Forest Cove 2-CS 980701 992 ~04 ~547
CITY ~COPPELL a CITY OF COPPELL
07/01/98
r~:)pPETX- STI~EET$ D~:SZ(:Iq
July 1, 1998
Larry Davis, Construction Inspector
Brent Adams, Streets Division
Walk-thru Forest Cove Phase II, June 30, 1998
Listed below are street Division comments relative to
2.
3.
4.
5.
Scallop cracking at header.
Clean pipe.
walk thru.
Wrong object markers not installed properly *too shallow*.
Fill around valve stacks along Sandy Lake.
Grade ditch to drain.
6. Check all curbs - reseal.
Redwood not sealed.
Reseal header south side.
Random crack.