Frontier-PT160719A cqWaf the aFVrvteed permit rn.et be cz-%thejab site at all tirvws.
CC: Applicant
T H` ` T� r ° r Page 1 of 4
Public Works
COFFELL
Permit File
Rev. 06/2012
Orig. to Project File
RIGHT-OF-WAY USE PERMT APPLICATION
Permit valid for 90 calendar days from date of approval
Submit permit application to the Engineering Dept., Town Center, 255 Parkway Blvd. or e-mail to engineer@coppelltx.gov (see button below)
Date of Submittal: 07/19/2016 Applicant's Job # / Work Order # S Denton Tap/ W Beta
PERMIT FEE: $100.00
(No charge to Utility Companies with approved Franchise/ROW Use Agreement)
Refer to the City of Coppell Ordinance No. 2001-944. Certificated Telecom Provider? Yes (-- No C
Plans provided and approved (Erosion Control/Safety fences must be installed prior to beginning work)
Project Name/Location or address intersection of S Denton Tap and W Bethel Rd
General Contractor Henkel s and McCoy Contact # 214-507-1722
E-mail address to return permit william.jezewski@ftr.com
Representative: Gregory Mick
Franchise Telephone#: 972-318-5277
Company:
E-mailaddress• gregory.n.mick@ftr.com
(for contact if needed/if e-mail of approved permit is desired/permit cannot be e-mailed unless complete)
Utility Company Represented:
C Oncor Electric Delivery C Atmos Energy C Verizon C SBC/ AT&T
C Time Warner Cable C CoSery Electric/Gas (e Other Frontier Com. (formerly verizon)
General Description of Work (in accordance with Ord. No. 2001-944): PLEASE ATTACH PLAN OF PROPOSED WORK
mergency Repair. 600 pair underground cable was damaged by Aqua Bore and needs to be dug and and repaired. pavement
:)f left -turn lane of south -bound Denton Tap Rd in intersection needs to be removed to get to damage. Affected lanes of
Denton Tap and W Bethel Rd will need to be closed.
Estimated Start Date 07/19/2016 Estimated Completion Date* 07/29/2016
* Completion requires submittal of Completion Verification Notice (see page 4)
);,Was contact made with City and/or utility companies to locate existing utilities?
if NO, Reason. just notified of emergency repair needed C Yes (: No
➢Is removal of existing streets, alleys, or sidewalks necessary? (e- Yes C No
if YES, project must have City inspection prior to concrete replacement
Right-of-Wav Use Permit Aoolication Page 2 of 4
Representative(s) of the Contractor must adhere to all construction standards approved by the City of Coppell, which
includes but is not limited to. Erosion Control Ordinance, compaction requirements (density tests may be required at
applicant's expense) and barricading according to the Texas Manual on Uniform Traffic Control Devices.
Area(s) affected must be restored to as good condition as before the commencement of work (grading, drainage,
vegetation, and erosion control). To schedule Public Works final inspection (Page 4) call 972-462-5155.
);;Any excavation requiring closing of a street/alley must be reported prior to closing to the following:
Police Department CM 972-304-3600
Fire Department @ 972-304-3512
Street Department @ 972-462-5150
Engineering Department @ 972-304-3679
➢Attach barricade plan / trench safety plan if a lane or street closure is required.
NOTE. Street closures are allowed from 9:00 a.m. until3:30 p.m. ONLYunless otherwise approved byCity
Engineer.
➢Attach Work Order (franchise only) and/or 1 set of prints showing proposed work.
Locates for existing franchise utilities must be done 48 hours prior to beginning work.
For City utility locates, call 972-462-5155 to schedule 48 hours prior to beginning work.
The application with signatures of Franchise and Contractor representatives must be submitted to Engineering
Dept. for approval prior to beginning work. Submittals by e-mail should go to engineer@coppelltx.gov.
Printing your name indicates your acceptance of the terms and conditions of this form:
(if you want the approved permit returned via e-mail, provide a valid e-mail address on Page 1.)
Gregory Mick 07/19/2016
Signature of Utility Company Representative Date
Steve Forsythe
Signature of Contractor Representative
ignature of epresentati
Comments
07-19-2016
Date
7-/4-16
Date
);,NOTE.- Notify City /nspector at 972-304-3679 prior to be innin`p work and prior to
backfill for concrete, trench, ditch and open pit inspections. Backfill must meet
all construction standards approved by the City of Coppell.
Applicant shall indemnify and forever hold harmless against the City of Coppell each and every claim, demand
or cause of action that may be made or come against it by reason of or if any way arising out of the closure,
blocking, excavating, cutting, tunneling, or other work by the applicant under permit from the City, if such
permit is granted.
T M [ - C 1 T Y , O F
COFFELL
UTILITY RELOCATION CHECKLIST FOR WORK WITHIN
CITY OF COPPELL RIGHTS-OF-WAY OR EASEMENTS
Listed below are minimum requirements for utility relocation projects:
Page 3 of 4
1.A copy of the valid approved City of Coppell permit is required on the project at all times.
2.Notify adjacent property owners (commercial & residential) of project timeline; provide them with contact
names and phone numbers.
