Loading...
crs email statementsActivity 430: We do have disaster recovery in place. The City of Coppell stores records electronically offsite at least one mile away out of the floodplain. They are continuously transferred to the offsite storage. Activity 440: We update the city’s GIS system to include LOMR’s for subdivisions or annexations as soon as they are available. Activity 450: the design-storm size can be found on page V-1 of the city wide storm water management study. The size of development can be found in the Dallas Design Manual which we follow and reference in our subdivision ordinance for design criteria. Attached is the information requested. Michael Garza, P.E. Assistant Director of Engineering Engineering Department City of Coppell, TX <http://www.coppelltx.gov> www.coppelltx.gov 972-304-7019 (office) <http://www.coppelltx.gov/> <https://www.facebook.com/pages/City-of-Coppell-TX-Municipal-Government/324357528624> <https://twitter.com/CityofCoppell> <http://www.youtube.com/CityOfCoppellTX> <http://www.coppelltx.gov/e cocoppell-522.html> Please take our customer service survey