Loading...
Blackberry Farm (2)TEXAS COMMISSION ON ENVIRONMENTAL QUALITY Texas Pollutant Discharge Elimination System Stormwater Construction General Permit The Notice of Intent (NOI) for the facility listed below was received on October 29, 2015. The intent to discharge stormwater associated with construction activity under the terms and conditions imposed by the Texas Pollutant Discharge Elimination System (TPDES) stormwater construction general permit TXR150000 is acknowledged. Your facility's TPDES construction stormwater general permit number is: TXR150021662 Coverage Effective: October 29, 2015 TCEQ's stormwater construction general permit requires certain stormwater pollution prevention and control measures, possible monitoring and reporting, and periodic inspections. Among the conditions and requirements of this permit, you must have prepared and implemented a stormwater pollution prevention plan (SWP3) that is tailored to your construction site. As a facility authorized to discharge under the stormwater construction general permit, all terms and conditions must be complied with to maintain coverage and avoid possible penalties. Project/Site Information: RN1o8847377 BLACKBERRY FARMS N. SIDE OF SANDY LAKE ROAD EAST OF KIMBLE KOURT COPPELL, TX 75019 DALLAS County Operator: CN60498o193 DENTON CREEK LAND COMPANY LTD 225 E VISTA RIDGE BLVD #120 COPPELL, TX 75o19 This permit expires on March 05, 2018, unless otherwise amended. If you have any questions related to processing, you may contact the Stormwater Processing Center by email at swpermit@tceq.texas.gov or by telephone at (512) 239-3700. For technical issues, you may contact the stormwater technical staff by email at swgp@tceq.texas.gov or by telephone at (512) 239-4671. Also, you may obtain information on the TCEQ web site at http://www2.tceq.texas.gov/wq_dpa/index.cfm. A copy of this document should be kept with your SWP3. Issued Date: October 29, 2015 FOR THE COMMISSION