Loading...
ST0301C- LR160506G1 • GEOTECHNICAL ENGINEERING • ENVIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS TESTING 1111 -Im 11 11111111111 N M1, lei 0 1111111111111111117 � ip, I 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352-5433 • Fax (214) 352-6972 Report Date: May 13, 2016 Date Concrete Placed: May 6, 2016 Standard 6"x12" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 81 Contractor: Tiseo Paving Project No.: 215-140 Concrete Supplier and Plant: Tiseo Paving Location of Placement: Pavement, W. Bound Bethel Rd. MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 2596 Mach\H Time Sample Batched: 8:03 AM Cement: 6,0 Sack Time Sampled: 8:50 AM Remarks Sample Location: intersection of Bethel Rd. and E. Fly Ash: 5/9/16 Hearthstone Dr., Station 28+20 Coarse Aggregate: Truck / Ticket No: */4692 Intermediate Aggregate: Temperature: 5/13/16 105,300 Ambient Range: 70 OF Fine Aggregate: Concrete Range: 82 OF Admixtures: Slump Range (inches): 6.00 Weather Conditions: Cloudy 28 Time Started: 6:30 AM 2 Time Completed: 4:30 PM Added Water: 0 Gal Sample Air Content 3.0 Total Cubic Yards Placed: 40.0 Re uired Strength (Lbs./sq.in.): 3,600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks BCR 348 3 5/9/16 85,800 3,040 BCR 349 7 5/13/16 105,300 3,720 BCR 350 6.0 28 6/3/16 BCR 351 28 6/3/16 BCR 352 H H Test Methods Utilized Fracture Regular Cylinders Made By: JP/HP ASTM C -31, C-39, C -143 (Unless Noted Otherwise) *Plant number and truck number are not available cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell6koppellrx.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunas((cop Mr. George Marshall - City of Coppell via Email: gmarshallAcoppelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudilI0,)tiseonqying1cm GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested mid/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. • GEOTECHNICAL ENGINEERING • ENVIRONMENTAL CONSULTING • CONSTRUCTION MATERIALS TESTING GEE Consultants, 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352 -5433 * Fax (214) 352 -6972 Report Date: May 13, 2016 Date Concrete Placed: May 6, 2016 Standard 6 "xl2" Cylinders Client: City of Coppell Cylinder Cross - sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 82 Contractor: Tiseo Paving Project No.: 215 -140 Concrete Supplier and Plant: Tiseo Paving Location of Placement: Pavement W. Bound Lane Bethel Rd. MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs /CuYd) Mix Number: 2596 Mach \H Time Sample Batched: 11:08 AM Cement: 6.0 Sack Time Sampled: 11:45 AM Remarks Sample Location: Bethel Rd., W. Bound Lane, Fly Ash: Y 5/9/16 Station 26 +25 Coarse Aggregate: Truck / Ticket No: 162/4705 Intermediate Aggregate: Temperature: 5/13/16 135,020 Ambient Range: 81 of Fine Aggregate: Concrete Range: 90 F Admixtures: Slump Range (inches): 2.5 1 Weather Conditions: Cloudy 28 Time Started: 6:30 AM 2 Time Completed: 4:30 PM Added Water: 0 Gal Sample Air Content ( %): 3.5 Total Cubic Yards Placed: 136.0 Test Methods Utilized Reauired Strength (Lbs. /sq.in.): 3,600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs. /Sq.ln.) Remarks BCR 353 3 5/9/16 111,900 3,960 BCR 354 7 5/13/16 135,020 4,780 BCR 355 2.5 28 6/3/16 BCR 356 28 6/3/16 BCR 357 H I H Test Methods Utilized Fracture Regular Cylinders Made By: JP ASTM C -31, C -39, C -143 (Unless Noted Otherwise) *Plant number and truck number are not available cc: Mr. Rick Odell - City of Coppell via E -mail: Rodell a,coppelltx.