Loading...
DCT Fellowship- LR160503 2424 STUTZ DR.  SUITE 400  DALLAS, TX 75235  TEL [214] 350 5600  FAX [214] 350 0019 CONCRETE CYLINDER TEST REPORT DCT Freeport West Bethel Road and Creekview Drive Coppell, Texas REPORTED TO: DCT Industrial Trust 5430 LBJ Freeway, Suite 1030 Dallas, Texas 75240 ATTN: Mr. Joe Williams REPORT NO. 70 REG PROJECT NO. 20922 SAMPLE DATE: 05-03-16 TECHNICIAN: K. Wicks PAGE: 1 of 2 CONTRACTOR: FCL Builders Texas Location of Sample Set Number Location Quantity Represented (c.y.) 1 Slab leave-out: H.2-5 9.5/123.5 2 Slab leave-out: C.3-1 123.5/123.5 Design Information Source of Concrete Mix Identification Specified Strength (psi) LMC 1600 4000 Test Results Set No. Cylinder ID Date Tested Age @ Test Total Load (lbs.) Compressive Strength (psi) Average Strength (psi) 1 7696 05-10-16 7 53100 4220 7696 05-31-16 28 7696 05-31-16 28 7696 05-31-16 28 7696 Hold H 2 7697 05-10-16 7 42110 3350 7697 05-31-16 28 7697 05-31-16 28 7697 05-31-16 28 7697 Hold H Cylinder Data Set No. Cylinder ID Slump (inches) Time of Sample Air Temp. (°F) Concrete Temp. (°F) Air Entrainment (%) Unit Weight (lbs/ft3) Ticket Number 1 7696 5.0 8:00 AM 53 63 2.4 142.8 63101144 2 7697 5.0 11:25 AM 84 87 1.2 143.6 62996100 Note: (1) Concrete was sampled in accordance with ASTM C-31 (2) Concrete cylinders were tested in accordance with ASTM C-39 REPORT NO. 70 REG PROJECT NO. 20922 SAMPLE DATE: 05-03-16 PAGE: 2 of 2 E-Mail Distribution: (1) DCT Industrial Trust/ Mr. Joe Williams (1) DCT Industrial Trust/ Mr. Sophia Montemayor (1) FCL Builders Texas/Mr. Drew Hanlon (1) Pross Design Group/Mr. Bobby Pross (1) City of Coppell/Mr. Marcus Marion (1) Pacheco Koch/Mr. Clayton Strolle (1) McHale Engineering/Mr. Matt Skaggs (1) FCL Builders Texas/ Mr. Ethan McIntosh (1) FCL Builders Texas/ Mr. Kevin Roberts (1) DCT Industrial/Ms. Lisa Gajewski Submitted by: REED ENGINEERING GROUP, LTD. Registration Number F-3114 Cary Tipps Project Manager, CMT CT/cn