DCT Fellowship- LR160503
2424 STUTZ DR. SUITE 400 DALLAS, TX 75235 TEL [214] 350 5600 FAX [214] 350 0019
CONCRETE CYLINDER TEST REPORT
DCT Freeport West
Bethel Road and Creekview Drive
Coppell, Texas
REPORTED TO: DCT Industrial Trust
5430 LBJ Freeway, Suite 1030
Dallas, Texas 75240
ATTN: Mr. Joe Williams
REPORT NO. 70
REG PROJECT NO. 20922
SAMPLE DATE: 05-03-16
TECHNICIAN: K. Wicks
PAGE: 1 of 2
CONTRACTOR: FCL Builders Texas
Location of Sample
Set Number Location Quantity Represented (c.y.)
1 Slab leave-out: H.2-5 9.5/123.5
2 Slab leave-out: C.3-1 123.5/123.5
Design Information
Source of Concrete Mix Identification Specified Strength (psi)
LMC 1600 4000
Test Results
Set
No.
Cylinder
ID
Date Tested
Age @
Test
Total Load
(lbs.)
Compressive
Strength (psi)
Average Strength
(psi)
1 7696 05-10-16 7 53100 4220
7696 05-31-16 28
7696 05-31-16 28
7696 05-31-16 28
7696 Hold H
2 7697 05-10-16 7 42110 3350
7697 05-31-16 28
7697 05-31-16 28
7697 05-31-16 28
7697 Hold H
Cylinder Data
Set
No.
Cylinder
ID
Slump
(inches)
Time of
Sample
Air
Temp.
(°F)
Concrete
Temp.
(°F)
Air
Entrainment
(%)
Unit
Weight
(lbs/ft3)
Ticket
Number
1 7696 5.0 8:00 AM 53 63 2.4 142.8 63101144
2 7697 5.0 11:25 AM 84 87 1.2 143.6 62996100
Note: (1) Concrete was sampled in accordance with ASTM C-31
(2) Concrete cylinders were tested in accordance with ASTM C-39
REPORT NO. 70
REG PROJECT NO. 20922
SAMPLE DATE: 05-03-16
PAGE: 2 of 2
E-Mail
Distribution: (1) DCT Industrial Trust/
Mr. Joe Williams
(1) DCT Industrial Trust/
Mr. Sophia Montemayor
(1) FCL Builders Texas/Mr. Drew Hanlon
(1) Pross Design Group/Mr. Bobby Pross
(1) City of Coppell/Mr. Marcus Marion
(1) Pacheco Koch/Mr. Clayton Strolle
(1) McHale Engineering/Mr. Matt Skaggs
(1) FCL Builders Texas/
Mr. Ethan McIntosh
(1) FCL Builders Texas/
Mr. Kevin Roberts
(1) DCT Industrial/Ms. Lisa Gajewski
Submitted by:
REED ENGINEERING GROUP, LTD.
Registration Number F-3114
Cary Tipps
Project Manager, CMT
CT/cn