Forest Cove 2-CS 980315From: Robert W. Pope To: Ken Griffin
Date: 3115/98 Time: 1:48:26 PM
ROBERT W. POPE & ASSOCIATES
4011 W. PLA_NO PARKWAY
SUITE 104
PLANO, TEXAS 75093
(972)964-8801 - FAX (972)596-6547
March 15, 1998
Page 2 of 2
Mr. Kenneth M. Griffin, P.E.
City Engineer
City of Coppell
255 Parkway Blvd.
Coppell, TX 75019
Re: Forest Cove Estates, Phase II
Dear Mr. Griffin:
Site Concrete, Inc. has been contracted to excavate the subject project; copies of the contract and a
check for applicable fees were forwarded to the City on February 23. At that time, we understood our
grading plans were approved and we were free to begin work. We now understand work cannot
proceed until the contractor has obtained a permit. The required application for that permit titled
"Early Grading/Excavation Permit" requires a letter from the "Property Owner/Engineer/Developer"
but does not specify what the letter is to address; we are hopeful the following will satisfy that
requirement.
The contract between Pacific United Development Corp. and Site Concrete, Inc. requires Site to install
and maintain erosion control per the approved plans. Weekly inspections of those facilities will be
performed by Mr. Danny Miller of Rodman Excavation.
Please accept this letter as our concurrence with the request of Site Concrete to be issued a permit for
the site grading and excavation. Please let me know if you need additional information.
Sincerely,
Robert W. Pope, P.E.
ce: Site Concrete, Inc. Mr. Larry Davis, City of Coppell
Mr. Danny Miller, Rodman Excavation, Inc.