Loading...
Kimbel Vill- CS160726T H E - C 1 T Y O F COPPELL July 26, 2016 RE: Conditional Final Acceptance Letter Kimbel Addition Lots 1-9 Blk B Coppell, TX 75019 Representatives of the City of Coppell have confirmed a final inspection of paving and utilities for the referenced project. The project is complete with the exception of the following condition: A Final Acceptance Letter will be issued once the two-year maintenance bonds have been received. Maturity on the bonds will be two years from the date of that letter. Maturity on the Erosion Control Bond LC will also be two years from the date of that. letter. You may notify MS4 (City of Coppell) at any time during the two-year maintenance period if stabilization of the site per the SWPPP permit can be demonstrated. If so, complete and submit a Notice of Termination (NOT) to discontinue coverage under the SWPPP permit. A follow up inspection of the facilities will be conducted prior to the. lapse of the two- year bond petiod. ' If any punch list items are noted at that time, you will be contacted to make repairs. Sincerely, `Z leIZL Marcus Marion Construction Inspector Office Phone: (972) 304-7090 Fax: (972) 304-3570 cc: Ken Griffin, P.E., Director of Engineering and Public Works Michael Garza, P.E., Assistant Director of Engineering' Michael Arellano, Chief Building Official Tim Oates, Deputy Fire Chief Jennifer Miller, Finance Director A FAMILY COMMUNITY FOR A LIFETIME 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV