Loading...
Fouders Crossing DR.xlsxTimestamp 5/13/2015 1:53:48 PM 5/14/2015 9:50:16 AM 5/15/2015 9:57:43 AM 5/18/2015 9:58:57 AM 5/19/2015 8:14:32 AM 5/21/2015 12:57:52 PM 5/22/2015 6:58:11 PM 5/26/2015 9:50:39 AM 5/28/2015 8:29:52 AM 5/28/2015 3:25:04 PM 5/29/2015 2:09:20 PM 6/1/2015 3:39:00 PM 6/2/2015 2:16:31 PM 6/5/2015 9:42:51 AM 6/5/2015 2:29:28 PM 6/8/2015 2:38:05 PM 6/9/2015 1:34:03 PM 6/10/2015 11:41:54 AM 6/11/2015 2:30:44 PM 6/12/2015 3:46:39 PM 6/15/2015 1:59:24 PM 6/16/2015 6:04:43 PM 6/17/2015 5:53:54 PM 6/19/2015 9:13:32 AM 6/19/2015 1:33:26 PM 6/22/2015 3:28:33 PM 6/23/2015 10:40:49 AM 6/24/2015 6:06:46 PM 6/25/2015 6:23:02 PM 6/27/2015 10:12:02 AM 6/29/2015 1:54:17 PM 7/1/2015 8:06:28 AM 7/1/2015 2:47:26 PM 7/2/2015 6:11:09 PM 7/3/2015 9:31:47 AM 7/7/2015 2:01:55 PM 7/8/2015 1:20:59 PM 7/9/2015 1:49:44 PM 7/10/2015 12:52:41 PM 7/13/2015 3:00:32 PM 7/14/2015 12:32:39 PM 7/15/2015 3:18:40 PM 7/16/2015 2:18:24 PM 7/18/2015 8:48:51 AM 7/20/2015 2:23:14 PM 7/21/2015 2:33:47 PM 7/22/2015 2:15:05 PM 7/29/2015 9:29:50 AM 8/3/2015 10:31:55 AM 8/4/2015 7:48:22 AM 8/5/2015 9:53:30 AM 8/10/2015 12:42:31 PM 8/11/2015 6:09:31 PM 8/18/2015 12:47:31 PM 8/24/2015 2:24:28 PM 8/31/2015 3:29:24 PM 9/9/2015 2:49:11 PM 9/14/2015 9:52:20 AM Date 5/13/2015 1:39:00 PM 5/14/2015 9:10:00 AM 5/15/2015 10:34:00 AM 5/18/2015 7:30:00 AM 5/19/2015 7:55:00 AM 5/20/2015 7:30:00 AM 5/22/2015 1:45:00 PM 5/26/2015 9:39:00 AM 5/27/2015 2:00:00 AM 5/28/2015 3:00:00 AM 5/29/2015 1:15:00 PM 6/1/2015 3:30:00 PM 6/2/2015 2:10:00 PM 6/4/2015 2:00:00 PM 6/5/2015 2:25:00 PM 6/8/2015 2:30:00 PM 6/9/2015 1:00:00 PM 6/10/2015 11:40:00 AM 6/11/2015 1:45:00 PM 6/12/2015 3:39:00 PM 6/15/2015 1:55:00 PM 6/16/2015 3:30:00 PM 6/17/2015 3:00:00 PM 6/18/2015 3:00:00 PM 6/19/2015 7:45:00 AM 6/22/2015 3:20:00 PM 6/23/2015 10:00:00 AM 6/24/2015 3:40:00 PM 6/25/2015 3:30:00 PM 6/26/2015 7:00:00 AM 6/29/2015 1:10:00 PM 6/30/2015 7:00:00 AM 7/1/2015 2:39:00 PM 7/2/2015 7:30:00 AM 7/3/2015 9:30:00 AM 7/7/2015 2:05:00 PM 7/8/2015 1:15:00 PM 7/9/2015 1:45:00 PM 7/10/2015 1:45:00 PM 7/13/2015 1:25:00 PM 7/14/2015 12:25:00 PM 7/15/2015 3:20:00 PM 7/16/2015 9:45:00 AM 7/17/2015 8:45:00 AM 7/20/2015 2:15:00 PM 7/21/2015 2:30:00 PM 7/22/2015 2:10:00 PM 7/29/2015 9:10:00 AM 8/3/2015 10:30:00 AM 8/4/2015 7:45:00 AM 8/5/2015 9:50:00 AM 8/10/2015 12:35:00 PM 8/11/2015 6:05:00 PM 8/18/2015 12:45:00 PM 8/24/2015 1:50:00 PM 8/31/2015 10:36:00 AM 9/9/2015 2:35:00 PM 9/14/2015 9:42:00 AM Project Name Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Founder's Crossing Contractor Name Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Royal General Contractor Project Inspector Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Marcus Marion Temperature 68 69 72 76 72 86-62 61 66 76.2 88 75 83 87 80 92 95 97 93 92 94 87 77 75 85 81 93 86 95 92 79 91 75 92 77 81 88 73 91 90 96 94 96 85 83 100 97 97 85 93 81 88 100 97 94 97 93 89 76 Weather Raining Overcast Light Rain Sunny Overcast Overcast Overcast Overcast Sunny Cloudy/ Partly Sunny Overcast Sunny Sunny Sunny Sunny Sunny sunny Sunny Sunny Sunny Sunny Light Rain/Cloudy Rain Sunny/Partly Cloudy Sunny/Partly Cloudy Sunny Sunny Sunny Sunny/Partly Cloudy Sunny Sunny/Overcast Sunny/Partly Cloudy Sunny Partly Cloudy Sunny Cloudy Cloudy Rain Overcast Sunny Sunny Sunny Sunny Sunny Sunny Sunny Sunny Sunny Sunny Sunny Sunny Sunny Sunny Sunny Sunny/Partly cloudy Sunny Sunny Cloudy Partly Cloudy Wind 3 ESE S 14 MPH S 7 MPH S 8 MPH SE 3 MPH NE 13 MPH NNE 12 MPH SSE 1 MPH SSE 7 MPH 3 MPH West NNE 3 MPH SSE 4 MPH SSE 9 MPH SSW 3 MPH West 5 MPH West 4 MPH calm ESE 7 MPH SSE 6 MPH ESE 5 MPH SE SE 15 MPH WSW 11 MPH WSW 12.7 MPH SSW 4 MPH ESE 5 MPH South 4 MPH South 11 MPH WNW 4 MPH NW 1 MPH SW 2 MPH SW 7 MPH SSW 15 MPH WSW 5 MPH South 8 MPH SSW 7 MPH South 12 MPH South 3 MPH SSE 4 MPH West 3 MPH South 7 MPH SSW 5 MPH South 8 MPH ESE 17 MPH SSE 8 MPH SSE 19 MPH SE 3 MPH Calm S 6 MPH SW 6 MPH Calm NE 8 MPH WSW 8 MPH NNW7 MPH Calm ENE 11 MPH ESE 3 MPH Humidity 90 93 85 78 90 93 83 91 70 59 82 46 53 67 48 45 40 47 48 64 59 91 97 58 62 52 71 43 42 67 59 83 51 74 75 58 90 51 59 51 52 41 60 71 37 56 53 63 40 62 62 29 32 44 44 40 64 57 Construction Activities The contractor is working on the 3rd building pad (Furthest to to the east). Proctor test are being performed by Alpha No work is being performed on sewer, water, drainage, or paving. The contractor is finishing up the third and final building pad