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunas(cr),coP2gIItx.gov Mr. George Marshall - City of Coppell via Email: gmarshall cr,coppelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill(a )tiseopaving.com GEE Consultants, Inc. TBPE Firm: F -3212 Reviewed by: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G1 • GEOTECHNICAL ENGINEERING E ' • ENVIRONMENTAL CONSULTING E I* CONSTRUCTION MATERIALS TESTING GEE Consultants, 10046 Monroe Drive • Dallas, Texas 75229 • (214) 352 -5433 M Fax (214) 352 -6972 Report Date: May 13, 2016 Date Concrete Placed: May 6, 2016 Standard 6 "x12° Cylinders Client: City of Coppell Cylinder Cross - sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 83 Contractor: Tiseo Paving Project No.: 215 -140 Concrete Supplier and Plant: Tiseo Paving Location of Placement: Pavement W. Bound Lane Bethel Rd. MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs /CuYd) Mix Number: 2596 Mach\FI Time Sample Batched: 12:38 AM Cement: 6.0 Sack Time Sampled: 1:05 PM Remarks Sample Location: Bethel Rd. West Bound Lane, Fly Ash: 5/9/16 Station 23 +50 Coarse Aggregate: Truck / Ticket No: * /4718 Intermediate Aggregate: Temperature: 5/13/16 129,260 Ambient Range: 72 OF Fine Aggregate: Concrete Range: 88 F Admixtures: Slump Range (inches): 1.75 1 Weather Conditions: Partially Cloudy 28 Time Started: 6:30 AM 2 Time Completed: 4:30 PM Added Water: 0 Gal Sample Air Content ( %): Not Tested Total Cubic Yards Placed: 240.0 Test Methods Utilized Required Strength (Lbs. /sa.in.): 3,600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs. /Sq.ln.) Remarks BCR 358 3 5/9/16 103,620 3,670 BCR 359 7 5/13/16 129,260 4,570 BCR 360 1.75 28 6/3/16 BCR 361 28 6/3/16 BCR 362 H H Test Methods Utilized Fracture Regular Cylinders Made By: JP ASTM C -31, C -39, C -143 (Unless Noted Otherwise) *Plant number and truck number are not available cc: Mr. Rick Odell - City of Coppell via E -mail: Rodell(a),coppelltx.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunas(a coPPelltx.gov Mr. George Marshall - City of Coppell via Email: gmarshall(a)coypelltx.Pov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill@tiseopaving.com Inc. 7BPE Firm: F -32: All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of out name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G1 • GEOTECHNICAL ENGINEERING E I • ENVIRONMENTAL CONSULTING E I* CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc, 10046 Monroe Drive Dallas, Texas 75229 (214) 352-5433 • Fax (214) 352-6972 Report Date: May 13, 2016 Date Concrete Placed: May 6, 2016 Standard 6"xl2" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 84 Contractor: Tiseo Paving Project No.: 215-140 Concrete Supplier and Plant: Tiseo Paving Location of Placement Pavement, W. Bound Lane, Bethel Rd. MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 2596 Mach\li Time Sample Batched: 2:02 AM Cement: 6.0 Sack Time Sampled: Sample Location: 2:45 PM Bethel Rd., W. Bound Lane, Fly Ash: BCR 363 Station 19+70 Coarse Aggregate: Truck / Ticket No: */4705 Intermediate Aggregate: Temperature: Ambient Range: 84 OF Fine Aggregate: Concrete Range: 86 OF Admixtures: Slump Range (inches): 2.0 BCR 365 Weather Conditions: Partially Cloudy 6/3/16 Time Started: 6:30 AM 2 Time Completed: 4:30 PM Added Water: 0 Gal Sample Air Content Not Tested Total Cubic Yards Placed: 336.0 Re aired Strength (Lbs./sq.in.): 3,600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks BCR 363 3 5/9/16 101,660 3,600 BCR 364 7 5/13/16 124,680 4,410 BCR 365 2.0 28 6/3/16 BCR 366 28 6/3/16 BCR 367 H H Test Methods Utilized Fracture Regular Cylinders Made By: JP I ASTMC-31,C-39,C-143 (Unless Noted otherwise) - *Plant number and truck number are not available cc: Mr. Rick Odell - City of Coppell via E-mail: Roden (&,coppelltx. Mr. Michelle Matunas - City of Coppell via Email: mmatunasC&-cop elltx.goy Mr. George Marshall - City of Coppell via Email: conyelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill(iiaiseOrlaving.com GEE Firm- F-32 All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.