Fellowship-CS 990111 Coppell, Texas 75019
/~"-'-~/~ The City With A Beautiful Future 972-462-0022
k,,i...~/ //__._~/ P.O. BOX478
(~7~////~ COPPELL TEXAS 75019 FILE
January 11, 1999
Jeff Williams,P.E.
Graham Associates, Inc.
616 Six Flags Drive
Arlington, TX 76011
RE: Fellowship of Las Colinas Addition, Lot 2, Block
Development Fee Assessment
Dear Mr. Williams:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of $13,840.28 and forward to the
Finance Department along with a copy of the Fee Assessment table. This amount is a portion
of the assessed fees which need to be paid prior to Council approval. Please refer to attached
table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help us to verify the
payment of required fees and insure a successful beginning of this project. We look forward
to worldng with you on this project. If you have any questions, please contact me.
S' cerel ,
Michael A. Martin, P.E.
Assistant City Engineer
cc: Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Gary Sims, Director of Leisure Services
DEVELOPMENT FEE TABLE
Project: Fellowship of Las Colinas Addition, Lot 2, Block 1
Date: 1/11/99
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $3,600.00 $3,600.00
(100 % due prior to Council Approval)
Water Tap Inspection Fee $50.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $0.00
(100% due at Issuance of Water Meter)
Water Meter Fee (IrrigatiordFireline) $192.15
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $0.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $0.00 $0.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 N/A
(100% due prior to Council Approval)
Roadway Impact Fee $10,240.28 $10,240.28
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $14,112.43
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $13,840.28
DEVELOPMENT FEE WORKSHEET
PROJECT: Fellowship of Las Colinas Addition, Lot 2, Block 1
DATE: 1/11/99
Water Impact Fee:
Domestic Meter(s): = ESU's
Irrigation Meter(s): 1 - 2 inch = 8 ESU's
= ESU's
Fireline Meter(s): = ESU's
Total #: 8 ESU's @ $450.00 ea. $3,600.00
(100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea. $50.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 0 Domestic Meter(s) @ $0.00 $0.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $192.15 $192.15
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 0 Fireline Meter(s) @ $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 0 Meter(s) @ $35.00 ea. $0.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea. $30.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 0 @ $450.00 ea. $0.00
Wastewater Tap Inspection Fee:
Total #: 0 Connections @ $50.00 ea. $0.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 0 Lots @ $50.00 ea. $0.00
(100% due prior to issuance of building permit)
Page 3
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A Single-family @ $150.00 / Lot N/A
N/A Multi-family @ $75.00 / Unit N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A Single-family @ $350.00 / Lot N/A
N/A Multi-family @ $350.00 / Unit N/A
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
N/A Single-family @ $1285.00 / Lot N/A
N/A Multi-family @ $1285.00 / Unit N/A
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations) $10,240.28
Street Lighting Fees: Information not
Assessed for lighting in the City's right-of-way, available at this time
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees: Information not
Assessed for signage in the City's right-of-way, available at [his time
(See attached fee calculations if applicable)
Construction Inspection Fees: Need submittal of
A copy of the development contract must be submitted for assessment, development contracts
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 4
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Fellowship of Las Colinas Addition, Lot 2, Block 1
DATE: 1/11/99
ROADWAY IMPACT FEE:
Service Area * 4
Category ** Institutional
Land Use ** Church/Synagogue
Building Size (Sq. Ft.) 156,700
Development Units ** 156.7
Vehicle Miles per Development Unit ** 0.52
Fee per Vehicle Mile *** $300
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $24,445.20
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)
Total Building Square Footage = 156,700
Total parking spaces = 2380
Total parking spaces in Coppell = 997
Since only 997 parking spaces out of the total $24,445.20(997/2380)= $10,240.28
2380 parking spaces are located in Coppell a
percentage of the Roadway Impact Fee will be
calculated.
:::::::::::~ "::"-"'.:' ....:... : '-'.:' ..... :::::::::::::::::::::::::::::::::::: ...... .::...:.....:::.....;::