Prologis Park-CS160926T H E - C I T Y • O F
COFFELL
September 26, 2016
Robert Gossett, P.E.
Halff Associtates
1201 North Bowser Road
Richardson, TX 75081
RE: Prologis Park One Twenty One
Northwest Drive — North of Freeport
Dear Mr. Gossett,
The City of Coppell has performed the first review of the referenced plans and has the following
comments to offer:
Cover—
t. Fix the name of the project.
2. Highlight the project location on the map.
General Notes -
3. Fire valves marked on curb (FHV) in red.
Paving Plan and Profile -
4. Missing profile lines
5. With a 2% grade you don't leave much room for error with ADA.
6. Label all PCRs, PCIS in both plan and profile.
7. Odd profile labes near 8+00.
8. Provide a lay down curb on north side of Subaru drive.
Signage and Stripin2-
9. May want to show FH markers
10. No street name blades on private drive.
Storm Drain Profiles -
11. Line A — bad HG labels, incorrect flow calculations, provide MH at station 0+00.
2
Water & Wastewater plan -
12. Show valves.
13. Cut in tee. No TS&V
Erosion Control Plan -
14. Need drop inlet protection prior to Ph III
15. Use city details no 2x4's in inlet protection.
The City of Coppell has reviewed the plans for the referenced addition which will be approved
with the comments above addressed.
The City of Coppell requires three sets of final construction plans for its use; your office should
submit as many additional sets for stamping as is necessary for construction operations. All
contractors and subcontractors onsite must have a copy of the plans approved by the City of
Coppell along with a copy of the City's standard construction details. We will also require a PH
version of the plans along with the DWG files.
All fees must be paid prior to release of this project for construction. The City charges a 2%
inspection fee for all private construction outside the building's footprint. This includes dirt work,
paving, storm drains, water lines, sewer lines, drainage pipes, etc. that are private. For all
installations in the public right-of-way or easement, the City charges a 4% fee. A check for
inspection fees made to the City of Coppell should be submitted to this office along with the
Construction Development Permit Application and a copy of the Construction Site Notice. For
your convenience a spreadsheet is attached to the permit application for use in calculating the
inspection fees. A copy of the contract(s) should be attached for verification purposes.
If you have any questions, please contact me at your convenience.
Sincerely,
George S. Marshall, P.E.
Engineering Manger
Office Phone: (972) 304-3562
P,marshall@coppelltx.gov