Loading...
Duke Freeport-LR160809 (4) ECS Texas, LLP 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 LETTER OF TRANSMITTAL (972) 392-3222 \[Phone\] (214) 483-9684 \[Fax\] Texas Registered Engineering Firm# F-8461 August 9, 2016RE:Tohatsu Duke RealtyECS Job #19:6710-A South/West Region 14241 North Dallas Parkway, Suite 1000Permits: Dallas, TX 75254Location:NEC Bethel Road and Freeport Parkway Coppell, TX ATTN:Mr. Sean Jeanes, P.E. LEED AP We are enclosing: XMaterials Engineering Division Reports XFor your use XAs requested CC:Duke Realty - Todd Henry Duke Realty - Glen Stevenson Pacheco Koch Consulting Engineers - Clayton J. Strolle, LEED AP City of Coppell - Matt Mabry Weir Bros., Inc. - Mike Weir Meinhardt & Associates - David Meinhardt LJB inc - Jim Lintz ENCL: Field Report # 9008/03/2016Ramp Walls Mark R. Zortman, P.E. Timothy Tarbutton AUG 9 2016 Principal Engineer Project Manager This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS. 1000.1 ECS Texas, LLP 3033 KellwayDrive, Suite 110 Carrollton, TX 75006 FIELD REPORT (972) 392-3222 \[Phone\] (214) 483-9684 \[Fax\] 19:6710-A Project No. 90 Report No. TohatsuWednesday 08/03/2016 ProjectDay & Date 100°/ Sunny Weather Coppell, TX Location 4.75 On-Site Time Duke Realty - Sean Jeanes, P.E. LEED AP Client 0.50 Lab Time Duke Realty - Sean Jeanes, P.E. LEED AP Contractor 0.75 Travel Time* 6.00 Total 0.00 Re Obs.Time Ramp Walls Remarks Time ofArrivalDeparture 55.00 Trip Charges*Tolls/Parking*Mileage* 11:30A04:15P Chargeable Items * Travel time and mileage will be billed in accordance with the contract. Summaryof Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. The undersigned arrived on site, as requested, to observe the placement of 19 cubic yards of 3000 psi concrete for Ramp Walls. The required test limits were determined to be a slump of 3-5 inches, air content of 0-3 %, batch to placement time of 90 minutes, and concrete temperature range of 50-95 degrees Fahrenheit. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, air content, and batch to placement time. One set of five laboratorycured concrete cylinders were cast for compressive strength testing in our laboratory. Kanku Tshiswaka1800 By 1089604 :64657 WO Page 1 Location and Remarks ECS Texas, LLP 2000.1.1.0 Kanku Tshiswaka Duke Realty / 100 08/03/2016 3000 psi 6710-A Sunny Project No. Client: Weather / Temp: Day/Date:* Design Strength: By: Water Added Concrete p. 89 Tem 1.00(P) % Air 5.00 Slump 3000 psi Report B to P min. Mix Strength: 7384 NEC Bethel Road and Freeport Parkway - TX 75019- 01:3003:55 Concrete Summary Finish Truck Time Coppell, - Dallas County 01:1303:33 Arrive Duke Realty 12:1702:31 Batch e Tim Tohatsu * B to P - Batch to Placement time in minutes 5150 9.0 19.0 LMC CY Concrete Cum Project:Supplier: Mix Designation: Location: Contractor : 9.0 10.0 Truck 6310448564412502 alls Ticket No. Ramp W Truck No. 03081421 * Location: No. 12