Loading...
CRSMs. Mares, Please follow the attached link to the documents requested. Below are also the statements requested. I believe John has sent you maps as well. If you need further information please do not hesitate to ask. ftp://ftp1.coppelltx.gov/eng/ File name is CRS.zip Activity 330: We have information being distributed in both our Water Bill Insert and Coppell Clips. This information runs quarterly, with publication being in Coppell Clips next week. Activity 350: The City of Coppell website is up-to-date with correct floodplain verbiage and active links. Activity 430: We do have disaster recovery in place. The City of Coppell stores records electronically offsite at least one mile away out of the floodplain. They are continuously transferred to the offsite storage. Activity 440: We update the city’s GIS system to include LOMR’s for subdivisions or annexations as soon as they are available. Activity 450: the design-storm size can be found on page V-1 of the city wide storm water management study. The size of development can be found in the Dallas Design Manual which we follow and reference in our subdivision ordinance for design criteria. If you have any questions, please contact me at your convenience. Thanks, Michael Garza, P.E. Assistant Director of Engineering Engineering Department City of Coppell, TX <http://www.coppelltx.gov> www.coppelltx.gov 972-304-7019 (office) <http://www.coppelltx.gov/> <https://www.facebook.com/pages/City-of-Coppell-TX-Municipal-Government/324357528624> <https://twitter.com/CityofCoppell> <http://www.youtube.com/CityOfCoppellTX> <http://www.coppelltx.gov/e cocoppell-522.html> Please take our customer service survey