Loading...
Duke Freeport-LR160901 (2)LETTER OF TRANSMITTAL TO: ATTN: JOB NO.: DATE: RE: PERMIT #: LOCATION: We are enclosing: Attached Materials Engineering Division Concrete Reports:As Requested CC: By: For Your Use 09/01/2016 Tohatsu NEC Bethel Road and Freeport Parkway, Coppell, TX 006710A Mr. Sean Jeanes, P.E. LEED AP Duke Realty South/W est Region 14241 North Dallas Parkway, Suite 1000 Dallas, TX 75254 Duke Realty - Todd Henry Duke Realty - Glen Stevenson Mark R. Zortman, P.E. Principal Engineer Pacheco Koch Consulting Engineers - Clayton J. Strolle, City of Coppell - Matt Mabry Weir Bros., Inc. - Mike W eir Meinhardt & Associates - David Meinhardt LJB inc - Jim Lintz Timothy Tarbutton Project Manager 68 CONCRETE, GROUT, AND MORTAR TESTS3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] X X X X Dallas County AUG 31 2016 ECS Texas, LLP Texas Registered Engineering Firm # F-8461 This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS. Texas Registered Engineering Firm # F-8461 3000 psiProject: Location:Report No.: Design Strength: Cast Date: Tohatsu NEC Bethel Road and Freeport Parkway, Coppell, TX 68 08/03/2016 6710-AProject : Concrete Cylinders Strength Report Set Designation:A 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] ECS Texas, LLP Owner: Struc. Eng.: Client: Gen. Contr.: Conc. Contr.: Placement Location: Concrete Supplier:Truck No: Mix Designation: Ticket No: Mix Strength:Batch Time: Arch.: Duke Realty - Sean Jeanes, P.E. LEED Meinhardt & Associates - David Meinhardt LJB inc - Jim Lintz Duke Realty - Glen Stevenson Ramp W alls LMC 0308 63104485 5150 3000 psi 12:17PM 0Added W ater: 100º F Air Content:Temperature - Air:Concrete: Time Sampled:Slump: Sample No Test Date Test Age Type Cure Breaking Load,lbs Compr. Str.,psi Brk Type Review by FIELD TEST DATA:Kanku Tshiswaka 01:23PM 5.00 in. 1.00 % (P) Tested by: 89º F Average Measured Diameter in. Avg. Measured Cross-Sectional Area in.-sq Cap Type 26603360013957108/10/2016 7 Lab 4.01 12.62 3 TT02U 35404471713957208/31/2016 28 Lab 4.01 12.62 3 TT02U 37104661613957308/31/2016 28 Lab 4.00 12.56 3 TT02U 37304715113957408/31/2016 28 Lab 4.01 12.62 3 TT02U 139575 09/28/2016 56 Lab FIELD CURING CONDITIONS: Curing Box Insulated Heated Cooled Caps Remarks: Final Review By: X Sampling in accordance with (iaw) ASTM C172, except that samples may have been taken from the beginning of the load after a minimum discharge of approximately one cubic yard. Cylinder molding and laboratory curing iaw ASTM C31, compressive strength test and break type iaw ASTM C39, slump iaw C143, air content iaw ASTM C173 (V) or C231 (P), temperature iaw ASTM C1064, and unit weight iaw ASTM C138. Cylinders denoted with Cap Type U are tested using unbonded caps iaw ASTM C1231, cylinders denoted with Cap Type B are tested using bonded caps iaw ASTM C617. Break Types are classified as: Type 1, 2, 3, 4, 5, or 6 iaw C39. No Curing BoxX Ice Other Print Date:09/01/2016 TT02 BR01