Loading...
Eckerd's-LR 981204 (2) G · GEOTECHNICAL ENGINEr.,.,NG GEE Consultants, Inc. E · CONSTRUCTION MATERIALS TESTING 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 · Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: December 4. 1998 Test Date: December 1. 1998 Client: North American Properties-SW General Report No.: ! Project Eckerds - Coppell. Texas Project No.: 298-04!2 Identification Reinforcing Steel Inspection Method of Test Visual Inspection Page ~ of 1 Results On December I. 1998, reintbrcing steel was inspected at the following location: Piers: L-2.6: L-4: C.7-1: B-l: B-3.3; B-6.5: B-7.5: B-9:D-9 There were no discrepancies. Tech: HG Mr. John Maggmre - North American Propert~es-SW Mr. Lance Littly - Richmond Group Mr. GaD' Stokes -C.A. Walker Construction Mr. Lee Stone - Cit3' of Coppell Mr. Larry. Davis - City. of Coppell