Eckerd's-LR 981130G ° GEOTECHNICAL ENGINE .... NG
E GEE Consultants,
Inc.
E · CONSTRUCTION MATERIALS TESTING
0046 Monroe Drive ° Dallas, Texas 75229 · (214) 352-$433 · Fax (214) 3.52-6972
PIER INSPECTION REPORT
Report Date: November 30, 1998 Inspection Date: November 25. 1998
Client: North American Properties-SW Report No. 1
Project: Eckerds
Coppell. Texas
Identification: Straight Shaft Piers Project Number: 298-0412
Method of Test: Visual Observation Page: 1 of 1
Depth
to
Pier Shaft Bearing Req'd. Actual Total Bearing Casing
# Size Strata Pent. Pent. Depth Material Depth Remarks
L-O 36" ' i7'4" 6'0" 6'2" 23'6" Gray Shale N/A Clean. Plumb. Backhole used
tbr water
L-I 36" I?'6" 6'0" 6'2" 23'8" Gray Shale N/A Clean, Plumb. Backhole used
for water
J-! 36" [8'3" 6'0" 6'4" 24'7" Gray Shale N/A Clean. Plumb. Bacldaole used
for water
cc: Mr. John Maggiore - North American Properties-SW Mr. 'Lance Lilly - Rich.monO Group
Mr. Gap,' Stokes - C.A. Walker Construction
Mr. Lee Stone - City of Coppell
Mr. LarD' Davis - City of Coppell