the City of Coppell on the title sheet (see I. There are various other been addressed, the revi should have any questio~ convenience. Sincerely, ninor comments throughout these plans. Once these comments have ed set of plans should be resubmitted to the City for review. If you ts concerning these comments, please feel free to contact me at your Michael A. Martin, E.I.T. file/mmartin/review.ltr RE: RE: Plane Prel>=l Sheet Specification; Sheet Construction EJ~piration dc PLAN APPROVAL PARAGRAPH For City Engineer 'ed by of Last Revsion date Prepared by of Last Revision date Plans and Specifications Effective date The above identified plane and specifications have been reviewed and found to be in compllanc~with the applicable Engineering provisions of the Municipal Code of the City cfr C~oppell, Texas. Issuance of this approval shall not be oonatrucd as approval of the concept for the consteuction details of the proposed improvements and alkali not in any way release the Owner/Developer and the Design Engineer fro~ liability for the adequacy of the design nor from liability / caused by or eeeultir~g from the construction of improvements ~oae provided for in the above eplcified documents. The ieeuance of thie approval doee not authorize construction, which construction shall not proceed un[il the owner has effected compliance with all other applicable provieione of the Mu~icil~t Code of the City of Coppell, Texas and compliance of oil other ~tete st,~tutee, and regulcrtory requirements applicable to the improvements epeciflKI in the identified documents, including completion of any and all requirerr.ents of ~U~ City of Coppell. Texas requiring any approval of the Planning and Zoning Commission and City Council payment of alt fees, posting of all bonds and then securing on 'Approval to Proceecf' from the City Engineer.' Any changes must be approved by the appropriate regulatory agencies as well as the City Engineer. After the Developer's Design Engineer approves the change, the ~City's allsigned Engineering Inspector shall be constulted who will 'eRher approve qnd/or secure approval from the City Engineer. at which time a supplemental plan approved will be affixed to the approved ptons, and / referenced in a supplemental oppravol letter by the City Engineer. Alt revisions wilt be included in ihs 'As-Built' plans to be submit~red 50 days after substantial comple~ion~10f all p~blic improvements. / CITY ENGINEER DATE