Loading...
Duke Freeport-LR160728July 28, 2016 Duke Realty South/West Region 14241 North Dallas Parkway, Suite 1000 ATTN:Mr. Sean Jeanes, P.E. LEED AP Tohatsu Location: Permits: Dallas, TX 75254 19:6710-A NEC Bethel Road and Freeport Parkway Coppell, TX RE: ECS Job # 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] ECS Texas, LLP LETTER OF TRANSMITTAL Texas Registered Engineering Firm # F-8461 CC:Duke Realty - Todd Henry Duke Realty - Glen Stevenson Pacheco Koch Consulting Engineers - Clayton J. Strolle, LEED AP City of Coppell - Matt Mabry Weir Bros., Inc. - Mike Weir Meinhardt & Associates - David Meinhardt LJB inc - Jim Lintz ENCL: We are enclosing: Materials Engineering Division Reports For your use As requested X X X Field Report # 87 07/27/2016 Pvmt Pour 4 Timothy TarbuttonMark R. Zortman, P.E. Principal Engineer Project ManagerJUL 28 2016 1000.1 This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS. ECS Texas, LLP 19:6710-A 87 Tohatsu Wednesday 07/27/2016 Project No. Report No. Day & DateProject 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] FIELD REPORT 12.58 The undersigned arrived on site, as requested, to observe the placement of 510 cubic yards of 3600 psi concrete for Pavement Pour 4. The required test limits were determined to be a slump of 3-5 inches, air content of 3-6 %, batch to placement time of 90 minutes, and concrete temperature range of 50-100 degrees Fahrenheit. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, air content, and batch to placement time. Five sets of five laboratory cured concrete cylinders were cast for compressive strength testing in our laboratory. Prior to the placement of concrete, reinforcing steel was observed and appeared to be placed in accordance with the project plans and specifications. 90°/ Sunny 55.00 11.50 0.00 0.00 05:00A 04:30P Pvmt Pour 4 Location Contractor On-Site Time Lab Time Client Coppell, TX Arrival Departure Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Duke Realty - Sean Jeanes, P.E. LEED AP Duke Realty - Sean Jeanes, P.E. LEED AP Trip Charges* Remarks Chargeable Items Weather Mileage* 1.08Travel Time* Total Time of Re Obs.Time * Travel time and mileage will be billed in accordance with the contract. Tolls/Parking*$5.00 Jean HabyarimanaBy 1800 1089068 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 1 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 07/27/2016 Duke Realty Sunny / 90 Duke Realty LMC Mix Designation:1701 Mix Strength:3600 psi Design Strength:3600 psi B to P min. 1 0299 64411913 9.0 9.0 05:31 06:09 06:33 *3.25 3.00(P)9462 2 0222 63104207 10.0 19.0 05:45 06:10 06:45 60 3 3035 63104208 10.0 29.0 06:00 06:15 06:57 57 4 1424 63718368 9.0 38.0 05:50 06:15 06:50 60 5 0220 63104211 9.0 47.0 06:16 06:30 07:10 54 6 0279 63104210 10.0 57.0 06:15 06:30 07:03 48 7 7069 63104209 9.0 66.0 06:20 06:35 07:01 41 8 0275 63104212 10.0 76.0 06:23 06:45 07:15 52 9 9161 64411915 9.0 85.0 06:31 06:50 07:21 50 10 1118 64411917 10.0 95.0 06:45 07:15 07:35 50 11 0291 63104216 10.0 105.0 07:00 07:15 07:45 45 12 0334 63104217 9.0 114.0 07:15 07:20 07:51 36 * Location:By:Jean HabyarimanaPavement Pour 4 ECS Texas, LLP WO:64371 * B to P - Batch to Placement time in minutes 2000.1.1.0 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 2 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 07/27/2016 Duke Realty Sunny / 90 Duke Realty LMC Mix Designation:1701 Mix Strength:3600 psi Design Strength:3600 psi B to P min. 13 1420 63104218 9.0 123.0 07:18 07:28 08:06 48 14 0005 63000130 9.0 132.0 07:20 07:31 08:15 55 * Location:By:Jean HabyarimanaPavement Pour 4 ECS Texas, LLP WO:64371 * B to P - Batch to Placement time in minutes 2000.1.1.0 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 3 