REPORT OF CONCRETE MIX INSPECTION
Report Da~e: December 4, 1998 Date Concrete Placed: November 25. 1998 Standard 6'x12"
Ch°m: North American Properties-SW Area 2,~.27 Square Inches
Project: Eckerds - Coppell Concrete Report No.:
Contractor: P roi* :t No.: 298-0412
Concrete Supplier and Plant: TXI Plant #41
Locanon of Placement: Piers
MATERIALS so~e. ~s~, ~,,,, w~. INSPECTION DATA
D~scr~p~.m , Lbsi('uYd~
Mix Number: .t7 Time Sample Batched: I ::31 am
Cement: 5.5 Sacks Time Sampled: 12:10 pnt
Fly Ash: Sample Locauon: '.-i: L-6:
Coarse Aggregate: l" Truck/Ticket No: 542.' l 189936
Imermediam Aggregate: Temperature:
Ambmnt Rane~. ~6°F
Fine Aggregate: Concrete Range: 7'.. F
Admixtures: Slump Range i~nches}: :,~"
I Weather Conditions: C~:ar
Time Started: 57:30 am
- Time Completed: Ill :30 pm
Added Water: 0 Gallons Sample Air Content ! % ): 1.5 %
Total Cubic Yards Placed: 10
Required Strength tLbs.-sq.m. }: 3.000
ECK 1 7 12/02/98 104.980 3.710
ECK 2 28 12/23/98
2V2"
ECK 3 28 12/23/98 :
ECK 4 H HOLD
Test Metho~ UtiiLzed Fracture Regular
.'xSTM C-31.C-39.C-i43 ,L'llles~, Nome OtBerwlsel Cylinders Made By: AA
Remarks and/or Distribution:
cc: Mr. John Maggiore - North American Properties -SW
Mr. Lance Lilly - Richmond Group Architecture & Planning
Mr. Gary Stokes - C.A. Walker Construction
Mr. Lee Stone - City of Coppell
Mr. Larry Davis - City of Coppell
~]l Conm~taat~, l. ac. aerie.ed ~', ~*~.~._._.:__ . __-._ __
All letters and reports are for the exclusive 'J-qe of ~he client to whom they are addressed and shall nm be repreduc~la~,itheutl ~[he full approval o, GEE Co., dltaru3 Inc. The use v; o{1~ ~ame taus[ receive