Prologis Park- CS160712T H E C 1 T Y O F
COPPELL
ti 0
July 12, 2016
Robert Gossett, P.E.
Halff Associtates
1201 North Bowser Road
Richardson, TX 75081
RE: Prologis Park One Twenty One
Northwest Drive — South of Freeport
Dear Mr. Gossett,
The City of Coppell has reviewed the referenced plans and has the following comments to offer:
General Notes -
1. All paving shall use #4 bars.
PavinIZ Plan and Profile -
2. Provide contact information at TxDOT regarding inlet in roadway intersection. This is not
allowed in Coppell.
3. Size of elevation text in profile is small.
4. Curb ramps need to be designed to cross both Northwest Drive and Freeport Parkway.
5. Label all PCRs, PCIS in both plan and profile
Pavinlz Section -
6. Sidewalks are typically constructed 1' off easement/ROW.
Sianat!e and Striping -
7. Provide sufficient distance from stop bar and crosswalk. (do not marls crosswalk)
8. Provide street name blades
Grading Plan -
9. There is a difference in the layers between the two sheets, make them match.
Storm Drain Profiles -
10. The City of Coppell does not allow grate inlets within street intersections.
Water & Wastewater plan -
11. Adjust the fire hydrant length for Station 0+84.8 (probably due to curve change)
A FAMILY COMMUNITY FOR A LIFETIME
255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV
4
Wastewater profiles
12. Provide 5' dia manholes where line is 12' or greater depth.
Erosion Control Plan -
13. Keep all silt onsite (no discharge to Freeport or off property.
14. No ponding water
15. Revegetate ASAP
The City of Coppell has reviewed the plans for the referenced addition which will be approved
with the comments above addressed.
The City of Coppell requires three sets of final construction plans for its use; your office should
submit as many additional sets for stamping as is necessary for construction operations. All
contractors and subcontractors onsite must have a copy of the plans approved by the City of
Coppell along with a copy of the City's standard construction details. We will also require a Pdf.
version of the plans along with the DWG. files.
All fees must be paid prior to release of this project for construction. The City charges a 2%
inspection fee for all private construction outside the building's footprint. This includes dirt work,
paving, storm drains, water lines, sewer lines, drainage pipes, etc. that are private. For all
installations in the public right-of-way or easement, the City charges a 4% fee. A check for
inspection fees made to the City of Coppell should be submitted to this office along with the
Construction Development Permit Application and a copy of the Construction Site Notice. For
your convenience a spreadsheet is attached to the permit application for use in calculating the
inspection fees. A copy of the contract(s) should be attached for verification purposes.
If you have any questions, please contact me at your convenience.
Sincerely,
George S. Marshall, E.
Engineering Manger
Office Phone: (972) 304-3562
mg arshall@coppelltx.gov