Loading...
Duke Freeport-LR160831 (3)Texas Registered Engineering Firm # F-8461 August 31, 2016 Duke Realty South/West Region 14241 North Dallas Parkway, Suite 1000 ATTN:Mr. Sean Jeanes, P.E. LEED AP Tohatsu Location: Permits: Dallas, TX 75254 19:6710-A NEC Bethel Road and Freeport Parkway Coppell, TX RE: ECS Job # 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] ECS Texas, LLP LETTER OF TRANSMITTAL CC:Duke Realty - Todd Henry Duke Realty - Glen Stevenson Pacheco Koch Consulting Engineers - Clayton J. Strolle, LEED AP City of Coppell - Matt Mabry Weir Bros., Inc. - Mike Weir Meinhardt & Associates - David Meinhardt LJB inc - Jim Lintz ENCL: We are enclosing: Materials Engineering Division Reports For your use As requested X X X Field Report # 104 08/27/2016 Compaction, Concrete Timothy TarbuttonMark R. Zortman, P.E. Principal Engineer Project ManagerAUG 31 2016 1000.1 This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS. Texas Registered Engineering Firm # F-8461 ECS Texas, LLP 19:6710-A 104 Tohatsu Saturday 08/27/2016 Project No. Report No. Day & DateProject 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] FIELD REPORT 7.75 The undersigned arrived on site, as requested, to observe: 1: The compaction of soils for Sidewalk and Transformer Pad. Utilizing the nuclear test method to check the compaction of soils; test results indicated that the compacted material, at the areas and elevations tested, met or exceeded the project requirements of 95% of the maximum dry density and moisture content above OMC as obtained in our laboratory using the ASTM D 698-12 Method A Standard. Locations and elevations of all tests are based on stakeout provided by others. We cannot be responsible for structures located off of the observed engineered pad, misaligned utilities or stakeout errors causing uncontrolled fill to be placed in structural areas. 2: The placement of 123 cubic yards of 3600 psi concrete for Pavement. 3: The placement of 19 cubic yards of 3000 psi concrete for Sidewalk. The required test limits were determined to be a slump of 3-5 inches, air content of 3-6 %, batch to placement time of 90 minutes, and concrete temperature range of 50-95 degrees Fahrenheit. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, air content, and batch to placement time. Two sets of five laboratory cured concrete cylinders were cast for compressive strength testing in our laboratory. 89°/ Sunny 55.00 6.25 0.50 0.00 07:45A 02:00P Compaction, Concrete Location Contractor On-Site Time Lab Time Client Coppell, TX Arrival Departure Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Duke Realty - Sean Jeanes, P.E. LEED AP Duke Realty - Sean Jeanes, P.E. LEED AP Trip Charges* Remarks Chargeable Items Weather Mileage* 1.00Travel Time* Total Time of Re Obs.Time * Travel time and mileage will be billed in accordance with the contract. Tolls/Parking* Edward SesayBy 1800 1092303 ECS TEXAS, LLP Test Method ASTM Nuclear Project No: Contractor: Project Name:Date: Client: Page 1 Technician: Nuclear Gauge No. Make Model Ser. No. Density Std Moisture Std 6710-A Tohatsu 08/27/16 Duke Realty Duke Realty Edward Sesay 3529 Troxler 3430 2800 424 Field Compaction Summary, ASTM Nuclear Texas Registered Engineering Firm # F-8461 Description Proctor Method Uncorrected Max. Density Uncorrected Opt. MCSample No. D4S-1 Fat CLAY with Sand, Dark Brown ASTM D 698-12 Method A Standard 103.90 18.90 D4S-6 Sandy Fat CLAY, Light Gray ASTM D 698-12 Method A Standard 105.70 18.10 D4S-8 Fat CLAY With Sand, Dark Brown ASTM D 698-12 Method A Standard 95.10 22.80 Test Data Test No. Test Mode Station / Location Probe Depth (in.) Lift / Elev Corrected Maximum Dry Density (pcf) Corrected Optimum Moisture Content (%) % Oversize Wet Density (pcf) Dry Density (pcf) Moisture Content (%) Percent Comp. (%)CommentsP / F Sample No. 1 DT 8 Sidewalk 0.00 95.10 22.80 114.5 91.3 25.4 96.0 PD4S-8 2 DT 8 Sidewalk 0.00 105.70 18.10 128.0 104.2 22.9 98.6 PD4S-6 3 DT 8 Sidewalk 0.00 95.10 22.80 114.9 92.9 23.7 97.7 PD4S-8 4 DT 8 Transformer Pad 0.00 103.90 18.90 119.6 98.7 21.1 95.0 PD4S-1 Test Mode: DT = Direct Transmission BS = Back Scatter WO:65521 Texas Registered Engineering Firm # F-8461 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 1 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 08/27/2016 Duke Realty Sunny / 89 Duke Realty LMC Mix Designation:Multiple (see remarks)Mix Strength:Multiple (see remarks)Design Strength:3600 psi B to P min. 1 3032 76830374 9.5 9.5 08:23 08:48 09:00 37 2 0808 63001937 9.5 19.0 08:35 08:54 09:06 31 3 5015 76830375 9.5 28.5 08:32 09:03 09:14 *5.00 3.20(P)80 Mix. Des.: 5409 Mix Str.: 3600 psi42 4 1408 64414182 9.5 38.0 08:38 09:09 09:24 46 5 5030 76830376 9.5 47.5 08:39 09:20 09:32 53 6 0802 63001939 9.5 57.0 09:00 09:44 09:54 54 7 1510 76830378 9.5 66.5 09:14 09:46 10:00 46 8 0810 63001942 9.5 76.0 09:17 09:57 10:08 51 9 9118 63001944 9.5 85.5 09:30 10:17 10:28 58 10 0806 63001945 9.5 95.0 09:44 10:21 10:32 48 11 1420 76830381 9.5 104.5 09:59 10:35 10:45 46 12 3032 76830382 9.5 114.0 10:10 10:57 11:08 58 13 3035 76830385 9.5 123.5 11:46 12:15 12:34 *5.00 3.10(P)85 Mix. Des.: 5177 Mix Str.: 3000 psi48 * Location:By:Edward SesaySidewalk and Pavement ECS Texas, LLP WO:65521 * B to P - Batch to Placement time in minutes 2000.1.1.0