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 07/27/2016 Duke Realty Sunny / 90 Duke Realty LMC Mix Designation:1701 Mix Strength:3600 psi Design Strength:3600 psi B to P min. 15 0249 63104219 10.0 142.0 07:21 07:31 08:18 57 16 0215 62540682 9.0 151.0 06:53 07:42 07:58 65 17 7006 64411920 9.0 160.0 07:25 07:44 08:22 *4.25 3.50(P)9557 18 1416 64411918 10.0 170.0 06:53 07:50 08:06 73 19 3035 63104220 9.0 179.0 07:21 08:25 08:40 79 20 0172 64411922 10.0 189.0 07:58 08:26 08:48 50 21 0279 63104224 9.0 198.0 08:15 08:30 09:15 60 22 1422 63104223 9.0 207.0 08:10 08:30 08:50 40 23 0279 63104224 10.0 217.0 08:15 08:31 09:02 47 24 1054 63718378 10.0 227.0 08:16 08:36 09:21 65 25 7065 63718379 9.0 236.0 08:15 08:40 09:27 *4.50 3.10(P)9672 26 1420 63104227 9.0 245.0 08:51 09:05 09:45 54 * Location:By:Jean HabyarimanaPavement Pour 4 ECS Texas, LLP WO:64371 * B to P - Batch to Placement time in minutes 2000.1.1.0 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 4 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 07/27/2016 Duke Realty Sunny / 90 Duke Realty LMC Mix Designation:1701 Mix Strength:3600 psi Design Strength:3600 psi B to P min. 27 0275 63104231 10.0 255.0 09:15 09:35 10:18 63 28 0220 63104233 9.0 264.0 09:20 09:35 10:31 71 * Location:By:Jean HabyarimanaPavement Pour 4 ECS Texas, LLP WO:64371 * B to P - Batch to Placement time in minutes 2000.1.1.0 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 5 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 07/27/2016 Duke Realty Sunny / 90 Duke Realty LMC Mix Designation:1701 Mix Strength:3600 psi Design Strength:3600 psi B to P min. 29 0334 63104234 10.0 274.0 09:25 09:45 10:37 72 30 0005 63000147 9.0 283.0 09:32 09:49 10:43 71 31 9113 64411939 9.0 292.0 09:15 09:55 10:15 60 32 1419 1670012 9.0 301.0 10:10 10:27 10:52 2042 33 0279 63104239 10.0 311.0 10:15 10:30 11:10 55 34 0220 1670012 10.0 321.0 09:51 10:31 10:48 57 35 0302 63104240 9.0 330.0 10:26 10:48 11:18 52 36 7003 63104243 10.0 340.0 10:30 10:48 11:29 59 37 1420 63104244 9.0 349.0 10:49 11:00 11:37 *4.50 3.30(P)91 2048 38 0337 63000152 10.0 359.0 10:42 11:10 11:40 58 39 1419 63104248 10.0 369.0 11:25 11:36 12:37 72 40 0220 63104250 9.0 378.0 11:35 11:50 12:49 74 * Location:By:Jean HabyarimanaPavement Pour 4 ECS Texas, LLP WO:64371 * B to P - Batch to Placement time in minutes 2000.1.1.0 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 6 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 07/27/2016 Duke Realty Sunny / 90 Duke Realty LMC Mix Designation:1701 Mix Strength:3600 psi Design Strength:3600 psi B to P min. 41 0005 63000161 10.0 388.0 11:39 11:54 12:52 73 42 0334 63104252 10.0 398.0 12:00 12:05 12:50 50 * Location:By:Jean HabyarimanaPavement Pour 4 ECS Texas, LLP WO:64371 * B to P - Batch to Placement time in minutes 2000.1.1.0 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 7 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 07/27/2016 Duke Realty Sunny / 90 Duke Realty LMC Mix Designation:1701 Mix Strength:3600 psi Design Strength:3600 psi B to P min. 43 6036 63000160 9.0 407.0 11:40 12:05 12:30 2050 44 1418 63104251 9.0 416.0 11:56 12:06 12:46 50 45 3014 63000166 10.0 426.0 12:10 12:28 01:21 2071 46 9131 63000168 9.0 435.0 12:30 12:46 01:30 60 47 7024 63000165 9.0 444.0 12:15 12:48 01:02 47 48 0302 63104257 9.0 453.0 12:40 12:55 01:36 56 49 7069 63104260 9.0 462.0 01:05 01:15 01:50 45 50 0279 63104259 10.0 472.0 01:00 01:15 01:44 44 51 1420 63104261 9.0 481.0 01:19 01:31 02:02 *3.75 4.50(P)92 2043 52 7025 63000170 10.0 491.0 12:45 01:34 01:55 70 53 6036 63000178 9.0 500.0 02:02 02:24 03:15 73 54 3014 63000174 10.0 510.0 02:21 02:40 03:45 84 * Location:By:Jean HabyarimanaPavement Pour 4 ECS Texas, LLP WO:64371 * B to P - Batch to Placement time in minutes 2000.1.1.0