The contractor plans to start saw cutting the Bethel driveway Monday. Depending on the weather, the contractor plans to start installing water, and Sue or next week. The contractor is still working on the final left on the third building pad. Still, no sewer, water, drainage, or pavement is being laid. The SWPPP is intact The contractor is pumping rain water out the second building pad from this weekend. The contractor plans to place flex material on the second pad. Flex material was place on 1st building pad on Saturday. The contractor is still working on building pad 2. Pennington Concrete Construction is laying The frames for the foundation. The electrical crew will be out tomorrow to put in the conduit that will service building 1. The plumbers will be here on Thursday. By the end of the week the contractor should start working on saw cutting the Bethel entrance. The contractor is still working on the 2nd and 3rd building pad The electrical contractor is supposed to be installing conduit today I was not able to stay out because of a class The contractor finished placing flex on the the last building pad.' The sub-contractor framed-up the last 2 building pads. The plumbers installed the the pipe under the building and left a stub-out for later connection. The electrician installed the conduit in the building pad. The contractor saw-cut the inlet on Bethel. I spoke to the contractor about not having proper signage not being up The plumbers are supposed to drain and install the piping. No other work will be done because the work site is too muddy. The contractor plans to have the concrete poured for the building pad Monday. Both of the entry ways are saw-cut, but the concrete is not removed The contractor believes that they are about 10% done. The plumbers came to the site to finish installing the sewer pipe. No other work was done on the site today. The subcontractor is removing the drain on Bethel. I informed the contractor to place flagging around the hole and to either bend down or cover the the rebar. The contractor will email me the traffic plan so I can make sure the traffic control is maintained. The subcontractor is working on the the forms for the three building pad. The subcontractor plans to install the post tension cable next week. No other work was performed due to the poor weather. The subcontractor is preparing to pour concrete on the 3 grate inlet The contractor will be pouring at 12;30pm tomorrow. I will check on the inlet at 9:30 in the morning The contractor plans to pour the building pad on Friday The contractor poured the 3 grate drain. The subcontractor is working on the foundation of the building. The contractor plans to poor the building pad on Tuesday. Monday the contractor plans to start working on the sewer and water. The contractor was preparing the Bethel entrance THe contractor is preparing to pour the building pads The contractor will not be able to pour until wednesday THe contractor is working on the Bethel entrance and preparing it for the pour next Wednesday. The subcontractor worked on the building pad. The utility contractor should be here Thursday to install water and sewer. The subcontractor is working on the driveway. All of the flex base is put in, but the header still needs to be cut. Pedeington is still woking on the on the foundation. The contractor is completing the last of the building pads. The subcontractor is working on the the entrance of the driveway. The building inspector denied the the inspection because the rebar was not complete in the patio area. The contractor plans to pour the building pad and the driveway. Another inspection will be done before the end of the day. The contractor is pouring the building pads. The contractor could not get the driveway prepared in time so the contractor is going to have to pour the driveway later. The utility crew should be on site next week. The contractor is preparing the driveway coming off of Bethel The contractor is preparing the Bethel driveway. The contractor had an issue with water being in the driveway. The forms are up but need rebar. The contractor tightened the post tension cables 70%. The will tighten the rest Wednesday. The contractor has material on site for the walls to start going up. I spoke with Tim Oats about the fire line not being put up. He said that it was ok for the wall to go up because fire trucks can use Hammond's street or the chamber of commerce