First Assembly-CS 950605 Benchmark Group
engineers Of T~xa$, linc. surveyors
2929 N. Central Expressway · Suite 100 · Richardson, Texas 75080
(214) 680-3037 · Fax 680-3052
May 30, 1995
Mr. Jim Witt
City Manager
City of Coppell ..................
255 Parkway Blvd.
P.O. Box 478
Coppell, Texas 75019
Deer Mr. Witt,
Pursuant to the First Assembly of God Church located on Heartz Road in Coppell, this
letter is to serve as confirmation that your office is in agreement with the churches desire to
use less than 6", or a material other than lime stabilization, as a base material for the
chumhes proposed parking lot expansion.
We are proceeding forward with our design plans based on the preceeding assumption
and ask that if this is not your understanding or agreement with Pastor McBride that you call
my office upon receipt of this lelter and notify me, as this does affect our design parameters.
Thank you very much for your help on this project and attention to this matter.
Best Regards,
Mark H. Hickman P.E.
Engineering Manager