Prologis Park lot 4 Blk ADEVELOPMENT FEE TABLE
Project:Prologis Park lot 4 Blk. A
Date:6/8/2016
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
FILING
PLAT
Water Impact Fee $7,794.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $100.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic)$882.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $672.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic)$30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $4,797.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $50.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 $0.00
(100% due prior to Filing Plat)
Roadway Impact Fee $96,115.20 $96,115.20
(100% due prior to Filing Plat)
Street Light Fee Information not Available
(100% due prior to Acceptance of Project)
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project)
Construction Inspection Fee Information not Available
(100% due prior to Start of Construction)
TOTAL $110,520.20
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $96,115.20