Loading...
Duke Freeport-LR160923 (2)Texas Registered Engineering Firm # F-8461 September 23, 2016 Duke Realty South/West Region 14241 North Dallas Parkway, Suite 1000 ATTN:Mr. Sean Jeanes, P.E. LEED AP Tohatsu Location: Permits: Dallas, TX 75254 19:6710-A NEC Bethel Road and Freeport Parkway Coppell, TX RE: ECS Job # 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] ECS Texas, LLP LETTER OF TRANSMITTAL CC:Duke Realty - Todd Henry Duke Realty - Glen Stevenson Pacheco Koch Consulting Engineers - Clayton J. Strolle, LEED AP City of Coppell - Matt Mabry Weir Bros., Inc. - Mike Weir Meinhardt & Associates - David Meinhardt LJB inc - Jim Lintz ENCL: We are enclosing: Materials Engineering Division Reports For your use As requested X X X Field Report # 113 09/20/2016 Various Flatwork Timothy TarbuttonMark R. Zortman, P.E. Principal Engineer Project ManagerSEP 23 2016 1000.1 This report (and any included attachments) shall not be reproduced, except in full, without the prior written approval of ECS. Texas Registered Engineering Firm # F-8461 ECS Texas, LLP 19:6710-A 113 Tohatsu Tuesday 09/20/2016 Project No. Report No. Day & DateProject 3033 Kellway Drive, Suite 110 Carrollton, TX 75006 (972) 392-3222 [Phone] (214) 483-9684 [Fax] FIELD REPORT 10.25 The undersigned arrived on site, as requested, to observe the placement of 54 cubic yards of 3000 psi concrete for Sidewalks, Stairs, and Various Flatwork. The required test limits were determined to be a slump of 3-5 inches, air content of 3-6 %, batch to placement time of 90 minutes, and concrete temperature range of 50-95 degrees Fahrenheit. Concrete observed on this date appeared to be placed in compliance with project specifications with regard to temperature, slump, air content, and batch to placement time, with the exception of truck 6039 exceeding 90 minute batch to final placement time. One set of five laboratory cured concrete cylinders were cast for compressive strength testing in our laboratory. 90°/ Sunny 55.00 9.25 0.00 0.00 06:45A 04:00P Various Flatwork Location Contractor On-Site Time Lab Time Client Coppell, TX Arrival Departure Summary of Services Performed (field test data, locations, elevations & depths are estimates) & Individuals Contacted. Duke Realty - Sean Jeanes, P.E. LEED AP Duke Realty - Sean Jeanes, P.E. LEED AP Trip Charges* Remarks Chargeable Items Weather Mileage* 1.00Travel Time* Total Time of Re Obs.Time * Travel time and mileage will be billed in accordance with the contract. Tolls/Parking*$5.00 Jean HabyarimanaBy 1800 1094827 Texas Registered Engineering Firm # F-8461 Concrete Summary Report Project: Location: Contractor : Supplier: Project No. Day/Date: Client: Weather / Temp: Page 1 No.Ticket No. Truck No. CY Concrete Truck Cum Batch Time Truck Time Arrive Finish Slump % Air Concrete Temp. Water Added Location and Remarks Tohatsu 6710-A NEC Bethel Road and Freeport Parkway Coppell, - Dallas County - TX 75019- 09/20/2016 Duke Realty Sunny / 90 Duke Realty LMC Mix Designation:5177 Mix Strength:3000 psi Design Strength:3000 psi B to P min. 1 7029 76831163 9.0 9.0 06:48 07:00 07:39 *4.00 3.50(P)90 2051 2 5015 76831165 10.0 19.0 06:44 07:20 07:50 66 3 5022 76831168 9.0 28.0 08:02 08:40 09:12 70 4 1407 76831170 9.0 37.0 09:00 09:51 10:15 2075 5 7003 76831174 10.0 47.0 10:46 11:24 12:10 84 6 6039 63003397 7.0 54.0 01:45 02:00 03:32 107 * Location:By:Jean HabyarimanaSidewalks, Satirs, and Various Flatwork ECS Texas, LLP WO:66374 * B to P - Batch to Placement time in minutes 2000.1.1.0