Vista Ridge Lot 6 D-CS160926 (2)T H E C 1 T Y O F
COPPELL
A_ 1
September 26, 2016
Robert W. Schneeberg, P.E.
Gonzalez & Schneeberg Engineers & Surveyors Inc.
660 Central Expy S #250
Plano, TX 75074
RE: Vista Ridge Blk D Lot6 (The Plaza)
Fee Assessment Letter
Dear Mr. Schneeberg:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the
Development Fee calculations for the referenced development.
Please make payment for the Impact Fees to the City of Coppell in the amount of $34,833.66 and forward
to the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of
the assessed fees that will need to be paid prior to filing of the final plat. Please note that the Water and
Sewer Impact Fees are due and payable at the issuance of a Building Permit. Also, please provide a copy
of the Engineer's estimate or contract to our office so the 2% & 4% construction inspection fee can be
verified. The construction inspection fees must be paid prior to scheduling a pre -construction meeting.
The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by
separate check at the Public Works Service Center, 816 S. Coppell Road. Meters will be ordered when
those fees are paid.
Appropriate payment of the required fees will help insure a successful beginning of this project. We look
forward to working with you on this project. If you have any questions, please contact me.
Sincerel
George S. Marshall, P.E.
Engineering Manager
cc: Jennifer Miller, Finance Director
Rachel Evans, Administrative Technician, Building Inspections
Michael Garza, P.E., Assistant Director of Public Works
Tim Oates, Deputy Chief/Prevention
Brad Reid, Director of Parks and Recreation
Suzanne Arnold, Chief Building Official
DEVELOPMENT FEE WORKSHEET
PROJECT: Vista Ridge Blk D Loth (The Plaza)
DATE: 912612016
Water Impact Fee:
Domestic Meter(s): 1 - 2 inch = 5.33 ESU's
Irrigation Meter(s): 0 = 0 ESU's
0 = 0 ESU's
Fireline Meter(s): 0 = 0 ESU's
Total #: 5.33 ESU's @ $900.00 ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 1 Domestic Meter(s) @ $882.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
(This fee may change at the time of pick up)
Irrigation/Fireline Water Meter Fee:
Total #: 0 Irrigation Meter(s) @ $0.00
Total #: 0 Additional Irrigation Meter(s) @ $0.00
Total #: 0 Fireline Meter(s) @ $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 1 Meter(s) @ $30.00 ea.
(1001/6 due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 0 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 5.33
(Due prior to issuance of building permit)
@ $900.00 ea.
Wastewater Tap Inspection Fee:
Total #: 1 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 1 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
Page 1
m(
DEVELOPMENT FEE WORKSHEET
Park Fee (For Residential Developments Only):
* Preliminary plat approved: After October 26, 1993
0
0
Single-family @ $0.00 per lot
Multi -family @ $0.00 per unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after Oncor submits
the lighting plan for the proposed development.
Once the plans are submitted, $352.44 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
DEVELOPMENT FEE WORKSHEET
$4,797.00
$50.00
$882.00
$0.00
$0.00
eter provided by developer
$30.00
$0.00
$4,797.00
$50.00
$50.00
Page 3
DEVELOPMENT FEE WORKSHEET
$0.00
$0.00
$16,154.89
Information not Available
Information not Available
Information not Available
Page 4
DEVELOPMENT FEE TABLE
Project: Vista Ridge Blk D Lot6 (The Plaza)
Date: 9/26/2016
TOTAL
AMOUNT DUE
FEES DUE
PRIOR TO
FILING
PLAT
Water Impact Fee
$4,797.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee
$50.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic)
$882.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline)
$0.00
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic)
$30.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit
$0.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee
$4,797.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee
$50.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee
$50.00
(100% due at Issuance of Building Permit)
Park Fee
$0.00
$0.00
(100% due prior to Filing Plat)
Pro Rata for 8" water line
$11,179.00
(100% due at Issuance of Building Permit)
Roadway Impact Fee
$16,154.89
$16,154.89
(100% due prior to Filing Plat)
Street Light Fee
Information not Available
(100% due prior to Acceptance of Project)
11
Street Sign Fee
Information not Available
(100% due prior to Acceptance of Project)
11
Construction Inspection Fee
Information not Available
(100% due prior to Start of Construction)
TOTAL
$37,989.89
$16,154.89
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT
ROADWAY IMPACT FEE CALCULATIONS
PROJECT: Vista Ridge Blk D Lo16 (The Plaza)
DATE: 9/26/2016
ROADWAY IMPACT FEE:
Service Area *
1
Category **
Office
Land Use **
Medical/Dental Office
Building Area (sf)
6,484
Development Units **
6.48
Vehicle Miles per Development Unit **
16.61
Fee per Vehicle Mile ***
$150
Roadway Impact Fee due = (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) _ $16,154.89
* (Figure 4.1 - Roadway Impact Fee Study)
** (Table 4.10 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - The Master Fee Schedule)