Loading...
Duke Freeport-LR160816 (2) ECS Texas, LLP 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 LETTER OF TRANSMITTAL (972) 392-3222 \[Phone\] (214) 483-9684 \[Fax\] Texas Registered Engineering Firm# F-8461 August 16, 2016RE:Tohatsu Duke RealtyECS Job #19:6710-A South/West Region 14241 North Dallas Parkway, Suite 1000Permits: Dallas, TX 75254Location:NEC Bethel Road and Freeport Parkway Coppell, TX ATTN:Mr. Sean Jeanes, P.E. LEED AP We are enclosing: XMaterials Engineering Division Reports XFor your use XAs requested CC:Duke Realty - Todd Henry Duke Realty - Glen Stevenson Pacheco Koch Consulting Engineers - Clayton J. Strolle, LEED AP City of Coppell - Matt Mabry Weir Bros., Inc. - Mike Weir Meinhardt & Associates - David Meinhardt LJB inc - Jim Lintz ENCL: Field Report # 9308/11/2016Inlet Storm ST-1A Mark R. Zortman, P.E. Timothy Tarbutton AUG 16 2016 Principal Engineer Project Manager This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS. 1000.1 ECS Texas, LLP 3033 KellwayDrive, Suite 110 Carrollton, TX 75006 FIELD REPORT (972) 392-3222 \[Phone\] (214) 483-9684 \[Fax\] 19:6710-A Project No. 93 Report No. TohatsuThursday 08/11/2016 ProjectDay & Date 90°/ Sunny Weather Coppell, TX Location 2.50 On-Site Time Duke Realty - Sean Jeanes, P.E. LEED AP Client 0.00 Lab Time Duke Realty - Sean Jeanes, P.E. LEED AP Contractor 1.17 Travel Time* 3.67 Total 0.00 Re Obs.Time Inlet Storm ST-1A Remarks Time ofArrivalDeparture 55.00$5.00 Trip Charges*Tolls/Parking*Mileage* 07:00A09:30A Chargeable Items * Travel time and mileage will be billed in accordance with the contract. Summaryof Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. The undersigned arrived on site, as requested, to observe the placement of 1 cubic yards of 4000 psi concrete for area inlet at Storm Line ST-1A. The required test limits were determined to be a slump of 3-5 inches, air content of 3-6 %, batch to placement time of 90 minutes, and concrete temperature range of 50-100 degrees Fahrenheit. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, air content, and batch to placement time. One set of five laboratorycured concrete cylinders were cast for compressive strength testing in our laboratory. Jean Habyarimana1800 By 1090147 :65004 WO Page 1 Location and Remarks ECS Texas, LLP 2000.1.1.0 arimana Duke Realty 08/11/2016 / 90 Jean Haby 4000 psi 6710-A Sunny Project No. Client: Weather / Temp: Day/Date:* Design Strength: By: Water Added Concrete p. 95 Tem 3.20(P) % Air 3.75 Slump 4000 psi Report B to P min. Mix Strength: 72 NEC Bethel Road and Freeport Parkway - TX 75019- 09:00 Concrete Summary Finish Truck Time Coppell, - Dallas County 08:26 Arrive Redi-Mix Concrete Duke Realty 07:48 Batch e Tim 10L11524 Tohatsu * B to P - Batch to Placement time in minutes 1.0 CY Concrete Cum Area inlet at Storm Line ST-1A Project:Supplier: Mix Designation: Location: Contractor : 1.0 Truck 25375511 Ticket No. Truck No. 1302 * Location: No. 1