Eckerd's-LR 981204 (2) G · GEOTECHNICAL ENGINEr.,.,NG
GEE Consultants,
Inc.
E · CONSTRUCTION MATERIALS TESTING
10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972
REINFORCING STEEL PLACEMENT
Report Date: December 4. 1998 Test Date: December 1. 1998
Client: North American Properties-SW General Report No.: !
Project Eckerds - Coppell. Texas Project No.: 298-04!2
Identification Reinforcing Steel Inspection
Method of Test Visual Inspection
Page ~ of 1
Results
On December I. 1998, reintbrcing steel was inspected at the following location:
Piers: L-2.6: L-4: C.7-1: B-l: B-3.3; B-6.5: B-7.5: B-9:D-9
There were no discrepancies.
Tech: HG
Mr. John Maggmre - North American Propert~es-SW
Mr. Lance Littly - Richmond Group
Mr. GaD' Stokes -C.A. Walker Construction
Mr. Lee Stone - Cit3' of Coppell
Mr. Larry. Davis - City. of Coppell