Loading...
Forest Cove 2-CS 980701 992 ~04 ~547 CITY ~COPPELL a CITY OF COPPELL 07/01/98 r~:)pPETX- STI~EET$ D~:SZ(:Iq July 1, 1998 Larry Davis, Construction Inspector Brent Adams, Streets Division Walk-thru Forest Cove Phase II, June 30, 1998 Listed below are street Division comments relative to 2. 3. 4. 5. Scallop cracking at header. Clean pipe. walk thru. Wrong object markers not installed properly *too shallow*. Fill around valve stacks along Sandy Lake. Grade ditch to drain. 6. Check all curbs - reseal. Redwood not sealed. Reseal header south side. Random crack.