This a conversation between the City and the contractor. Thank you
Marcus Marion
MMarion@coppelltx.gov
469.576.7707
Begin forwarded message:
From:
Drew Shipman <Drew@durablespecialties.com>
Date:
August 11, 2016 at 6:57:26 AM CDT
To:
George Marshall <GMarshall@coppelltx.gov>
Cc:
Marcus Marion <MMarion@coppelltx.gov>, Patrick Bryan
<Patrick@durablespecialties.com>, Johnny Aaron <Johnny@durablespecialties.com>, Troy Butt
<Troy@durablespecialties.com>, Jason Pruett <jason@durablespecialties.com>, Cody Wildoner
<CWildoner@coppelltx.gov>, Michael Arellano <MArellano@coppelltx.gov>
Subject:RE: 540.081116 sched PARKWAY BLVD. @ COWBOY DR.
George,
Good morning.
Per the plans, the NB right turn is directly wired to the WB left turn Phase 7 field terminals.
If the WB left turn Phase 7 green arrow or yellow arrow LED’s ever burn out then the NB right
turn indications will satisfy the load requirements for the MMU therefore the signal will not
enter the flash state.
Please revisit this scenario and let us know if you would prefer to terminate the WB right turn
arrows to a separate Overlap and mark up the plans accordingly.
Thanks.