Forest Cove 2-CS 980625COPPELL, TEXAS 75019
J~e25,1~8
P.O. Box 478
Coppell, Texas 75019
972-462-0022
Mr. Robert Pope
Robert W. Pope and Associate
4011 W. Piano Parkway, Suite 104
Plano, TX 75093
RE: Street Sign Fee Assessment / Forest Cove Phase H
Dear Mr. Pope:
Enclosed with this letter you will find the street sign assessment for Forest Cove, Phase II. Prior to
the final acceptance of this project, a check in the amount of $901.23 should be made payable to the
.... City of Coppell and forwarded to Jennifer Armstrong, Finance Director, along with a copy of the
attached street sign fee assessment list.
Please provide a copy of your paid receipt to our office so that we will be able to verify payment of
the required fees and assure a successful completion of this project.
If you should have any questions please feel free to contact me at your convenience.
Sincerely.
Kenneth M. Griffin,
P.E.
Director of Engineering and Public Works
Jennifer Armstrong, Finance Director
Greg Jones, Building Official
Doug Stevens, Engineering Technician
Glenn Hollowell, Asst. Dir of Public Works
Doug SteVens, Engineering Technician
Per Birdsall, Sign/Signal Technician
RE: Street Division Sign Fee For ~5~T-~gU~ ~rA~Z,
The following fee should be assessed and collected on the above
referenced project. 100% due prior to final acceptance of project.
· Street Signs Fee
The following assessment is being made in accordance with the City of
Coppell Subdivision Ordinance Appendix A Chapter VIII A. The
following cost of those sign m_~terials required are based on current
pricing which is reviewed on a regular basis.
No Parking
Speed Limit 7~z=
Street Names
Yield w/names
Stop w/names
Warning Sign
Keep Right (median)
$54.12
$58.77
$71.88
$90.41
$I00.14
$64.68
$58.77
Object Markers (L&R) $34.57
'
* cost breakdowns may be obtained by written request
si gnf ee
Revised 4/10/98