driveway. I informed the contractor that the leaking water should be located prior to concrete being poured. The contractor worked on putting the frame on the building pad. The contractor is still working on trying to find the leak. No work was performed because of the poor weather The contractor is working on the frame work for the building. The was an issue with a delivery truck being broke down on Bethel and no flagmen on site. We addressed the issue and the truck was moved. The contractor is still working on the framing of the building. I informed the contractor twice that the driveway entrance needs to be pumped out. The contractor still needs to find out where the water is coming from. The contractor is still working on the frame work of the buildings. The contractor is still pumping water out of the driveway approach. Th contractor is still working on the on the frame work and the roof of the buildings. The driveway approach is pumped out. Micah has got in contact with the Mr John Elias about the sprinkler system. The system has a leak so the water will be shut off. The contractor plans to pour the driveway Thursday The contractor is working on wrapping the building. The contractor pumped water out of the driveway. The roof is on all of the buildings. The contractor wants to have inspection for the entrance driveway if the water can be shutt-off. The contractor is working on the building. The contractor is also working on the driveway approach. The contractor is working on the exterior of the building. The siding is going up. The contractor is still working on the driveway approach. The driveway is remaining dry The contractor is working on the interior of the building and the siding of the building. The contractor is pumping the water out of the driveway approach. The contractor plans to pour the concrete on Wednesday. The contractor is is still working on the siding of the house. The contractor has not been working on the driveway. The header still needs to cut out and the rebar still needs to be doweled in. The drain was poured at the right elevation. We are having a meeting about the drain and seeing if it needs to be raised before the the driveway is poured. The contractor is working on the exterior and the interior of the building. Pennington is working on the driveway approach. Micah, Mr. Rick and I met to discuss the driveway dip. The way the contractor has the driveway is ok, but the contractor will have to dowel into the inlet. The contractor is still working on the building. The interior and the exterior. No work was performed on the on the entrance today, but the contractor plans to pour concrete at 4:30am The contractor is pouring the driveway approach. The contractor is also working on the interior of the building. The contractor is working on the utilities. The manhole is at the location of the end of the gas line. The contractor is still working on the interior of the building. The contractor is working on the storm drain on the project. The contractor is also working on the interior of the buildings. The building inspection looked at the building The contractor is still working on the drainage and preparing for the manhole.s The contractor wants to prepare the rear drive. The contractor is still waiting on the gas line to relocate the gas line. The contractor is still working on the sewer. The contractor is still working on the interior of the building. The gas line was moved out of the way. The contractor is still working on the sewer The contractor is still working on the interior of the building. We explained to the contractor that clean out needs to be a T-WYE were that flow direction can be witnessed. The contractor is still working on the sewer line. The contractor plans to install the last clean out on the property line. The clean out furthest to the east is correct and the other 2 will stay the same because they were already installed. The contractor is having the soil tamped and tested. The contractor is also working on the interior of the buildings. The contractor filled the sewer line with water to test the line. The contractor is still working on the interior of the building. The contractor is working on the on the interior of the building. The contractor is working on the storm drain installation. I explained to contractor the storm drain City of Coppell detail. The contractor plans to work on the sewer manhole tomorrow. The contractor is still working on the storm drain The contractor is working on the interior of the building. The contractor Is pouring the manhole on the property I informed the contractor about the cradle under the sewer line coming out of the manhole pour. The contractor is still working on the interior of the project. The contractor is working on the service connection. We agreed that the contractor can use compression fitting. The contractor is still working on the interior. The contractor is working on the manhole. The contractor plans to finish the storm drain tomorrow. The contractor plans to start pressure testing on water on Monday. The contractor has finished installing the storm drain and tying the storm drain into the existing storm drain. I asked the contractor to video the inside of the existing pipe so that I can make sure that there are no snags on the existing lines. The contractor has installed the 3 water lines that ties into the building. The contractor is installing the back flow preventers. The contractor tied the sewer line into the double clean out. The contractor is still having the density test taken while he is covering up the all of the underground conduit. The contractor is finishing the sewer and storm drain tie in; The contractor is working on the south parking area. The contractor is working on the south pavement entrance. The contractor plans to pour the concrete on Thursday. The contractor still needs to chlorinate the water line. The contractor still needs to video the sewer line and video the connection of the sewer line. The contractor is preparing to pour concrete on the south approach and parking area. The forms still need to be set and the rebar still needs to be tied. The concrete is set up for 6:00am tomorrow morning. Cylinders will be made for the concrete pour. The contractor pour the parking area to the south side of the property . The contractor started the pour at 4:30 am The contractor is removing the forms off the parking area that was poured yesterday. The contractor is still working on the interior of the building. The contractor is still working on the interior of the project. The contractor is going to have the sewer line TVed and the the connection of the storm drain into the existing storm drain. I performed an inspection on the sidewalk. The contractor needed to make sure the curb rebar was installed properly. The concrete was poured today on both the north and south side of the property. The contractor did not saw cut 18"from the back of curb. The contractor has poured the sidewalk on the south side the property. I inspected the rebarr and informed the contractor of the changes that needed to take place. I told the contractor that the sidewalk on the north side of the property nnede to go around the light pole. The contractor marked the curb with the right indication and paint for the sewer and water. The contractor intends to have the lanes and the sod down on the property, I scheduled a walk through for the project for Wednesday, August 9 at 9:00, The contractor says that everything will be done. I informed the contractor abouth the asbuilts, the maintenance bonds and the erosion control bonds for the project. The contractir is bacterializing the services per requist at the precon. The contractor had a walk through today. Water, Sewer, and Street Department came and inspected the site. There were a few items that need to be addressed. I gave the punchlist to Mike Arellano. The Fire and Building inspection already inspected the site yesterday. The contractor re-videoed the the sewer line because the first video was not accepted. I watched as the camera man videoed the line and everything was cleared. I will give the video to the Sewer Department after after it has been reviewed. All of the sod and striping was complete. The contractor is still working on the interior of the building. The contractor has finished everything on the punchlist except for the sidewalk panel. The sub-contractor will be onsite to replace the panels. The adjacent property will be seeded and water the grass for the property owner. The owners of the property is occupying and using the building. Geotechnical Proctor Proctor Proctor Proctor Proctor Cylinder for building pad Densities for trench line Densities for trench line Cylinders for street or alley Cylinders for street or alley Cylinders for sidewalk Cylinders for sidewalk Recorded Damages