Loading...
Duke Freeport-LR160809 (2) ECS Texas, LLP 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 LETTER OF TRANSMITTAL (972) 392-3222 \[Phone\] (214) 483-9684 \[Fax\] Texas Registered Engineering Firm# F-8461 August 9, 2016RE:Tohatsu Duke RealtyECS Job #19:6710-A South/West Region 14241 North Dallas Parkway, Suite 1000Permits: Dallas, TX 75254Location:NEC Bethel Road and Freeport Parkway Coppell, TX ATTN:Mr. Sean Jeanes, P.E. LEED AP We are enclosing: XMaterials Engineering Division Reports XFor your use XAs requested CC:Duke Realty - Todd Henry Duke Realty - Glen Stevenson Pacheco Koch Consulting Engineers - Clayton J. Strolle, LEED AP City of Coppell - Matt Mabry Weir Bros., Inc. - Mike Weir Meinhardt & Associates - David Meinhardt LJB inc - Jim Lintz ENCL: Field Report # 8808/01/2016Pvmt SG/Bethel Reinf Mark R. Zortman, P.E. Timothy Tarbutton AUG 9 2016 Principal Engineer Project Manager This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS. 1000.1 ECS Texas, LLP 3033 KellwayDrive, Suite 110 Carrollton, TX 75006 FIELD REPORT (972) 392-3222 \[Phone\] (214) 483-9684 \[Fax\] 19:6710-A Project No. 88 Report No. TohatsuMonday 08/01/2016 ProjectDay & Date 87°/ Sunny Weather Coppell, TX Location 0.75 On-Site Time Duke Realty - Sean Jeanes, P.E. LEED AP Client 0.33 Lab Time Duke Realty - Sean Jeanes, P.E. LEED AP Contractor 1.00 Travel Time* 2.08 Total 0.00 Re Obs.Time Pvmt SG/Bethel Reinf Remarks Time ofArrivalDeparture 55.00 Trip Charges*Tolls/Parking*Mileage* 10:30A11:15A Chargeable Items * Travel time and mileage will be billed in accordance with the contract. Summaryof Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. The undersigned arrived on site, as requested, to observe: 1. The compaction of soils for Pavement Subgrade. Utilizing the nuclear test method to check the compaction of soils; test results indicated that the compacted material, at the areas and elevations tested, met or exceeded the project requirements of 95% of the maximum drydensityand moisture content above OMC as obtained in our laboratoryusing the ASTM D 698-12 Method A Standard, with the exception of Test 4 which will be re-tested on a later date. Locations and elevations of all tests are based on stakeout provided byothers. We cannot be responsible for structures located off of the observed engineered pad, misaligned utilities or stakeout errors causing uncontrolled fill to be placed in structural areas. 2. The reinforcing steel for the approach at Bethel Road. After reviewing the applicable plans and specifications, reinforcing steel appeared to be properlyinstalled. Milton E. Perez, — Field Technician1800 By 1089434 Uncorrected Opt. MC paction Comments Low Moisture, :64553 Low Com 08/01/16 WO Uncorrected Max. Density Page 1 P / F Date: PPPF Percent Comp. (%) 97.295.595.094.6 Content Moisture (%) 12.513.514.9 7.6 2817 441 Test Data Density (pcf) 113.4111.4110.9110.4 Dry Test Method ASTM Nuclear Moisture Std Density Density Std (pcf)127.6126.5127.4118.8 t We Corrected STM Nuclear Moisture Content Optimum 11.4011.4011.4011.40 (%) Proctor Method 3718 Nuclear Gauge No.Corrected Maximum Density 116.70116.70116.70116.70 (pcf) Dry 5001EZ Troxler 3430 Oversize , A Ser. No. 0.000.000.000.00 Tohatsu % Model Field Compaction Summary Make Sample No. Project Name: D4S-5D4S-5D4S-5D4S-5 Lift / Elev SGSGSGSG Test Mode: DT = Direct Transmission BS = Back Scatter ent North Side of the Building Padent North Side of the Building Padent North Side of the Building Pad est Side of the Building Pad Milton E. Perez Duke Realty Duke Realty Description 6710-A Technician: Contractor: Project No: Client: Station / Location ent W PavemPavemPavemPavem Depth Probe S, LLP (in.) 8688 Sample No. Mode Test ECS TEXA DTDTDTDT Test No. 1234