Loading...
Park West Crossing-LR160721R940001, 05-16-16 Rev.14 Page 1 of 2 FOUNDATION OBSERVATIONS REPORT Report Number:94151183.0184 Service Date: 07/21/16 8901 Carpenter Fwy Ste 100 Report Date:07/26/16 Dallas, TX 75247-4547 Task:214-630-1010 Reg No: F-3272 Client Project ML Realty Partners Park West Crossing - Phase 2 Attn: Timothy Geisler SEC Freeport Pkwy & Southwestern Blvd One Pierce Pl Ste 450W Coppell, TX Itasca, IL 60143 Project No.94151183 Pier Identification A/1 C.9/11 B.9/11 B.5/11 C.5/11 E/9.7 E/9.3 Required Pier Diameter (in.)30 24 24 24 24 24 24 Required Penetration (ft.)6.0 6.0 6.0 6.0 6.0 6.0 6.0 Depth to Top of Bearing Stratum from Ground (ft.)21.0 19.7 23.0 23.0 22.0 23.0 23.0 Depth to Bottom of Pier from Ground Surface (ft.)27.8 26.8 30.5 31.0 29.2 30.1 30.0 Actual Penetration (ft.)6.8 7.1 7.5 8.0 7.2 7.1 7.0 Casing Outside Diameter (in.) 34 N/A 26 26 26 26 26 Depth to Bottom of Casing (ft.)21.0 N/A 23.0 23.0 22.0 23.0 23.0 Condition of Bottom (wet or dry)Dry Dry Dry Dry Dry Dry Dry Plumb Within Tolerance (yes or no)Yes Yes Yes Yes Yes Yes Yes Number of Vertical Bars (ea.)6 6 6 6 6 6 6 Reinforcing Bar Size (#)7 6 6 6 6 6 6 Time Drilling was Completed 0815 1000 1040 1100 1135 1305 1330 Time Concrete Placement was Completed 0930 1045 1100 1130 1300 1420 1430 Distance from Ground to Top of Concrete (ft.)0.0 -2.0 -2.0 -2.0 -2.0 -2.0 -2.0 Total Length of Concrete Pier (ft.)27.8 24.8 28.5 29.0 27.2 28.1 28.0 Top of Ground Elevation (ft.)N/A N/A N/A N/A N/A N/A N/A Top of Pier Elevation (ft.)N/A N/A N/A N/A N/A N/A N/A BEARING MATERIAL: DRILLING CONTRACTOR: COMMENTS:Building H Services:Foundation observations. Terracon Rep:Jonathan Baze Reported To: Contractor:Structure Tone Southwest Lunch/NC: Report Distribution (1) ML Realty Partners, Timothy Geisler (1) City of Coppell TX, Matthew Mabry(1) Halff Associates Inc, Hunter Starkey (1) ML Realty Partners, John Benson Reviewed By:____________________________________ (1) O?Brien Architects , Richard Nordyke (1) Structure Tone Southwest Inc., Damon Renaud James D. Baze (1) Structure Tone Southwest Inc., Robin Povey (1) TechniStructures, Jason Owens Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. R940001, 05-16-16 Rev.14 Page 2 of 2 FOUNDATION OBSERVATIONS REPORT Report Number:94151183.0184 Service Date: 07/21/16 8901 Carpenter Fwy Ste 100 Report Date:07/26/16 Dallas, TX 75247-4547 Task:214-630-1010 Reg No: F-3272 Client Project ML Realty Partners Park West Crossing - Phase 2 Attn: Timothy Geisler SEC Freeport Pkwy & Southwestern Blvd One Pierce Pl Ste 450W Coppell, TX Itasca, IL 60143 Project No.94151183 Pier Identification E/8.2 E/8.7 Required Pier Diameter (in.)24 24 Required Penetration (ft.)6.0 6.0 Depth to Top of Bearing Stratum from Ground (ft.)24.0 23.0 Depth to Bottom of Pier from Ground Surface (ft.)31.5 29.5 Actual Penetration (ft.)7.5 6.5 Casing Outside Diameter (in.) 26 26 Depth to Bottom of Casing (ft.)24.0 23.0 Condition of Bottom (wet or dry)Dry Dry Plumb Within Tolerance (yes or no)Yes Yes Number of Vertical Bars (ea.)6 6 Reinforcing Bar Size (#)6 6 Time Drilling was Completed 1400 1420 Time Concrete Placement was Completed 1455 1520 Distance from Ground to Top of Concrete (ft.)-2.0 -2.0 Total Length of Concrete Pier (ft.)29.5 27.5 Top of Ground Elevation (ft.)N/A N/A Top of Pier Elevation (ft.)N/A N/A BEARING MATERIAL: DRILLING CONTRACTOR: COMMENTS:Building H Services:Foundation observations. Terracon Rep:Jonathan Baze Reported To: Contractor:Structure Tone Southwest Lunch/NC: Report Distribution (1) ML Realty Partners, Timothy Geisler (1) City of Coppell TX, Matthew Mabry(1) Halff Associates Inc, Hunter Starkey (1) ML Realty Partners, John Benson Reviewed By:____________________________________ (1) O?Brien Architects , Richard Nordyke (1) Structure Tone Southwest Inc., Damon Renaud James D. Baze (1) Structure Tone Southwest Inc., Robin Povey (1) TechniStructures, Jason Owens Project Manager The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.