Kimbel Vill- CS160726T H E - C 1 T Y O F
COPPELL
July 26, 2016
RE: Conditional Final Acceptance Letter
Kimbel Addition Lots 1-9 Blk B
Coppell, TX 75019
Representatives of the City of Coppell have confirmed a final inspection of paving and
utilities for the referenced project. The project is complete with the exception of the
following condition:
A Final Acceptance Letter will be issued once the two-year maintenance bonds have been
received. Maturity on the bonds will be two years from the date of that letter. Maturity
on the Erosion Control Bond LC will also be two years from the date of that. letter.
You may notify MS4 (City of Coppell) at any time during the two-year maintenance
period if stabilization of the site per the SWPPP permit can be demonstrated. If so,
complete and submit a Notice of Termination (NOT) to discontinue coverage under the
SWPPP permit.
A follow up inspection of the facilities will be conducted prior to the. lapse of the two-
year bond petiod. ' If any punch list items are noted at that time, you will be contacted to
make repairs.
Sincerely,
`Z leIZL
Marcus Marion
Construction Inspector
Office Phone: (972) 304-7090
Fax: (972) 304-3570
cc: Ken Griffin, P.E., Director of Engineering and Public Works
Michael Garza, P.E., Assistant Director of Engineering'
Michael Arellano, Chief Building Official
Tim Oates, Deputy Fire Chief
Jennifer Miller, Finance Director
A FAMILY COMMUNITY FOR A LIFETIME
255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV