Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Eckerd's-LR 981204 (6)
i G· GEOTECHNICAL ENGINE,_..,NG t GEE Consultants, Inc. E · C©NSTRUCTION MATERIALS TESTING 10046 Monroe Drive · Dallas, Texas 75229 · (214) 352-5433 - Fax (214) 352-6972 REINFORCING STEEL PLACEMENT Report Date: December 4, 1998 Test Date: December 3. 1998 Client: North American Properties-SW General Report No.: 3 Project Eckerds - Coppell. Texas Project No.: 298-0a 12 Identification Reinforcing Steel Inspection Method of Test Visual Inspection Page l of 1 Results On December 3, 1998. reinforcing steel was inspected at the following location: Piers: M-6.8; M-8: L-9: M-6.1; M-10: B-6: B-7: L-7: K-10; H-9: F-9: E-10: B-10: /~-3.2:A-5 There were no discrepancies. Tech: HG cc: Mr. John Maggiore - North American Properties-SW Mr. Lance Lmly - Richmond Gnmp Mr. GaD' Stokes - C .A. Walker Construction Mr. Lee Stone - City of Coppell Mr. Lam,.' Dav~.~ - CiD' of Coppell .... ~':2~,;:; ,':2;2 .':.;,i:/,''~ ,;~;':'2;;':.';~:":;: %,': .:: '7; '7.2;27..2;Z:';~2 iZ;u~ 7227.'.~7 ,'2[;',~ ;;'~ ~5~.~?'2%&, ii::2':i,'~;2': ~,',xS~ .....