Duke Freeport-LR160727July 27, 2016
Duke Realty
South/West Region
14241 North Dallas Parkway, Suite 1000
ATTN:Mr. Sean Jeanes, P.E. LEED AP
Tohatsu
Location:
Permits:
Dallas, TX 75254
19:6710-A
NEC Bethel Road and Freeport Parkway
Coppell, TX
RE:
ECS Job #
3033 Kellway Drive, Suite 110
Carrollton, TX 75006
(972) 392-3222 [Phone]
(214) 483-9684 [Fax]
ECS Texas, LLP
LETTER OF TRANSMITTAL
Texas Registered Engineering Firm # F-8461
CC:Duke Realty - Todd Henry
Duke Realty - Glen Stevenson
Pacheco Koch Consulting Engineers - Clayton J. Strolle, LEED AP
City of Coppell - Matt Mabry
Weir Bros., Inc. - Mike Weir
Meinhardt & Associates - David Meinhardt
LJB inc - Jim Lintz
ENCL:
We are enclosing:
Materials Engineering Division Reports
For your use
As requested
X
X
X
Field Report # 86 07/26/2016 Pavement Pour 3
Timothy TarbuttonMark R. Zortman, P.E.
Principal Engineer Project ManagerJUL 27 2016
1000.1
This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS.
ECS Texas, LLP
19:6710-A
86
Tohatsu Tuesday 07/26/2016
Project No.
Report No.
Day & DateProject
3033 Kellway Drive, Suite 110
Carrollton, TX 75006
(972) 392-3222 [Phone]
(214) 483-9684 [Fax]
FIELD REPORT
10.08
The undersigned arrived on site, as requested, to observe the placement of 229 cubic yards of
3600 psi concrete for Pavement Pour 3.
The required test limits were determined to be a slump of 3-5 inches, air content of 3-6 %,
batch to placement time of 90 minutes, and concrete temperature range of 50-95 degrees
Fahrenheit.
Concrete observed on this date appeared to be placed in compliance with project specifications
with regard to temperature, slump, air content, and batch to placement time, with some
exceptions of trucks exceeding 90 minute batch to final placement time and having a
temperature higher than design parameters.
Three sets of five laboratory cured concrete cylinders were cast for compressive strength testing
in our laboratory.
95°/ Sunny
55.00
9.00
0.00
0.00
05:00A 02:00P
Pavement Pour 3
Location
Contractor
On-Site Time
Lab Time
Client
Coppell, TX
Arrival Departure
Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted.
Duke Realty - Sean Jeanes, P.E. LEED AP
Duke Realty - Sean Jeanes, P.E. LEED AP
Trip Charges*
Remarks
Chargeable Items
Weather
Mileage*
1.08Travel Time*
Total
Time of
Re Obs.Time
* Travel time and mileage will be billed in accordance with the contract.
Tolls/Parking*$5.00
Jean HabyarimanaBy 1800
1088904
Concrete Summary Report
Project:
Location:
Contractor :
Supplier:
Project No.
Day/Date:
Client:
Weather / Temp:
Page 1
No.Ticket
No.
Truck
No.
CY Concrete
Truck Cum
Batch
Time
Truck Time
Arrive Finish Slump % Air Concrete
Temp.
Water
Added Location and Remarks
Tohatsu 6710-A
NEC Bethel Road and Freeport Parkway
Coppell, - Dallas County - TX 75019-
07/26/2016
Duke Realty
Sunny / 95
Duke Realty
LMC
Mix Designation:1701 Mix Strength:3600 psi Design Strength:3600 psi
B to P
min.
1 9161 64411814 9.0 9.0 06:49 07:10 07:26 *3.10 3.00 9437
2 0275 63104136 9.0 18.0 07:00 07:15 07:51 51
3 7069 63104138 10.0 28.0 07:10 07:22 07:58 48
4 7017 64411815 10.0 38.0 07:05 07:27 07:46 41
5 3014 63000063 9.0 47.0 07:08 07:29 08:30 82
6 0003 63000062 9.0 56.0 07:20 07:31 08:06 46
7 0302 63104140 10.0 66.0 07:33 07:40 08:13 40
8 0002 63000064 10.0 76.0 07:40 07:55 08:33 53
9 9131 63000066 9.0 85.0 07:45 08:00 08:39 54
10 7029 63000067 10.0 95.0 07:51 08:17 08:42 51
11 7024 63104145 9.0 104.0 07:58 08:20 08:50 52
12 7069 63104147 10.0 114.0 08:32 08:45 09:17 *4.10 3.50 10045
* Location:By:Jean HabyarimanaPavement Pour 3
ECS Texas, LLP
WO:64329
* B to P - Batch to Placement time in minutes
2000.1.1.0
Concrete Summary Report
Project:
Location:
Contractor :
Supplier:
Project No.
Day/Date:
Client:
Weather / Temp:
Page 2
No.Ticket
No.
Truck
No.
CY Concrete
Truck Cum
Batch
Time
Truck Time
Arrive Finish Slump % Air Concrete
Temp.
Water
Added Location and Remarks
Tohatsu 6710-A
NEC Bethel Road and Freeport Parkway
Coppell, - Dallas County - TX 75019-
07/26/2016
Duke Realty
Sunny / 95
Duke Realty
LMC
Mix Designation:1701 Mix Strength:3600 psi Design Strength:3600 psi
B to P
min.
13 0006 63000071 9.0 123.0 08:43 09:01 09:24 41
14 1420 63104148 10.0 133.0 08:55 09:07 09:40 45
* Location:By:Jean HabyarimanaPavement Pour 3
ECS Texas, LLP
WO:64329
* B to P - Batch to Placement time in minutes
2000.1.1.0
Concrete Summary Report
Project:
Location:
Contractor :
Supplier:
Project No.
Day/Date:
Client:
Weather / Temp:
Page 3
No.Ticket
No.
Truck
No.
CY Concrete
Truck Cum
Batch
Time
Truck Time
Arrive Finish Slump % Air Concrete
Temp.
Water
Added Location and Remarks
Tohatsu 6710-A
NEC Bethel Road and Freeport Parkway
Coppell, - Dallas County - TX 75019-
07/26/2016
Duke Realty
Sunny / 95
Duke Realty
LMC
Mix Designation:1701 Mix Strength:3600 psi Design Strength:3600 psi
B to P
min.
15 0302 63104150 9.0 142.0 09:07 09:20 10:55 108
16 0009 63000072 9.0 151.0 08:59 09:20 09:59 60
17 0291 63104151 10.0 161.0 09:12 09:22 10:55 103
18 3014 63104149 10.0 171.0 08:59 09:28 10:05 66
19 0003 63000075 10.0 181.0 09:35 09:42 11:05 90
20 9131 63000074 9.0 190.0 09:30 09:45 11:03 93
21 0249 63104155 9.0 199.0 09:50 10:05 11:10 80
22 0220 63104156 10.0 209.0 09:50 10:05 11:13 *3.60 4.50 10083
23 0220 63104156 10.0 219.0 09:50 10:05 11:13 83
24 3014 63104159 0.0 219.0 10:21 10:31 11:35 4074
25 1420 63104158 0.0 219.0 10:24 10:36 11:28 64
26 0314 63104167 10.0 229.0 12:06 12:19 01:32 86
* Location:By:Jean HabyarimanaPavement Pour 3
ECS Texas, LLP
WO:64329
* B to P - Batch to Placement time in minutes
2000.1.1.0