Loading...
DCT Fellowship-CS160830 (2) MEMORANDUM TO: Marcus Marion, Engineering Inspector FROM: Jeff Graham, Water Utilities Crewleader DATE: August 30, 2016 REF: 1204 W Bethel Rd Punch List 1.Northeast on Creekview: need 24 x 24 concrete pad around MLV; mark and paint curb for MLV; paint MLV lid blue; straighten valve stack. 2.Mark and paint WD and WI on curb; need valve stack for curb stop; uncover lower fittings in domestic can for inspection; relocate irrigation can over irrigation DC. 3.Northeast FH: move ballard pole (too close to hydrant); mark and paint FHV and MLV on curb and lids. 4.Northwest FH: mark and paint lids and curb for MLV and FHV; weep holes are not draining. 5.West FH: mark and paint MLV and FHV; raise both valve stacks to grade. 6.Southwest FH: mark and paint FHV and MLV on curb. 7.Southeast FH: mark and paint FHV and MLV on curb. 8.Fire vault: mark and paint MLV. Call 972-462-5150 to schedule Public Works to check punch list upon completion.