Loading...
Fellowship-CS 990111 Coppell, Texas 75019 /~"-'-~/~ The City With A Beautiful Future 972-462-0022 k,,i...~/ //__._~/ P.O. BOX478 (~7~////~ COPPELL TEXAS 75019 FILE January 11, 1999 Jeff Williams,P.E. Graham Associates, Inc. 616 Six Flags Drive Arlington, TX 76011 RE: Fellowship of Las Colinas Addition, Lot 2, Block Development Fee Assessment Dear Mr. Williams: Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the Development Fee calculations for the referenced development. Please make payment to the City of Coppell in the amount of $13,840.28 and forward to the Finance Department along with a copy of the Fee Assessment table. This amount is a portion of the assessed fees which need to be paid prior to Council approval. Please refer to attached table for additional fees. Also provide a copy of the Engineer's estimate or contract to our office so the construction inspection fee can be verified. Providing a copy of your paid receipt to the Engineering Department will help us to verify the payment of required fees and insure a successful beginning of this project. We look forward to worldng with you on this project. If you have any questions, please contact me. S' cerel , Michael A. Martin, P.E. Assistant City Engineer cc: Jennifer Armstrong, Finance Director Doug Stevens, Engineering Technician Glenn Hollowell, Assistant Director of Public Works Greg Jones, Chief Building Official Gary Sims, Director of Leisure Services DEVELOPMENT FEE TABLE Project: Fellowship of Las Colinas Addition, Lot 2, Block 1 Date: 1/11/99 TOTAL AMOUNT DUE FEES DUE PRIOR TO COUNCIL APPROVAL Water Impact Fee $3,600.00 $3,600.00 (100 % due prior to Council Approval) Water Tap Inspection Fee $50.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic) $0.00 (100% due at Issuance of Water Meter) Water Meter Fee (IrrigatiordFireline) $192.15 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic) $0.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $0.00 $0.00 (100% due prior to Council Approval) Wastewater Tap Inspection Fee $0.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $0.00 (100% due at Issuance of Building Permit) Park Fee $0.00 N/A (100% due prior to Council Approval) Roadway Impact Fee $10,240.28 $10,240.28 (100% due prior to Council Approval) Street Light Fee Information not (100% due prior to Acceptance of Project available at this time Street Sign Fee Information not (100% due prior to Acceptance of Project available at this time Construction Inspection Fee Need submittal of development contracts TOTAL $14,112.43 TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $13,840.28 DEVELOPMENT FEE WORKSHEET PROJECT: Fellowship of Las Colinas Addition, Lot 2, Block 1 DATE: 1/11/99 Water Impact Fee: Domestic Meter(s): = ESU's Irrigation Meter(s): 1 - 2 inch = 8 ESU's = ESU's Fireline Meter(s): = ESU's Total #: 8 ESU's @ $450.00 ea. $3,600.00 (100% due prior to Council approval of the final plat) Water Tap Inspection Fee: Total #: 1 Connections @ $50.00 ea. $50.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Domestic Water Meter Fee: Total #: 0 Domestic Meter(s) @ $0.00 $0.00 (Single family due prior to issuance of building permit) (All other developments due prior to issuance of meter) Irrigation/Fireline Water Meter Fee: Total #: 1 Irrigation Meter(s) @ $192.15 $192.15 Total #: 0 Additional Irrigation Meter(s) @ $0.00 Total #: 0 Fireline Meter(s) @ $0.00 (100% due prior to issuance of water meters) Domestic Water Meter Deposit Fee: Total #: 0 Meter(s) @ $35.00 ea. $0.00 (100% due prior to issuance of water meters) Irrigation/Fire Meter Deposit Fee: Total #: 1 Meter(s) @ $30.00 ea. $30.00 (100% due prior to issuance of water meters) Wastewater Impact Fee: Total Domestic Meters ESU's: 0 @ $450.00 ea. $0.00 Wastewater Tap Inspection Fee: Total #: 0 Connections @ $50.00 ea. $0.00 (100% due prior to issuance of building permit) Utility Final Inspection Fee (All developments): Total #: 0 Lots @ $50.00 ea. $0.00 (100% due prior to issuance of building permit) Page 3 DEVELOPMENT FEE WORKSHEET Park Fee (For Residential Developments Only): * Preliminary plat approved prior to June 23, 1992: N/A Single-family @ $150.00 / Lot N/A N/A Multi-family @ $75.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after June 23, 1992: N/A Single-family @ $350.00 / Lot N/A N/A Multi-family @ $350.00 / Unit N/A (50% paid prior to Council approval of final plat) (50% paid at issuance of building permit) * Preliminary plat approved after October 26, 1993: N/A Single-family @ $1285.00 / Lot N/A N/A Multi-family @ $1285.00 / Unit N/A (100% paid prior to Council approval of final plat) Roadway Impact Fee: (See attached fee calculations) $10,240.28 Street Lighting Fees: Information not Assessed for lighting in the City's right-of-way, available at this time This fee cannot be assessed until after T.U. Electric submits the lighting plan for the proposed development. Once the plans are submitted, $292.60 per light will be assessed. (100% due prior to final acceptance of development) Street Sign Fees: Information not Assessed for signage in the City's right-of-way, available at [his time (See attached fee calculations if applicable) Construction Inspection Fees: Need submittal of A copy of the development contract must be submitted for assessment, development contracts The contracts should indicate the cost to construct the improvements that are inspected by the Engineering Department. (2% of development cost required for private improvements) (4% of development cost required for public improvements) Page 4 ROADWAY IMPACT FEE CALCULATIONS PROJECT: Fellowship of Las Colinas Addition, Lot 2, Block 1 DATE: 1/11/99 ROADWAY IMPACT FEE: Service Area * 4 Category ** Institutional Land Use ** Church/Synagogue Building Size (Sq. Ft.) 156,700 Development Units ** 156.7 Vehicle Miles per Development Unit ** 0.52 Fee per Vehicle Mile *** $300 Roadway Impact Fee due = (Development Units) x (Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) = $24,445.20 * (Figure 2 - Roadway Impact Fee Study) ** (Table 3 - Roadway Impact Fee Study) *** (Schedule 2, Page 3 - Roadway Impact Fee Study) Total Building Square Footage = 156,700 Total parking spaces = 2380 Total parking spaces in Coppell = 997 Since only 997 parking spaces out of the total $24,445.20(997/2380)= $10,240.28 2380 parking spaces are located in Coppell a percentage of the Roadway Impact Fee will be calculated. :::::::::::~ "::"-"'.:' ....:... : '-'.:' ..... :::::::::::::::::::::::::::::::::::: ...... .::...:.....:::.....;::