Founders Crossing- CS150130 (4)
Michelle Matunas
From:Michael Garza
Sent:Wednesday, June 29, 2016 11:03 AM
To:Michelle Matunas
Subject:FW: Founder's Crossing
Attachments:Founder's Crossing Lot 3 Block A Preliminary.pdf; Founder's Crossing Lot 2 Block A
Preliminary.pdf; Founder's Crossing Lot 1 Block A Preliminary.pdf
Can you put this email and correspondence in the Founders crossing folder.
Thanks!
From: Kenneth Griffin
Sent: Friday, January 30, 2015 3:54 PM
To: Bennett Ratliff <bennett@ratliffgroup.com>
Cc: Michael Garza <MGarza@coppelltx.gov>; Keith Marvin <KMarvin@coppelltx.gov>
Subject: Founder's Crossing
Bennett
I’ve worked up a preliminary fee assessment for Lot 1 Block A that includes water, sewer and roadway
fees. (Note that construction inspection fees will be calculated on the amount of the cost of the construction
outside the foot print of the building.) I’ve also looked at the general location of the utilities on the site and
tried to estimate what easement area we may need. The actual total easement area should be somewhere
between 500 – 1,000 square feet. We typically offer about half the DCAD valuation of the property for
easements. I’ve also included a very preliminary estimate of fees for the remaining two lots, based on a
building size of 2,700 square feet each.
It probably will be difficult to waive all the fees. However, we could discuss waiving the roadway impact fees
on Lot 1 Block A. The other fees would still be required. Also, all fees on the remaining lots, including the
roadway impact fees, would still be required.
I’m unsure what the real cost of the property was since DCAD values typically lag behind. So, I’m willing to
discuss the real value of the property and discuss waiving other fees if needed.
Let me know your thoughts,
Thanks
Kenneth M. Griffin, P.E.
Director of Engineering and Public Works
City of Coppell, TX
972-304-3680 (office)
kgriffin@coppelltx.gov