Loading...
DCT Fellowship- LR160608 2424 STUTZ DR.  SUITE 400  DALLAS, TX 75235  TEL [214] 350 5600  FAX [214] 350 0019 CONCRETE CYLINDER TEST REPORT DCT Freeport West Bethel Road and Creekview Drive Coppell, Texas REPORTED TO: DCT Industrial Trust 5430 LBJ Freeway, Suite 1030 Dallas, Texas 75240 ATTN: Mr. Joe Williams REPORT NO. 80 REG PROJECT NO. 20922 SAMPLE DATE: 06-08-16 TECHNICIAN: T. Caldwell PAGE: 1 of 2 CONTRACTOR: FCL Builders Texas Location of Sample Set Number Location Quantity Represented (c.y.) 1 Paving: 15’S, 10’W from SW building corner 66.5/703 2 Paving: 30’S, 60’E from SW building corner 161.5/703 3 Paving: 20’S, 90’E from SW building corner 256.5/703 4 Paving: 25’S, 10’E from SE building corner 313/703 5 Paving: 45’N, 15’W from NW building corner 427.5/703 6 Paving: 80’N, 30’W from NW building corner 532/703 7 Paving: 10’N, 40’W from NW building corner 617/703 Design Information Source of Concrete Mix Identification Specified Strength (psi) LMC 5233 3500 Test Results Set No. Cylinder ID Date Tested Age @ Test Total Load (lbs.) Compressive Strength (psi) Average Strength (psi) 1 9156 06-15-16 7 36990 2940 9156 07-06-16 28 9156 07-06-16 28 9156 07-06-16 28 9156 Hold H 2 9157 06-15-16 7 40400 3210 9157 07-06-16 28 9157 07-06-16 28 9157 07-06-16 28 9157 Hold H 3 9158 06-15-16 7 32900 2620 9158 07-06-16 28 9158 07-06-16 28 9158 07-06-16 28 9158 Hold H REPORT NO. 80 REG PROJECT NO. 20922 SAMPLE DATE: 06-08-16 PAGE: 2 of 2 Test Results Set No. Cylinder ID Date Tested Age @ Test Total Load (lbs.) Compressive Strength (psi) Average Strength (psi) 4 9159 06-15-16 7 31340 2490 9159 07-06-16 28 9159 07-06-16 28 9159 07-06-16 28 9159 Hold H 5 9160 06-15-16 7 41310 3290 9160 07-06-16 28 9160 07-06-16 28 9160 07-06-16 28 9160 Hold H 6 9161 06-15-16 7 41660 3310 9161 07-06-16 28 9161 07-06-16 28 9161 07-06-16 28 9161 Hold H 7 9162 06-15-16 7 32230 2560 9162 07-06-16 28 9162 07-06-16 28 9162 07-06-16 28 9162 Hold H Cylinder Data Set No. Cylinder ID Slump (inches) Time of Sample Air Temp. (°F) Concrete Temp. (°F) Air Entrainment (%) Unit Weight (lbs/ft3) Ticket Number 1 9156 4.25 3:00 AM 75 85 4.4 147.4 64408141 2 9157 5.0 3:40 AM 75 85 5.0 148.2 63102341 3 9158 4.5 4:45 AM 77 87 4.6 147.2 62997646 4 9159 5.25 5:40 AM 77 88 4.3 146.5 64408161 5 9160 4.25 7:15 AM 78 88 5.0 147.1 64408178 6 9161 4.75 9:15 AM 78 88 3.9 146.9 64408195 7 9162 5.5 10:45 AM 79 90 6.0 147.0 64408205 Note: (1) Concrete was sampled in accordance with ASTM C-31 (2) Concrete cylinders were tested in accordance with ASTM C-39 E-Mail Distribution: (1) DCT Industrial Trust/Mr. Joe Williams (1) DCT Industrial Trust/ Mr. Sophia Montemayor (1) FCL Builders Texas/Mr. Drew Hanlon (1) Pross Design Group/Mr. Bobby Pross (1) City of Coppell/Mr. Marcus Marion (1) Pacheco Koch/Mr. Clayton Strolle (1) McHale Engineering/Mr. Matt Skaggs (1) FCL Builders Texas/Mr. Kevin Roberts (1) DCT Industrial/Ms. Lisa Gajewski Submitted by: REED ENGINEERING GROUP, LTD. Registration Number F-3114 Cary Tipps Project Manager, CMT CT/cn