Creekview Ph2-CS160726T H E C 1 T Y O F
COFFELL
F o
X A S 1 8 9
July 26, 2016
Lynn Kadleck
Kadleck & Associates
2740 N. Dallas Parkway STE 280
Plano, TX 75093
RE: Creekview Phase 2 - Lot 2R Block A
Fee Assessment Letter
Dear Mr. Kadleck
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the
Development Fee calculations for the referenced development.
Please make payment for the Impact. Fees to the City of Coppell in the amount of $1,921.00 and forward
to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of
the assessed fees that need to be paid prior to filing of the final plat. Please note that the Water and Sewer
Impact Fees are due and payable at the issuance of a Building Permit.
The additional fees for water and. -sewer taps, water meters, and utility inspection fees need to be paid by
separate check at the Building Inspections Department, 265 E. Parkway Blvd. Meters will be ordered
when those fees are paid. Fees identified are estimates at this time.
Appropriate payment of the required fees will help insure a successful beginning of this project. We look
forward to working with you on this project. If you have any questions, please contact me.
Sincerely,
George . Marshall, P.E.
Engineering Manager
cc: Jennifer Miller, Finance Director
Rachel Evans, Administrative Technician, Building Inspections
Michael Garza, Assistant Director of Public Works
Tim Oates, Deputy Chief/Prevention
Brad Reid, Director of Parks and Recreation
Ann Hennum & Timothy Pletta (via email)
A FAMILY COMMUNITY FOR A LIFETIME
255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV
Step 1 Click on the icon to the right if you need a fee asessment letter
Step 2 Click on the icon to the right to clear any existing data from the tables
WATER IMPACT, WASTEWATER IMPACT AND PARK FEE DATA TABLE
and Wastewater Data
Project Name (Name on Plat) CreekviewPhase 2 -Lot 2RBlock A
Toda s Date 6/6/2016
Step 1 Enter the Number of Domestic Meters 1
Step 2 Select the Size of Domestic Meters - 5/8 inch X 3/4 inch
Step 3 Enter the Number of Irrigation Meters 0
SLep 4 Select the Size of Irri ation Meters - 5/8 inch X 3/4 inch
Ste ` 5 EntertteNurriber of Additidi3all€ri atiori Metersofa DiffisreitSize
ele the -::Size: cfdit::::::: �:: t.::::::::
... ...... .
tep S....ct ..of A conal rr�.ga ton. M. to s
..............................
IStep 7 IlEnter the Number of Fire Meters �I
Step 8 IlSelect the Size of Fire Meters
Step 9 1 Select the Type of Development Residential
Step 10 Development Category (Residential Only) Single -Family
Step 11 Number of Residential Lots/Apt. Units (Residential Only) 1
Step 12 Select the Date the Preliminary Plat was Approved After October 26, 1993
Step 13 Select the Relative Location of the Site (Residential Only) East of Denton Tap
Go to "Development Fee Worksheet' for Results
ROADWAY IMPACT FEE DATA TABLE
Project Name (Name on Plat)
CreekviewPhase 2 -Lot 2RBlock A
Step
1
Service Area, (use #1 revised 10/11/2005)
1
Step
2
Development Category
Residential
Step
3
Land Use
Residential (Medium/Low)
-Step
4
Enter Number of Residential Lots/Units
1
Ste
5
Select amount of Credit that Applies to this Project
1 0%
ost;Per Service llriit ;er veh�rriile
.:$150 Via.
.
.
N :. n' ..
o l.otstU Its
...
.. .
1 ::: ...... :::::
Dvlo merit: Units ...... .....
i:.OD........... .
Veh miles er : evelopmentiunit
4.�c4. . .
PROJECT: Creekview Phase 2 -Lot 2R Block
DATE: 6/612016
Water Impact Fee:
Domestic Meter(s): 1 - 5/8 inch X 3/4 inch = 1 ESU's
Irrigation Meter(s): 0 - 5/8 inch X 3/4 inch = 0 ESU's
0 = 0 ESU's
Fireline Meter(s): 0 = 0 ESU's
Total #: 1 ESU's @ $900.00 ea. $900.00
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea. $50.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) @ $178.50
$178.50
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
(This fee may change at the time of pick up)
Irrigation/Fireline Water Meter Fee:
Total #: 0 Irrigation Meter(s) @ $0.00
$0.00
Total #: 0 Additional Irrigation Meter(s) @ $0.00
$0.00
Total #: 0 Fireline Meter(s) @ $0.00
meter provided by developer
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea.
$30.00
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 0 Meter(s) @ $30.00 ea.
$0.00
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 1 @ $900.00 ea.
$900.00
(Due prior to issuance of building permit)
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
$50.00
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 1 Lots @ $50.00 ea.
$50.00
(100% due prior to issuance of building permit)
Page 1
Park Fee (For Residential Developments Only):
X Preliminary plat approved: After October 26, 1993
Park Development Zone:
Zone 2
1 Single-family @ $1,285.00 per lot
$1,285.00
0 Multi -family @ $1,285.00 per unit
$0.00
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
$636.00
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
Information not Available
This fee cannot be assessed until after Oncor submits
the lighting plan for the proposed development.
Once the plans are submitted, $352.44 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
Information not Available
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment. Information not Available
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
Project: Creekview Phase 2 -Lot 2R Block A
Date: 6/6/2016
TOTAL
AMOUNT DUE
FEES DUE
PRIOR TO
FILING
PLAT
Water Impact Fee
$900.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee
$50.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic)
$178.50
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline)
$0.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic)
$30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit
$0.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee
$900.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee
$50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee
$50.00
(100% due at Issuance of Building Permit)
Park Fee
$1,285.00
$1,285.00
(100% due prior to Filing Plat)
Roadway Impact Fee
$636.00
$636.00
(100% due prior to Filing Plat)
Street Light Fee
Information not Available
(100% due prior to Acceptance of Project)
11
Street Sign Fee
Information not Available
(100% due prior to Acceptance of Project)
11
Construction Inspection Fee
Information not Available
(100% due prior to Start of Construction)
TOTAL
$4,079.50
$1,921.00
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT
PROJECT: Creekview Phase 2 - Lot 2R Block
DATE: 6/6/2016
ROADWAY IMPACT FEE:
Service Area *
1
Category **
Residential
Land Use **
Residential (Medium/Low)
No. Lots/Units
1
Development Units **
1.00
Vehicle Miles per Development Unit **
4.24
Fee per Vehicle Mile * * *
$150
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) _ $636.00
* (Figure 4.1 - Roadway Impact Fee Study)
** (Table 4.10 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - The Master Fee Schedule)