Duke Freeport-LR160809 (3) ECS Texas, LLP 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 LETTER OF TRANSMITTAL (972) 392-3222 \[Phone\] (214) 483-9684 \[Fax\] Texas Registered Engineering Firm# F-8461 August 9, 2016RE:Tohatsu Duke RealtyECS Job #19:6710-A South/West Region 14241 North Dallas Parkway, Suite 1000Permits: Dallas, TX 75254Location:NEC Bethel Road and Freeport Parkway Coppell, TX ATTN:Mr. Sean Jeanes, P.E. LEED AP We are enclosing: XMaterials Engineering Division Reports XFor your use XAs requested CC:Duke Realty - Todd Henry Duke Realty - Glen Stevenson Pacheco Koch Consulting Engineers - Clayton J. Strolle, LEED AP City of Coppell - Matt Mabry Weir Bros., Inc. - Mike Weir Meinhardt & Associates - David Meinhardt LJB inc - Jim Lintz ENCL: Field Report # 8908/02/2016Leave Out, Approach Mark R. Zortman, P.E. Timothy Tarbutton AUG 9 2016 Principal Engineer Project Manager This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS. 1000.1 ECS Texas, LLP 3033 KellwayDrive, Suite 110 Carrollton, TX 75006 FIELD REPORT (972) 392-3222 \[Phone\] (214) 483-9684 \[Fax\] 19:6710-A Project No. 89 Report No. TohatsuTuesday 08/02/2016 ProjectDay & Date 81°/ Sunny Weather Coppell, TX Location 8.50 On-Site Time Duke Realty - Sean Jeanes, P.E. LEED AP Client 1.00 Lab Time Duke Realty - Sean Jeanes, P.E. LEED AP Contractor 1.00 Travel Time* 10.50 Total 0.00 Re Obs.Time Leave Out, Approach Remarks Time ofArrivalDeparture 55.00 Trip Charges*Tolls/Parking*Mileage* 06:45A03:15P Chargeable Items * Travel time and mileage will be billed in accordance with the contract. Summaryof Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. The undersigned arrived on site, as requested, to observe: 1. The placement of 24 cubic yards of 4000 psi concrete for Approach at Bethel Road. The required test limits were determined to be a slump of 3-5 inches, air content of 3-6 %, batch to placement time of 90 minutes, and concrete temperature range of 50-95 degrees Fahrenheit. 2. The placement of 57 cubic yards of 3500 psi concrete for Building Pad Slab Leave Out. The required test limits were determined to be a slump of 3-5 inches, air content of 0-3 %, batch to placement time of 90 minutes, and concrete temperature range of 50-95 degrees Fahrenheit. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, air content, and batch to placement time. Two sets of five laboratorycured concrete cylinders were cast for compressive strength testing in our laboratory. Prior to the placement of concrete, reinforcing steel was observed and appeared to installed in accordance with plans and specifications. Milton E. Perez, — Field Technician1800 By 1089496 :64584 WO Page 1 Location and Remarks ECS Texas, LLP 2000.1.1.0 Milton E. Perez Duke Realty 08/02/2016 / 81 4000 psi 6710-A Sunny Project No. Client: Weather / Temp: Day/Date:* Design Strength: By: Water Added Concrete p. 84 Tem 3.00(P) % Air 4.50 Slump 4000 psi Report B to P min. Mix Strength: 503558 NEC Bethel Road and Freeport Parkway - TX 75019- 09:5010:0011:09 Concrete Summary Finish Truck Time Coppell, - Dallas County 09:3009:4010:41 Arrive Duke Realty 09:0009:2510:11 Batch e Tim Tohatsu * B to P - Batch to Placement time in minutes 1701 9.0 18.023.0 LMC CY Concrete Cum Approach from Bethel Road Project:Supplier: Mix Designation: Location: Contractor : 9.09.05.0 Truck 000000000000000063000491 Ticket No. Truck No. 000000005030 * Location: No. 789 :64584 WO Page 1 Location and Remarks ECS Texas, LLP 2000.1.1.0 Milton E. Perez Duke Realty 08/02/2016 / 81 3500 psi 6710-A Sunny Project No. Client: Weather / Temp: Day/Date:* Design Strength: By: Water Added Concrete p. 82 Tem 1.10(P) % Air 5.00 Slump 3500 psi Report B to P min. Mix Strength: 436352645361 NEC Bethel Road and Freeport Parkway - TX 75019- 09:4310:4810:5211:5011:5301:01 Concrete Summary Finish Truck Time Coppell, - Dallas County 09:3010:0010:2811:2511:2512:38 Arrive Duke Realty 09:0009:4510:0010:4611:0012:00 Batch e Tim Tohatsu * B to P - Batch to Placement time in minutes 1418 9.0 18.027.036.045.054.0 LMC CY Concrete Cum Project:Supplier: Mix Designation: Location: Contractor : Building Pad Leave Out 9.09.09.09.09.09.0 Truck 630004900000000000000000000000000000000000000000 Ticket No. Truck No. 151200000000000000000000 * Location: No. 123456