Loading...
Duke Freeport-LR160727July 27, 2016 Duke Realty South/West Region 14241 North Dallas Parkway, Suite 1000 ATTN:Mr. Sean Jeanes, P.E. LEED AP Tohatsu Location: Permits: Dallas, TX 75254 19:6710-A NEC Bethel Road and Freeport Parkway Coppell, TX RE: ECS Job # 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] ECS Texas, LLP LETTER OF TRANSMITTAL Texas Registered Engineering Firm # F-8461 CC:Duke Realty - Todd Henry Duke Realty - Glen Stevenson Pacheco Koch Consulting Engineers - Clayton J. Strolle, LEED AP City of Coppell - Matt Mabry Weir Bros., Inc. - Mike Weir Meinhardt & Associates - David Meinhardt LJB inc - Jim Lintz ENCL: We are enclosing: Materials Engineering Division Reports For your use As requested X X X Field Report # 86 07/26/2016 Pavement Pour 3 Timothy TarbuttonMark R. Zortman, P.E. Principal Engineer Project ManagerJUL 27 2016 1000.1 This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS. ECS Texas, LLP 19:6710-A 86 Tohatsu Tuesday 07/26/2016 Project No. Report No. Day & DateProject 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] FIELD REPORT 10.08 The undersigned arrived on site, as requested, to observe the placement of 229 cubic yards of 3600 psi concrete for Pavement Pour 3. The required test limits were determined to be a slump of 3-5 inches, air content of 3-6 %, batch to placement time of 90 minutes, and concrete temperature range of 50-95 degrees Fahrenheit. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, air content, and batch to placement time, with some exceptions of trucks exceeding 90 minute batch to final placement time and having a temperature higher than design parameters. Three sets of five laboratory cured concrete cylinders were cast for compressive strength testing in our laboratory. 95°/ Sunny 55.00 9.00 0.00 0.00 05:00A 02:00P Pavement Pour 3 Location Contractor On-Site Time Lab Time Client Coppell, TX Arrival Departure Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Duke Realty - Sean Jeanes, P.E. LEED AP Duke Realty - Sean Jeanes, P.E. LEED AP Trip Charges* Remarks Chargeable Items Weather Mileage* 1.08Travel Time* Total Time of Re Obs.Time * Travel time and mileage will be billed in accordance with the contract. Tolls/Parking*$5.00 Jean HabyarimanaBy 1800 1088904 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 1 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 07/26/2016 Duke Realty Sunny / 95 Duke Realty LMC Mix Designation:1701 Mix Strength:3600 psi Design Strength:3600 psi B to P min. 1 9161 64411814 9.0 9.0 06:49 07:10 07:26 *3.10 3.00 9437 2 0275 63104136 9.0 18.0 07:00 07:15 07:51 51 3 7069 63104138 10.0 28.0 07:10 07:22 07:58 48 4 7017 64411815 10.0 38.0 07:05 07:27 07:46 41 5 3014 63000063 9.0 47.0 07:08 07:29 08:30 82 6 0003 63000062 9.0 56.0 07:20 07:31 08:06 46 7 0302 63104140 10.0 66.0 07:33 07:40 08:13 40 8 0002 63000064 10.0 76.0 07:40 07:55 08:33 53 9 9131 63000066 9.0 85.0 07:45 08:00 08:39 54 10 7029 63000067 10.0 95.0 07:51 08:17 08:42 51 11 7024 63104145 9.0 104.0 07:58 08:20 08:50 52 12 7069 63104147 10.0 114.0 08:32 08:45 09:17 *4.10 3.50 10045 * Location:By:Jean HabyarimanaPavement Pour 3 ECS Texas, LLP WO:64329 * B to P - Batch to Placement time in minutes 2000.1.1.0 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 2 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 07/26/2016 Duke Realty Sunny / 95 Duke Realty LMC Mix Designation:1701 Mix Strength:3600 psi Design Strength:3600 psi B to P min. 13 0006 63000071 9.0 123.0 08:43 09:01 09:24 41 14 1420 63104148 10.0 133.0 08:55 09:07 09:40 45 * Location:By:Jean HabyarimanaPavement Pour 3 ECS Texas, LLP WO:64329 * B to P - Batch to Placement time in minutes 2000.1.1.0 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 3 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 07/26/2016 Duke Realty Sunny / 95 Duke Realty LMC Mix Designation:1701 Mix Strength:3600 psi Design Strength:3600 psi B to P min. 15 0302 63104150 9.0 142.0 09:07 09:20 10:55 108 16 0009 63000072 9.0 151.0 08:59 09:20 09:59 60 17 0291 63104151 10.0 161.0 09:12 09:22 10:55 103 18 3014 63104149 10.0 171.0 08:59 09:28 10:05 66 19 0003 63000075 10.0 181.0 09:35 09:42 11:05 90 20 9131 63000074 9.0 190.0 09:30 09:45 11:03 93 21 0249 63104155 9.0 199.0 09:50 10:05 11:10 80 22 0220 63104156 10.0 209.0 09:50 10:05 11:13 *3.60 4.50 10083 23 0220 63104156 10.0 219.0 09:50 10:05 11:13 83 24 3014 63104159 0.0 219.0 10:21 10:31 11:35 4074 25 1420 63104158 0.0 219.0 10:24 10:36 11:28 64 26 0314 63104167 10.0 229.0 12:06 12:19 01:32 86 * Location:By:Jean HabyarimanaPavement Pour 3 ECS Texas, LLP WO:64329 * B to P - Batch to Placement time in minutes 2000.1.1.0