Loading...
ST0301C-LR160815G1 9 GEOTECHNICAL ENGINEERING E I* ENVIRONMENTAL CONSULTING E I* CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive a Dallas, Texas 75229 (214) 352-5433 • Fax (214) 352-6972 Report Date: August 15, 2016 Date Concrete Placed: August 4, 2016 Standard 6"xl2" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 114 Contractor: Tiseo Paving Project No.: 215-140 Concrete supplier and Plant: Tiseo Paving Location of Placement: Bethel Rd. W. Bound Lane, Paving MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 2596 M/H Time Sample Batched: 7:43 AM Cement: 6 Sack Time Sampled: 8:25 AM Remarks Sample Location: Station 35+10, towards Curb at N. Fly Ash: 8/8/16 Side Coarse Aggregate: Truck / Ticket No: */28152 Intermediate Aggregate: Temperature: 8/11/16 95,540 Ambient Range: 84 OF Fine Aggregate: Concrete Range: 95 OF Admixtures: Slump Range (inches): 4.75 1 Weather Conditions: Clear 2 Time Started: 6:15 AM Time Completed: 3:15 PM Added Water: 5 Gal Sample Air Content (%): 5.0 Total Cubic Yards Placed: 24.0 Test Methods Utilized R uired Strength (Lbs./sq.m.): 3,600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks BCR 496 4 8/8/16 89,920 3,180 BCR 497 7 8/11/16 95,540 3,380 BCR 498 4.75 28 9/1/16 BCR 499 28 9/1/16 BCR 500 H H Test Methods Utilized Fracture Regular Cylinders Made By: RB I ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: -Plant and Truck Number are Not Available on the Ticket cc: Mr. Rick Odell - City of Coppell via E-mail: RodeIl(a),covPeIItx.g_o Mr. Michelle Matunas - City of Coppell via Email: mmatunas(ikoopelltx.go Mr. George Marshall - City of Coppell via Email: wriarshall(a),coppeffix.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudillAtiscopaving.com GEE Consultants, Inc. TBPE Firm: F-3212 Reviewed by: All letters and reports are for the exclusive use a£ the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G1 * GEOTECHNICAL ENGINEERING E I - ENVIRONMENTAL CONSULTING CONSTRUCTION MATERIALS TESTING GEE Consultants, Inc. 10046 Monroe Drive '11 Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972 Report Date: August 15, 2016 Date Concrete Placed: August 4, 2016 Standard 6"x12" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28.27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 115 Contractor: Tiseo Paving Project No.: 215-140 Concrete Supplier and Plant: Tiseo Paving Location of Placement: Bethel Rd. W. Bound Lane, Paving MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 2596 M/H Time Sample Batched: 9:25 AM Cement: 6 Sack Time Sampled: 10:05 AM Remarks Sample Location: Station 32+20, towards Curb at N. Fly Ash: 8/8/16 Side Coarse Aggregate: Truck / Ticket No: */28164 Intermediate Aggregate: Temperature: 8/11/16 92,800 Ambient Range: 93 OF Fine Aggregate: Concrete Range: 91 OF Admixtures: Slump Range (inches): 5.5 1 Weather Conditions: Clear 2 Time Started: 6:15 AM Time Completed: 3:15 PM Added Water: 0 Gal Sample Air Content (%): 4.6 Total Cubic Yards Placed: 120.0 Test Methods Utilized Required Strength (Lbs./sq.in.): 3,600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks BCR 501 4 8/8/16 86,368 3,060 BCR 502 7 8/11/16 92,800 3,280 BCR 503 5.5 28 9/1/16 BCR 504 28 9/1/16 BCR 505 H R Test Methods Utilized Fracture Regular Cylinders Made By: RB I ASTM C-31, C-39, C-143 (Unless Noted Otherwise) — Remarks and/or Distribution: -Plant and Truck Number are Not Available on the Ticket cc: Mr. Rick Odell - City of Coppell via E-mail: RodeIl(d),coVl)elltx.gov Mr. Michelle Matunas - City of Coppell via Email: mmatunas(&,coppelltx.go Mr. George Marshall - City of Coppell via Email: gmarshallncoppelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill(&,tiseopaving.com TBPE Firm: F-3212 All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants. Inc, The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products. G1 * GEOTECHNICAL ENGINEERING .L — E ENVIRONMENTAL CONSULTING GEE Consultants, Inc. E-1 * CONSTRUCTION MATERIALS TESTING E 10046 Monroe Drive 10 Dallas, Texas 75229 0 (214) 352-5433 0 Fax (214) 352-6972 rff Wilffs ill !,I 'I, 7LIffe-11re =1L Report Date: August 15, 2016 Date Concrete Placed: August 4, 2016 Standard 6"xl2" Cylinders Client: City of Coppell Cylinder Cross-sectional Area: 28,27 Square Inches Project: Bethel & Coppell Road Concrete Report No.: 116 Contractor: Tiseo Paving Project No.: 215-140 Concrete Supplier and Plant: Tiseo Paving Location of Placement: Bethel Rd. W. Bound Lane, Paving MATERIALS Source / SSD Batch Wts. OBSERVATION DATA Description (Lbs/CuYd) Mix Number: 2596 M/H Time Sample Batched: 12:17 PM Cement: 6 Sack Time Sampled: 1:05 PM Remarks Sample Location: Station 29+05 Fly Ash: Truck / Ticket No: */28177 Coarse Aggregate: Temperature: BCR 507 Intermediate Aggregate: Ambient Range: 99 OF 89,780 Concrete Range: 96 OF Fine Aggregate: Slump Range (inches): 5.0 Admixtures: Weather Conditions: Clear I Time Started: 6:15 AM 2 Time Completed: 3:15 PM Sample Air Content (%): 3.7 Added Water: 0 Gal Total Cubic Yards Placed: 224.0 Renuired Strength (Lbs./sa.in.): 3.600 Specimen Number Measured Slump (in.) Age (Days) Date Tested Total Load (Lbs.) Compressive Strength (Lbs./Sq.1n.) Remarks BCR 506 4 8/8/16 71,420 2,530 BCR 507 7 8/11/16 89,780 3,180 BCR 508 5.0 28 9/1/16 BCR 509 28 9/1/16 BCR 510 H H Test Methods Utilized Fracture Regular Cylinders Made By: RB I ASTM C-31, C-39, C-143 (Unless Noted Otherwise) Remarks and/or Distribution: -Plant and Truck Number are Not Available on the Ticket cc: Mr. Rick Odell - City of Coppell via E-mail: Rodell(a_),co-ppelltx.go Mr. Michelle Matunas - City of Coppell via Email: mmatunas(a),coppelltx.Rov Mr. George Marshall - City of Coppell via Email: pmarshall(dcoppelltx.gov Mr. Robert Caudill - Tiseo Paving via Email: rcaudill(a)tiseopaving.com 14M Inc. TBPE Firm: Reviewed All letters and reports are for the exclusive use of the client to whom they are addressed and shall not be reproduced without the full approval of GEE Consultants, Inc. The use of our name must receive our prior written approval. Our letters and reports apply only to the sample tested and/or observed and are not necessarily indicative of the quantities of apparently identical or similar products.