Loading...
Memo-Ken Griffin 02-27-03 MEMORANDUM To: Ken Griffin, P.E.-City of Coppell From: Mike Jones Date: February 27, 2003 Re: West Sandy Lake Road Project The following is a suggested agenda for our meeting tomorrow. Depending on how much time you will have to spend with us in the morning, it may be necessary to schedule a follow-up meeting to address all of these issues in detail. Please feel free to prioritize the items for tomorrow’s meeting, as well as to add any additional items that from your perspective need to be discussed or clarified prior to us beginning the next phase of design. Suggested Agenda for 8:30 a.m. Meeting w/ City of Coppell Friday, February 28, 2003 Update Design Schedule Phase 1 – (Project ST 99-02 A) State Highway 121 to State Road Construction is anticipated to start in mid 2004 according to the City’s website. Complete Preliminary Design – August 1, 2003 Complete City Review – September 1, 2003 Complete Final Design – December 1, 2003 Begin R/W Acquisition – October 1, 2003 Begin Utility Relocations – January 1, 2004 Phase 2 – (Project ST 99-02 B) State Road to Denton Tap Road Construction is anticipated to start in mid 2007 according to the City’s website Complete Preliminary Design Complete City Review Complete Final Design Begin R/W Acquisition Begin Utility Relocations Public Meeting? Date/Location Information/Exhibits Format Discussion of Schematic Design Report and Plans – Phase 1 Issues Proposed Roadway Section: 6-Lane Divided; minimum r/w width-110 feet Proposed Pavement Section: 8-inch reinforced concrete pavement/8-inch lime stabilized subgrade Horizontal Alignment Limits of improvements (west end and east end) Status of MIS for State Highway 121 Proximity to north R/W line & TXU Overhead Transmission Towers Transition from 6-lanes to 4-lanes and vice-versa Vertical Alignment Signalization Royal Lane? State Road? Survey of Outfall Drainage (north of W. Sandy Lake Road) Royal Lane Include construction of southbound lanes and divided median? Median width Sidewalk Construction? Other City Review Comments Discussion of Schematic Design Report and Plans – Phase 2 Issues Proposed Roadway Section: 4-Lane Divided; minimum r/w width-90 feet Proposed Pavement Section: 8-inch reinforced concrete pavement/8-inch lime stabilized subgrade Horizontal Alignment Super-elevation/design speed Coppell Road North w/super-elevation: 40-42 mph w/o: 35-37 mph Coppell Road South w/super-elevation: 45-47 mph w/o: 40-42 mph Conflict w/TXU Transmission Poles Tree Preservation/Removal 4-Lane Divided vs. 4-Lane Undivided Bridge conflict w/ 24-Inch Water Line Vertical Alignment Retaining Walls 24-Inch Water Line Adjustment Lone Star Pipeline Adjustment Signalization Coppell Road North? Coppell Road South? Sidewalk/Trail Construction? Other City Review Comments Landscape/Streetscape Design Supplemental Surveys Updated Aerial/Topographic/GIS Information Utility Coordination Page 2 of 3 Teague Nall and Perkins ENGINEERS (SURVEYORS ( CONSULTANTS 1100 Macon Street, Fort Worth, Texas 76102 (817) 336-5773 (817) 336-2813 FAX Page 1 of 3