Loading...
DCT Fellowship- LR160412 2424 STUTZ DR.  SUITE 400  DALLAS, TX 75235  TEL [214] 350 5600  FAX [214] 350 0019 REPORT OF FIELD DENSITY TESTS DCT Freeport West Bethel Road and Creekview Drive Coppell, Texas REPORTED TO: DCT Industrial Trust 5430 LBJ Freeway, Suite 1030 Dallas, Texas 75240 ATTN: Mr. Joe Williams REPORT NO. 57 REPORT DATE: 04-12-16 REG PROJECT NO. 20922 TECHNICIAN: A. Chavez PAGE: 1 of 2 CONTRACTOR: FCL Builders Texas Proctor No. ASTM Standard Description Optimum Moisture, % Maximum Density, PCF 4 D-698 Yellowish brown sandy clay 16.6 109.7 5 D-698 Dark brown & reddish brown clay 17.4 106.3 Test No. Date Location Depth Below Final S. G. (feet) Field Density (pcf) Field Moisture (%) Proctor ID Compaction Level (%) 294 03-29-16 Storm Line 3: STA 0+50 6.0 101.4 18.9 5 95.4 295 Storm Line 3: STA 0+50 5.0 103.8 19.2 5 97.6 296 Storm Line 3: STA 0+50 4.0 102.1 217 5 96.0 297 Storm Line 3: STA 0+50 3.0 104.1 18.5 5 97.9 298 Storm Line 3: STA 0+50 2.0 102.0 20.0 5 95.9 299 Storm Line 3: STA 0+50 1.0 103.9 18.0 5 97.7 300 Storm Line 3: STA 0+50 0.0 104.2 18.5 5 98.0 301 Storm Line 1: STA 6+00 8.0 103.3 19.2 5 97.2 302 Storm Line 1: STA 6+00 7.0 101.9 21.3 5 95.9 303 Storm Line 1: STA 6+00 6.0 104.0 18.8 5 97.8 304 Storm Line 1: STA 6+00 5.0 101.6 20.9 5 95.6 305 Storm Line 1: STA 6+00 4.0 103.0 19.0 5 96.9 306 Storm Line 1: STA 6+00 3.0 104.0 18.8 5 97.8 307 Storm Line 1: STA 6+00 2.0 103.6 19.3 5 97.5 308 Storm Line 1: STA 6+00 1.0 104.2 20.0 5 98.0 309 Storm Line 1: STA 7+50 7.0 102.6 21.0 5 96.5 310 Storm Line 1: STA 7+50 6.0 103.3 19.9 5 97.2 311 Storm Line 1: STA 7+50 5.0 102.3 19.8 5 96.2 312 Storm Line 1: STA 7+50 4.0 104.1 18.8 5 97.9 313 Storm Line 1: STA 7+50 3.0 102.2 21.3 5 96.1 314 Storm Line 1: STA 7+50 2.0 104.2 19.0 5 98.0 315 Storm Line 1: STA 7+50 1.0 102.9 20.8 5 96.8 316 Storm Line 1: STA 7+50 0.0 104.0 18.5 5 97.8 317 Storm Line 1: STA 9+75 4.0 105.1 20.3 4 95.8 318 Storm Line 1: STA 9+75 3.0 104.8 21.0 4 95.5 REPORT NO. 57 REPORT DATE: 04-12-16 REG PROJECT NO. 20922 PAGE: 2 of 2 Test No. Date Location Depth Below Final S. G. (feet) Field Density (pcf) Field Moisture (%) Proctor ID Compaction Level (%) 319 03-29-16 Storm Line 1: STA 9+75 2.0 106.1 18.0 4 96.7 320 Storm Line 1: STA 9+75 1.0 105.5 20.3 4 96.2 321 Storm Line 1: STA 9+75 0.0 107.3 17.8 4 97.8 322 Storm Line 1: STA 11+25 2.0 104.8 20.0 4 95.5 323 Storm Line 1: STA 11+25 1.0 106.6 18.8 4 97.2 324 Storm Line 1: STA 11+25 0.0 107.1 17.9 4 97.6 325 Storm Line 1: STA 12+75 1.0 105.9 18.7 4 96.5 326 Storm Line 1: STA 12+75 0.0 107.1 19.0 4 97.6 Comments: Where tested, materials were in compliance with project specifications. E-Mail Distribution: (1) DCT Industrial Trust/ Mr. Joe Williams (1) DCT Industrial Trust/ Mr. Sophia Montemayor (1) FCL Builders Texas/Mr. Drew Hanlon (1) Pross Design Group/Mr. Bobby Pross (1) City of Coppell/Mr. Marcus Marion (1) Pacheco Koch/Mr. Clayton Strolle (1) McHale Engineering/Mr. Matt Skaggs (1) FCL Builders Texas/ Mr. Ethan McIntosh Submitted by: REED ENGINEERING GROUP, LTD. Registration Number F-3114 Bill Woolwine Sr. Manager, CMT BW/sp