3.Proper erosion control measures must be taken.
4.Follow Texas MUTCD standards for work in traffic zones.
5.Sod is to be replaced when necessary.
6.Irrigation repairs must be performed in a timely manner.
7.Follow OSHA recommended trench safety at all times.
8.Repair existing utilities that are damaged, including but not limited to clean -outs, water valves, and SS
manholes.
9.Densities may be required in trench lines (ASTM).
10.Care and repair of street signage is the responsibility of the contractor.
11.No work is to be done in collector roadways before 9:00 a.m. or after 3:00 p.m.
12.Prior notice of work activity on weekends and holidays must be in writing.
13.Line locates must be performed in advance by contacting - 1800DIG TESSand/or the following:
CITY OF COPPELL UTILITIES DIVISION coppelltx,gov/utility-operations-division
972/ 462-5155
CITY OF COPPELL ENGINEERING DEPT.
972/ 304-3679
HOMEOWNER ASSOCIATIONS
972/ 304-3678 (Planning Department)
TIME WARNER CABLE
214/ 320-5455 (Mike Rasmussen)
AT&T LOCAL NETWORK
214/ 215-3031 (Rich Millenman)
COSERV Gas & Electric
940/ 321-7800 x 7624 (Greg Ward)
EXPLORER PIPELINE
918/ 493-5100 (Patrick Nwakoby)
ONCOR Electric Delivery
972/ 323-8917 (Larry Redick)
VERIZON COMMUNICATIONS
972/ 318-5277
FEDERAL EMERGENCY MGMT. ADMIN.
940/ 898-5138
TEXAS COMM. on ENVIRONMENTAL QUALITY
817/ 588-5800
DENTON CO. LEVEE DISTRICT
214/ 352-5118 (Richard Hightower)
Atmos Energy
972/360-4428 (Gary Dickinson)
1800 DIG TESS for line locates
(344 - 8377)
14.Contaminants must be removed from work area daily and disposed of properly outside the City.
15.Streets, sidewalks and alleys must be kept clean of construction material and debris.
16."Clean-up" requires returning work area to pre -project condition or better.
17.Contractor is required to contact Public Works Division for Completion Verification Notice. (see pg. 4)
T M i - C 1 T Y O F
COFFELL
# A 41 1!
UTILITY RELOCATION IN RIGHT-OF-WAY OR EASEMENT
COMPLETION VERIFICATION NOTICE
Page 4 of 4
Contact City of Coppell Public Works Division at 972-462-5155 to schedule an inspection
with Utility & Streets personnel to verify that your project has been completed to City of
Coppell specifications. Failure to schedule verification inspection may delay future projects.
Franchise Utility Name
Project Location / Applicant's Work Order # (if applicable)
Sub -contractor Company Name
24 hr.Contact Number
Date of Verification Appointment
Time of Verification Appointment
INFORMATION BELOW TO BE COMPLETED BY CITY OF COPPELL PUBLIC WORKS PERSONNEL
❖ Inspected by
of Utilities Maintenance Division on
and found to be acceptable /not acceptable because
Follow --up needed? (Yes (, No Follow-up scheduled for
❖ Inspected by of Streets Maintenance Division on
and found to be acceptable /not acceptable because
Follow-up needed? (Yes (-No Follow-up scheduled for
A copy of this completed notice can be provided to the address below
or e-mailed by using the button below:
City of Coppell Engineering Dept.
255 Parkway Blvd., Coppell TX 75019
Off ice: 972-304-3679 Fax: 972-304-3570
Submit by E-mail Print Form
IH CIE.' -1 L101Ua(] S
■
C
O 0
o-0
A
Z 3
N
3
A-
fD
N
T
I
O
D
(D
n
sv
(D
Q
Qj
3
w
Uq
(D
!Z
C
N
O
1
(D
N
Q
Chateaus Dr
w nni O' -n
rr o
W n
o
fD
CL rD 3
rt r+ C
O Cu
O- �.
fD
n a O
O
d((DD N.
a) a
to C1 .fl
��
rD �.
rt r+ 7
(D O Qq
Q Oq N
a) =3
6 O rD
N n
(D d4
Ln O
L
O
C O
7
a
rn 3
ao rr
0 0
C
zi
a
�
vo
o
00 � ni
M rD
m
�
v
N
Cr
3 :13
Q a.
(D
1
1
::3
7
PH dP I U JILIOU
m n-7
CD oD
eb ro
r7
rD rD
Q Q_
Ui
O i
(
O �
° �C
�l
(
(
i
close No
i
i
pa del uo;uao S 00
i o
-t
o �_
?� n
o Q
m
M,
a
ISH de -I I
A
N
N
O
0_
O
Vi
CU rD
7 ;:p
(D r+
n C
O j
0-
z ��
N
N
O
7
O
7
�.4,
a
S
J�
(o
C�
O i
(
O �
° �C
�l
(
(
i
close No
i
i
pa del uo;uao S 00
i o
-t
o �_
?� n
o Q
m
M,
a
ISH de -I I
A
N
N
O
0_
O
Vi
CU rD
7 ;:p
(D r+
n C
O j
0-
z ��
F