Loading...
CRDC1401-CS160826 Halie Hernandez From:Marcus Marion Sent:Friday, August 26, 2016 9:15 AM To:Halie Hernandez Subject:DentonTap/Sandy Lake Attachments:image002.png; image004.png; image006.png; image008.png This is a conversation between the electrician and the engineer New Electrical Service-West Sandy Lake Illumination Marcus Marion MMarion@coppelltx.gov 469.576.7707 Begin forwarded message: From: Guy Pokhrel <gpokhrel@tnpinc.com> Date: August 25, 2016 at 7:43:49 PM CDT To: "edmond@atci-texas.com" <edmond@atci-texas.com>, Michael Beattie <michaelb@pavecon.com> Cc: George Marshall <GMarshall@coppelltx.gov>, Chris Schmitt <cschmitt@tnpinc.com>, Joe Madrid <jmadrid@tnpinc.com>, Marcus Marion <MMarion@coppelltx.gov> Subject: New Electrical Service-West Sandy Lake Illumination Edmond and Michael, After reviewing the illumination plans, there are no new electrical services proposed for illumination in west Sandy Lake Road. We are using existing conduits and services (service point E8 and E9) at the intersection of Royal Lane and N Coppell Road. Please review the plans and let us know if you have question. Thank you. The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. Guy Pokhrel, P.E., CFM Project Manager gpokhrel@tnpinc.com tnp | 17304 Preston Road | Suite 1340 | Dallas, Texas 75252 214.461.9867 main | 214.988.9923 direct | 405.334.1994 mobile 1