Loading...
Copperstone FS-CS 890406 (2)dP · Jer 'y Parch Consulting Engineers April 6~ %989 Mr. Russe/1 Doyle, P.E. City En~i ne e r City e~/ Coppeli CODeefl , Texas 75019 214/'462-0022 RE: JP No. 88009; Flood Plain Reclamation Study; West o~ Denton Tap Road; Parks of Coppell; Coppell, Texas Dear Russell: On February 21. 1989 our firm submitted three copies of a rep:orr entitled Flood Plain Reclamation Study on Cottonwood Branch and Denton_.Cree~k, Par_ks o_f__CoDp~l~,__Coppet!,__Texas to the City. Th~s report contained a description of proposed reclamation of ~lood plain land in the Parks of Coppell on Cottonwood Branch. ~ and~ Denton Creek west of Denton Tap Road. The report lnc~de~ hydraulic models, exhibits, and channel cress sec~ ions as documentation for our request to the City and to FEI,SA for a Conditional Letter of Map Revision. We requested that the City review the study and submit the study to FEMA with an endorsement of the project. I have received a letter from FEHA dated March 28, 1989 advis~n~ me that they are currently reviewing our study to determine- th, appropriate processing procedure. Thank you for expediEin~] ;h~ subnittal of this study to FEHA so that they may begin th--il On [larch 31, 1989 you provided me with a list of co:.m=nts fro, Mr. Rot Horrison. P. E. of Kimley-Horn and Associate, s, in,.., who reviewed our study for compliance with local req~ire:'ents o: b_half of the City. A copy of Hr. Morrison's letter to you , ~ March 28, 1989 is enclosed. Our responses to H~ . He~r'tson s comments are presented herein, however, I would first iik~ to present correspondence which established the basis for our hydraulic analysis. All seven comments listed in Mr. Morrison's letter refer to the current City flood plain ordinance number 87390. In October, 19~8~ upon our submittal of a flood plain reclamation study ~o permit filling in the flood plain for construction of Parkway Boulevard extending west of Denton Tap Road and the High School Access Road, you and I had a discussion and exchanj~d correspondence regarding the "Grandfathered" status of the flood plain property in the Parks of Coppell west of Denton Tap Road. ~20 ~Vestway Place, Suite 50] · Arlington, Texas 76018 · Metro [817J 461 2418 · {81/} 4a5 02~,9 Mr. Russell Doyle, P.E. JP No. 88009 April 6, 1989 Page 3 of 4 With specific regards to Comment No. 2, I agree that the minimum floor level should be set at base flood elevation <100-year flood level with existing development conditions) plus two feet. This will result in an added factor of safety and minimum floor levels will therefore exceed requirements stated in Ordinance No. ~. Since projects upstream and downstream of the Parks of Coppell area have already been developed, however, no further adjustments in computed flood levels are anticipated.-, In response to Comment I4o. 6, a letter is attached from the Corps 'of Engineers evidencing approved 404 Permit status of this project. in response to Comment No. 7, I will coordinate with you or your staff to seal copies of the report previously submitted to you. To the best of my knowledge, FEMA does not require an encine~r's seal on reports that are a part of Conditional Map Revision request. Finally, a general comment on page two in the last paragraph of Mr. Morrison's letter indicates that our report should address erosin, flood levels and other impacts for frequencies mentioned in the March 28, 1989 correspondence. As stated in our report, these impacts on Denton Creek are insignificant since in downstream reaches~ encroachments are in non-effective ~]ow areas. In upstream reaches where the north property line <of th~ Parks of Coppell lies in the creek, no flood plain encroachments are proposed. Therefore conditions in Denton Creek during 100-year flood and other frequencies ~are similar to current conditions. Please refer to Table 3 on Page i0 of our report. On Cottonwood Branch, bank protection is proposed in the vicinity of the Parkway Boulevard bridge. In other reaches, no alterations are proposed and velocities are very similar velocities in the existing channel. This is evidenc~:d comparision of channel velocities given in the first profil~ ~f ~he existin~ conditions model (See Page 19 - hods= CEX3) and the firs5 profile of the proposed condition model {See Pa~e 21 Hodei ! trust that the above will satisfactorily address the concerns listed in Mr. Morriscn's letter. If you concur that the r~su!ts of our study are in compliance with the requirements of thc City of Coppelt, please provide a letter to FEMA endorsing our request for a Conditional Letter of Map Revision for this project. Russell Doyle, No. 88009 you have any err~ parche please call- April ~, 1989 page 4 of 4 !p:ch cci KimleY_~orn Letter - 3~28~89 _ 1/18/$9 10114188 Letter from corPS of Engineers Letter from me to K. Doyle _ 10/7/88 Doyle to me Letter from K. _ 9/24/$7 Letter from FEMA to me - 6/21/88 Letter from oinn Letter from m% to ginn - 6~ineer - 5/2b/ Letter from m inn, city m,,~ Letter from ~ to Ginn - 5/3/ from . _ 4/14/~8 Lotto m M. Lame . of C°ppez Letter fr°[io 219 - CLtY Ordinance ' _ and AsSociateS - - ~mleY Horn ~ corporation Rot [4°rriS°n' pP~m/~Q Developmen~ ~,lr · chester, Mr · J aY w/encl ·