Loading...
Duke Freeport-LR160826Texas Registered Engineering Firm # F-8461 August 26, 2016 Duke Realty South/West Region 14241 North Dallas Parkway, Suite 1000 ATTN:Mr. Sean Jeanes, P.E. LEED AP Tohatsu Location: Permits: Dallas, TX 75254 19:6710-A NEC Bethel Road and Freeport Parkway Coppell, TX RE: ECS Job # 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] ECS Texas, LLP LETTER OF TRANSMITTAL CC:Duke Realty - Todd Henry Duke Realty - Glen Stevenson Pacheco Koch Consulting Engineers - Clayton J. Strolle, LEED AP City of Coppell - Matt Mabry Weir Bros., Inc. - Mike Weir Meinhardt & Associates - David Meinhardt LJB inc - Jim Lintz ENCL: We are enclosing: Materials Engineering Division Reports For your use As requested X X X Field Report # 103 08/25/2016 Pour Strip Comp Timothy TarbuttonMark R. Zortman, P.E. Principal Engineer Project ManagerAUG 25 2016 1000.1 This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS. Texas Registered Engineering Firm # F-8461 ECS Texas, LLP 19:6710-A 103 Tohatsu Thursday 08/25/2016 Project No. Report No. Day & DateProject 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] FIELD REPORT 3.75 The undersigned arrived on site, as requested, to observe the compaction of soils for inside the Building Pad, Pour Strip and Sidewalk. Utilizing the nuclear test method to check the compaction of soils; test results indicated that the compacted material, at the areas and elevations tested, met or exceeded the project requirements of 95% of the maximum dry density as obtained in our laboratory using the Standard Proctor Method (ASTM D698). Locations and elevations of all tests are based on stakeout provided by others. We cannot be responsible for structures located off of the observed engineered pad, misaligned utilities or stakeout errors causing uncontrolled fill to be placed in structural areas. 82°/ Sunny 55.00 2.25 0.50 0.00 09:15A 11:30A Pour Strip Comp Location Contractor On-Site Time Lab Time Client Coppell, TX Arrival Departure Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Duke Realty - Sean Jeanes, P.E. LEED AP Duke Realty - Sean Jeanes, P.E. LEED AP Trip Charges* Remarks Chargeable Items Weather Mileage* 1.00Travel Time* Total Time of Re Obs.Time * Travel time and mileage will be billed in accordance with the contract. Tolls/Parking* Sheikh T. NjieBy 1800 1092060 ECS TEXAS, LLP Test Method ASTM Nuclear Project No: Contractor: Project Name:Date: Client: Page 1 Technician: Nuclear Gauge No. Make Model Ser. No. Density Std Moisture Std 6710-A Tohatsu 08/25/16 Duke Realty Duke Realty Sheikh T. Njie 8943 Humboldt 5001-EZ 3311 338 Field Compaction Summary, ASTM Nuclear Texas Registered Engineering Firm # F-8461 Description Proctor Method Uncorrected Max. Density Uncorrected Opt. MCSample No. D4S-7 Recycled concrete Standard Proctor Method (ASTM D-698)115.40 15.20 D4S-8 Fat CLAY With Sand, Dark Brown ASTM D 698-12 Method A Standard 95.10 22.80 Test Data Test No. Test Mode Station / Location Probe Depth (in.) Lift / Elev Corrected Maximum Dry Density (pcf) Corrected Optimum Moisture Content (%) % Oversize Wet Density (pcf) Dry Density (pcf) Moisture Content (%) Percent Comp. (%)CommentsP / F Sample No. 1 DT 8 Pour Strip SG 0.00 115.40 15.20 127.5 110.3 15.6 95.6 PD4S-7 2 DT 8 Pour Strip SG 0.00 115.40 15.20 129.7 110.8 17.0 96.0 PD4S-7 3 DT 8 Sidewalk SG 0.00 95.10 22.80 115.1 90.7 26.9 95.4 PD4S-8 4 DT 8 Sidewalk SG 0.00 95.10 22.80 116.4 91.1 27.8 95.8 PD4S-8 Test Mode: DT = Direct Transmission BS = Back Scatter WO:65456