Loading...
Prologis Park lot 4 Blk ADEVELOPMENT FEE TABLE Project:Prologis Park lot 4 Blk. A Date:6/8/2016 TOTAL AMOUNT DUE FEES DUE PRIOR TO FILING PLAT Water Impact Fee $7,794.00 (100% due at Issuance of Building Permit) Water Tap Inspection Fee $100.00 (100% due at Issuance of Water Meter) Water Meter Fee (Domestic)$882.00 (100% due at Issuance of Water Meter) Water Meter Fee (Irrigation/Fireline) $672.00 (100% due at Issuance of Water Meter) Water Meter Deposit (Domestic)$30.00 (100% due at Issuance of Water Meter) Irrigation/Fireline Meter Deposit $30.00 (100% due at Issuance of Water Meter) Wastewater Impact Fee $4,797.00 (100% due at Issuance of Building Permit) Wastewater Tap Inspection Fee $50.00 (100% due at Issuance of Building Permit) Utility Final Inspection Fee $50.00 (100% due at Issuance of Building Permit) Park Fee $0.00 $0.00 (100% due prior to Filing Plat) Roadway Impact Fee $96,115.20 $96,115.20 (100% due prior to Filing Plat) Street Light Fee Information not Available (100% due prior to Acceptance of Project) Street Sign Fee Information not Available (100% due prior to Acceptance of Project) Construction Inspection Fee Information not Available (100% due prior to Start of Construction) TOTAL $110,520.20 TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $96,115.20