This is the schedule for the payment for the for the Denton Tap/Sandy Lake Project
Marcus Marion
MMarion@coppelltx.gov
469.576.7707
Begin forwarded message:
From: George Marshall <GMarshall@coppelltx.gov>
Date: September 26, 2016 at 10:26:06 AM CDT
To: Marcus Marion <MMarion@coppelltx.gov>, Kent Collins <KCollins@coppelltx.gov>, John Elias
<JElias@coppelltx.gov>, Matthew Mabry <MMabry@coppelltx.gov>
Subject: Fwd: Denton Tap
Fyi
Sent from my iPhone
George Marshall, PE
469-964-4731
Begin forwarded message:
From: Michael Beattie <michaelb@pavecon.com>
Date: September 26, 2016 at 10:15:53 AM CDT
To: George Marshall <GMarshall@coppelltx.gov>
Subject: Denton Tap
George here is plan to get us to the finish line. Let me know if you have any questions.
Stamped Concrete: 9/27/16 thru 10/3/16
Colored Concrete Medians: 10/3/16 thru 10/20/16
Misc. Concrete Flatwork: 10/10/16 thru 10/13/16
Oncor Punch list: 9/26/16 thru 9/30/16
Luminaires West Sandy Lake 9/20/16 thru 10/15/16
Monuments: 10/3/16 thur 10/21/16
Brick Veneer for Walls: 10/18/16 thru 10/21/16
Thank you,
Michael Beattie
Project Manager
1
michaelb@pavecon.com
469-503-0552
The linked image cannot be displayed. The file may have been moved,
renamed, or deleted. Verify that the link points to the correct file and location.
PO Box 535847
Grand Prairie, TX 75053
The
linke
d
imag
e
cann
ot
W
2