Loading...
TR1402-CS160812 (2) Halie Hernandez From:Marcus Marion Sent:Friday, August 12, 2016 3:56 PM To:Halie Hernandez Subject:Cowboy and Parkway BLVD This a conversation between the City and the contractor. Thank you Marcus Marion MMarion@coppelltx.gov 469.576.7707 Begin forwarded message: From: Drew Shipman <Drew@durablespecialties.com> Date: August 11, 2016 at 6:57:26 AM CDT To: George Marshall <GMarshall@coppelltx.gov> Cc: Marcus Marion <MMarion@coppelltx.gov>, Patrick Bryan <Patrick@durablespecialties.com>, Johnny Aaron <Johnny@durablespecialties.com>, Troy Butt <Troy@durablespecialties.com>, Jason Pruett <jason@durablespecialties.com>, Cody Wildoner <CWildoner@coppelltx.gov>, Michael Arellano <MArellano@coppelltx.gov> Subject:RE: 540.081116 sched PARKWAY BLVD. @ COWBOY DR. George, Good morning. Per the plans, the NB right turn is directly wired to the WB left turn Phase 7 field terminals. If the WB left turn Phase 7 green arrow or yellow arrow LED’s ever burn out then the NB right turn indications will satisfy the load requirements for the MMU therefore the signal will not enter the flash state. Please revisit this scenario and let us know if you would prefer to terminate the WB right turn arrows to a separate Overlap and mark up the plans accordingly. Thanks. 1