Loading...
CRDC1401-CS160927 Halie Hernandez From:Marcus Marion Sent:Tuesday, September 27, 2016 3:23 PM To:Halie Hernandez Subject:Fwd: Denton Tap Attachments:image001.jpg This is the schedule for the payment for the for the Denton Tap/Sandy Lake Project Marcus Marion MMarion@coppelltx.gov 469.576.7707 Begin forwarded message: From: George Marshall <GMarshall@coppelltx.gov> Date: September 26, 2016 at 10:26:06 AM CDT To: Marcus Marion <MMarion@coppelltx.gov>, Kent Collins <KCollins@coppelltx.gov>, John Elias <JElias@coppelltx.gov>, Matthew Mabry <MMabry@coppelltx.gov> Subject: Fwd: Denton Tap Fyi Sent from my iPhone George Marshall, PE 469-964-4731 Begin forwarded message: From: Michael Beattie <michaelb@pavecon.com> Date: September 26, 2016 at 10:15:53 AM CDT To: George Marshall <GMarshall@coppelltx.gov> Subject: Denton Tap George here is plan to get us to the finish line. Let me know if you have any questions. Stamped Concrete: 9/27/16 thru 10/3/16 Colored Concrete Medians: 10/3/16 thru 10/20/16 Misc. Concrete Flatwork: 10/10/16 thru 10/13/16 Oncor Punch list: 9/26/16 thru 9/30/16 Luminaires West Sandy Lake 9/20/16 thru 10/15/16 Monuments: 10/3/16 thur 10/21/16 Brick Veneer for Walls: 10/18/16 thru 10/21/16 Thank you, Michael Beattie Project Manager 1 michaelb@pavecon.com 469-503-0552 The linked image cannot be displayed. The file may have been moved, renamed, or deleted. Verify that the link points to the correct file and location. PO Box 535847 Grand Prairie, TX 75053 The linke d imag e cann ot W 2