Loading...
DCT Fellowship- LR160426 2424 STUTZ DR.  SUITE 400  DALLAS, TX 75235  TEL [214] 350 5600  FAX [214] 350 0019 REPORT OF FIELD DENSITY TESTS DCT Freeport West Bethel Road and Creekview Drive Coppell, Texas REPORTED TO: DCT Industrial Trust 5430 LBJ Freeway, Suite 1030 Dallas, Texas 75240 ATTN: Mr. Joe Williams REPORT NO. 61 REPORT DATE: 04-26-16 REG PROJECT NO. 20922 TECHNICIAN: A. Chavez and J. Hopper PAGE: 1 of 2 CONTRACTOR: FCL Builders Texas Proctor No. ASTM Standard Description Optimum Moisture, % Maximum Density, PCF 2 D-698 Yellowish brown clayey sand 12.4 117.4 6 D-698 Brown sandy clay w/trace gray & red clay 14.0 113.6 9 D-698 Dark brown & brown clay w/limestone 19.0 103.7 Test No. Date Location Depth Below Final S. G. (feet) Field Density (pcf) Field Moisture (%) Proctor ID Compaction Level (%) 327 04-07-16 Water Line 1: STA 6+75 2.0 99.2 22.6 9 95.7 328 Water Line 1: STA 6+75 1.0 101.0 20.9 9 97.4 329 Water Line 1: STA 6+75 0.0 100.4 21.3 9 96.8 330 Water Line 1: STA 8+25 2.0 98.8 23.2 9 95.3 331 Water Line 1: STA 8+25 1.0 100.8 21.4 9 97.2 332 Water Line 1: STA 8+25 0.0 101.3 20.8 9 97.7 333 Water Line 1: STA 9+75 3.0 99.3 22.7 9 95.7 334 Water Line 1: STA 9+75 2.0 101.0 20.5 9 97.4 335 Water Line 1: STA 9+75 1.0 98.7 22.3 9 95.2 336 Water Line 1: STA 9+75 0.0 100.0 21.9 9 96.4 337 Water Line 1: STA 11+25 2.0 109.1 16.2 6 96.0 338 Water Line 1: STA 11+25 1.0 110.0 15.7 6 96.8 339 Water Line 1: STA 11+25 0.0 111.1 16.0 6 97.8 340 Water Line 1: STA 12+75 2.0 108.7 18.7 6 95.7 341 Water Line 1: STA 12+75 1.0 109.9 15.9 6 96.7 342 Water Line 1: STA 12+75 0.0 110.0 16.6 6 96.8 343 Water Line 1: STA 14+50 2.0 109.1 18.2 6 96.0 344 Water Line 1: STA 14+50 1.0 110.8 16.0 6 97.5 345 Water Line 1: STA 14+50 0.0 111.0 15.8 6 97.7 346 Paving: 55’S, 110’E(1) 0.0 102.1 18.8 9 98.4 347 Paving: 125’N, 110’E(1) 0.0 101.5 19.5 9 97.9 348 04-15-16 Water Line 1: STA 7+65 0.0 111.9 15.4 2 95.3 349 Water Line 1: STA 8+20 0.0 112.2 15.3 2 95.6 350 Water Line 1: STA 9+75 0.0 112.5 14.9 2 95.8 REPORT NO. 61 REPORT DATE: 04-26-16 REG PROJECT NO. 20922 PAGE: 2 of 2 Comments: Where tested, materials were in compliance with project specifications. Footnotes: (1) Measurements referenced from SE building corner. E-Mail Distribution: (1) DCT Industrial Trust/ Mr. Joe Williams (1) DCT Industrial Trust/ Mr. Sophia Montemayor (1) FCL Builders Texas/Mr. Drew Hanlon (1) Pross Design Group/Mr. Bobby Pross (1) City of Coppell/Mr. Marcus Marion (1) Pacheco Koch/Mr. Clayton Strolle (1) McHale Engineering/Mr. Matt Skaggs (1) FCL Builders Texas/ Mr. Ethan McIntosh (1) FCL Builders Texas/ Mr. Kevin Roberts Submitted by: REED ENGINEERING GROUP, LTD. Registration Number F-3114 Bill Woolwine Sr. Manager, CMT BW/sp